| 1 | Repair and Rehabilitation of School Building in Barahiya-Lakhisarai under Corporate Social Responsibility (CSR) initiative in FY 2024-25. |
| 2 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per directions of the Engineer-in-Charge. |
| 3 | Hacking of CC flooring including cleaning for surface etc. complete as per the directions of Engineer-in-Charge. |
| 4 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer, 3 mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc, and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : (a) Joint strength in longitudinal and transverse direction at 23°C as 650/450N/5cm. (b) Tear strength in longitudinal and transverse direction as 300/250N. (c) Softening point of membrane not less than 150°C. (d) Cold flexibility shall be up to -2°C when tested in accordance with ASTM, D-5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane. |
| 5 | Grading roof for water proofing treatment with : |
| 6 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | Providing gola 75x75 mm (in 75x75 mm deep chase) in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design. |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : |
| 9 | 1:2:4 [1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources] |
| 10 | Centering and shuttering including strutting, propping etc. and removal of formwork for : |
| 11 | Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 12 | Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/ honey-comb area of concrete/ masonry by suitable gun/ pump at required pressure including cutting of nipples after curing etc. complete as per directions of the Engineer-in-Charge. [Note: The payment shall be made on the basis of actual weight of approved grout injected] : |
| 13 | Stirrer mixed Acrylic Polymer of approved make (@ 2% of weight of cement used) modified cement slurry made with non shrink compound in Concrete/ RCC work. |
| 14 | Supplying and providing non-shrinkable cement grout (SHRINKKOMP 20 or any other equivalent approved brand) for grouting holding down bolts in pocket holes for equipment foundation, including necessary surface preparation mixing of grout, curing as per manufacturer\"s recommendation/ specification and directions of the Engineer-in-Charge. [Note: This item shall be operated under specific instructions of the Engineer-in-Charge] |
| 15 | 12 mm cement plaster of mix : |
| 16 | 1:4 (1 cement : 4 fine sand) |
| 17 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. |
| 18 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete : |
| 19 | On steel work |
| 20 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 21 | Supplying, fabricating, erecting, placing and fixing in position M.S. structural works using rolled/ built up sections for truss, claddings, bracings, purlins, supporting frames made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. including cutting to required size welding of joints, fixing anchor plates, including bolts, theading, nuts, washers, sleeves etc. includingpreparation of detailed fabrication drawings & submission to the Engineer-in-Charge for approval before start of fabrication, supplying & applying painting with two coats of epoxy paint \"EPILUX 155 High Build Enamel over a coat of \"EPILUX 610\" Primer of M/s BERGER or any other approved equivalent make as per manufacturer’s recommendation, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge. (Excluding the cost of concrete work). |
| 22 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of the Engineer-in-Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. [Note: This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done] |
| 23 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : |
| 24 | Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr/10 sqm |
| 25 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture. |
| 26 | Demolishing brick work in cement mortar manually or by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per the directions of Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations] |
| 27 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per the directions of Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations. (3) Cutting of all reinforcement shall be done using hack saw or chiesel or any other method as approved by the Engineer-in-Charge] |
| 28 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : |
| 29 | Of area 3.0 sq. metres and below |
| 30 | Of area beyond 3.0 sq. metres |