Madhyanchal Vidut Vitran Nigam Limited has published Tender For Quantum Of Work Involved In New 25 Kva Transformer,Fire Fighthing Equipment And Battery Set And Charger Replacement Etc Work Under Edsd-Ii And Edsd-Iii Edd-Ii Unnao Against Business Plan 2024-25 Part-1.. Submission Date for this Tender is 30-05-2024. Fire Fighting Consumable Tenders in unnao Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Carriage of Following material from elec. Storecentre unnao to different work dump site along with loading , unloading and proper stocking distance as per indent. |
2 | PCC Pole 8.5 mtr long |
3 | STP Pole 11 mtr long |
4 | ACSR Weasal Conductor |
5 | 11 KV XLPE Cable AL. 3X120 |
6 | 11 KV3X120 sqmm (O/D) C/J Kit |
7 | L.T. Cable 3-Ph ABC(3X50+1X35+1X16)sqmm |
8 | Battery Charger 24 Volt |
9 | Battery Set 24 Volt |
10 | 3-phase DO fuse set |
11 | 3-Phase Distribution Box |
12 | Transformer Oil |
13 | Loose line mattrial store to dump site with loading unloding and proper stocking. |
14 | Carriage of T/F from ESC Unnao to work site/ site to site with loading, unloading and proper stocking. |
15 | Transformer 25 KVA 11/0.4 KV |
16 | Stone Pad 300x300x75mm |
17 | LT Shackle Insulator |
18 | LT Clamp with Nut & Bolts |
19 | Holding Clamp for PCC Pole 8.5 mtr. Long with Nut & Bolt |
20 | Holding Clamp for STP Pole 11 mtr. Long with Nut & Bolt |
21 | Stay clamp with Nut & Bolt |
22 | F-Clamp for Top Insulator with N&B |
23 | Clamp of D.B.(40x6mm) |
24 | Long Barel Alluminium Lugs Crimping Type 95/120 sqmm.(for 25/63/100 KVA TF) |
25 | Flat Copper L pieces set 35x4 mm for LT bushing rod25/63/100 KVA Distribution Transformer. |
26 | Stay Insulator |
27 | G.I. pipe 6" Dia |
28 | Fire Extinguisher ABC Type 6 K.G. |
29 | Erection of PCC/STP Single Pole (HT/LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
30 | Erection of PCC/STP Double Pole (11 KV Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
31 | Fabrication/ Modifications of MS Items as per requirement of site conditions. |
32 | Making T-off arrangement including fabrication & fitting of accessories. |
33 | Earthing of PCC/STPpoles as per RESPO norms |
34 | Eathing of Transformer by MS Earth Rod as per RESPO Norms (Provide by Departmant) |
35 | Grouting of Pole as per RESPO Norms with grouting materials. |
36 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
37 | New Earthing for Power transformers neutral/body of transformer & other structure 60 ft.deep GI pipe of size 40 mm. making all arrangements for its recharging funnel with openable cover of steel chequered plate with hinges and making connections to transformer neutral/body/other structure by GI strip of size 35x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding. |
38 | Mounting of cable box Indore/Outdoor 3X120 sq mm |
39 | Digging of cable trench in one meter deep in:(a) Normal Soil /Kharanja Road/Metallic Road after layingduble circuit HT XLPE cable 3x120 sq mmwork complet Pit back filling brickand balaste remaining pack cable trunch as per RESPO norms etc. |
40 | Cable Hosting at Pole with GI Pipe dia 6"jumfring of cable proper Mounting of cable box Indore/Outdoor 3X120 sq mm crimping lugs etc.(GI Pipe as per requiredprovide by Contractor) |
41 | Installation & Connecting 3 ph Distribution Box in supply system |
42 | Installation & Connecting of 3 ph DO Fuse setin supply system |
43 | Installation & Connecting ofBattery Charger 24Vin supply system |
44 | Installation & Connecting ofBattery Set 24V in supply system |
45 | Top -Up T/F Oil of power transformer |
46 | Fencing of Swithyard 2m(height)x90m(length) approximately |
47 | Painting of Sub Station Structure in switchyard (necessary material will be provided by contractor) |
48 | Laying stringing and sagging of O/H Three Phase 11 KV Line by ACSR Weasal Conductor including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
49 | Laying stringing and sagging of O/H Three Phase LT Line by ABC (3X50+1X35+1X16)sqmm including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
50 | Placement of following11/0.433 KV Distribution Transformer from dump site to newly constructed T/F on Duble Pole and Installation cable termenation and commissioning of 25/63/100 KVA Transformerincludingdrassing damagedcable, lugs,Jumpering & connectingEarthing ofbody & neutral as per required. ( required mattrial as lugs, flat copper L plate, nuts & bolts etc for above job shall be provided by contractor) |
51 | Dismentalling,Carriage,Loading,Unloadingof following receive backmaterials from site to store centre with in 0-20 km :- |
52 | Receive Back Battery Cell 2V |
53 | Receive Back Scrap Battery Charger |