Supply Of S.S Tube And Double Ferrule Fittings For Air Spring Pnemuatic Control Eq Uipment And Fiba Device Of Lhb Coaches., As Per Drawing: Icf/Sk-10-2-637, Issue Status-01, R Ev-01,Cs-01, Cs-04 & Cs-05, As Per Icf Specification No.Icf/Md/Spec-166 , Issue Status-01,Re V-04, Amd-01 & Amd-02, Packing Instruction: No Special Packing Required. The Protruding, Th Readed Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitabl E Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At Th E Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] , Stainless Steel Tubes And Double Ferrule Fittings For Lslrd Coaches, As P Er Drawing: Material Schedule No. Icf/Sk-10-2-671, Issue Status-01, Rev-01, Cs-01 And As Per Specification No. Icf/Md/Spec-166, Issue Status-01,Rev-04, Amd-01 & Amd​02. [ Warranty Period : 30 Months After The Date Of Delivery ] , S S Tube & Double Ferrule Fittings For Lhb High Capacity Parcel Van With C Ollapsible Door & Luggage Racks With Fiat Bogies, As Per Drawing: Icf/Sk-10-2-681,Issue St Atus-01,Rev-00, And As Per Icf Specification No Icf/Md/Spec-166, Issue Status-01,Rev-04, P Acking Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gaug Es And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Preven T It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ W Arranty Period: 30 Months After The Date Of Delivery ] , Stainless Steel Tubes And Double Ferrule Fittings For Lgs (Lhb-Eog-Gs) Co Aches., As Per Drawing: Icf/Sk-10-2-634, Issue Status-01,Rev-01,Cs-01 & Cs-02 As Per Icf Specifi Cation No. Icf/Md/Spec-166,Issue Status-01,Rev-04, Amd-01 & Amd-02., Packing Instruction: As Pe R Standard Packing. It Should Be Ensured That Item Should Not Rub During Transpo Rtation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]