HLL INFRA TECH SERVICES LTD has published Tender For Construction Of Baba Sarsai Nath Government Medical College, Sirsa, Haryana. Submission Date for this Tender is 27-06-2024. Building Work Tenders in sirsa Haryana. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 22-May-2024 | Amendment 01 Sirsa | Other | 13-06-2024 |
2 | 31-May-2024 | Amendment-02 | Other | 13-06-2024 |
3 | 13-Jun-2024 | Date Amendment-03 | Date | 27-06-2024 |
FileName | File Description | File Size |
92b53389-ecea-46e0-aaec-49120c069a17.html | Tender Notice | 0 KB |
Vol-6Tenderdrawing-2.rar | Tender Document | 0 KB |
Vol-6Tenderdrawing-6.rar | Tender Document | 0 KB |
Volume-5-TechnicalSpecifi_1.pdf | Tender Document | 0 KB |
Volume4-DBRSIRSA.pdf | Tender Document | 0 KB |
BOQ_214380.xls | Tender Document | 0 KB |
Vol-6Tenderdrawing-3.rar | Tender Document | 0 KB |
Vol-6Tenderdrawing-7.rar | Tender Document | 0 KB |
Volume1-NITSIRSA.pdf | Tender Document | 0 KB |
Vol-6Tenderdrawing-1.rar | Tender Document | 0 KB |
Vol-6Tenderdrawing-5.rar | Tender Document | 0 KB |
Vol-6Tenderdrawing-9.rar | Tender Document | 0 KB |
Volume3-SCCSIRSA.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Vol-6Tenderdrawing-4.rar | Tender Document | 0 KB |
Vol-6Tenderdrawing-8.rar | Tender Document | 0 KB |
Volume2-GCCSIRSA.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | PART-A |
2 | Planning, Designing, and Construction on EPC Basis with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge. |
3 | Hospital Building |
4 | Medical College (Academic Block with Examination Hall) |
5 | College of Nursing, Paramedical & Physiotherapy including Basement Area |
6 | Boys Hostel & Intern Hostel |
7 | Girls Hostel & Intern Hostel |
8 | Hostel - Junior and Senior Resident |
9 | Nursing Girls Hostel |
10 | Director & M.S. Residence |
11 | Vishram Sarai |
12 | Sports Building |
13 | Pump Room |
14 | Common Basement |
15 | Autopsy Block |
16 | MGPS + Gas Manifold |
17 | ESS (Sub Station) |
18 | Solid Waste Management Building |
19 | Planning, Designing, and Construction onEPC Basis with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work mentioned in tender documents and directions of Engineer In charge: Infrastructure and External Development - Civil & Services Works such as Internal Roads & Storm drains, CC Road with Foot Path, Drain and Trench, Rain Water Harvesting, External Water Supply Network, External Sewer System & Boundary Wall including motorized Steel Gate and other Gate , Landscaping etc. |
20 | Borewell with boring , Starter and cabling, interconnection, testing etc. complete as per scope of works and directions of Engineer In charge. |
21 | Internal Roads, CC Road with Footpath (Complete including sub base, Kerb Stones, Joints etc) |
22 | Open Path Ways/ Building approach/ droff off including sub base, Kerb Stones, Joints etc) |
23 | Open/ Surface Parking (including subgrade etc. complete) |
24 | Landscaping & Horticulture Works along with Irrigation system |
25 | Boundry Wall of campus with Gates & Security Cabins |
26 | Water Supply System |
27 | Sewerage System |
28 | Drainage System |
29 | External Street Lighting System inclduing Cables, Panel etc |
30 | Rain Water Harvesting System |
31 | Outdoor Sport Facilities |
32 | Under Ground RCC Water & Firefighting Tanks - Civil & Services Complete as per scope of works and directions of Engineer In charge. |
33 | STP cum ETP along withRCC Tanks and Civil works for STP cum ETP with Pipe Lines ,comprising of membranes, pumps & other Equipment & accessories complete as per scope of works and directions of Engineer In charge. |
34 | WTP with Pipelines - Civil & Services Completeas per scope of works and directions of Engineer In charge |
35 | Planning, Designing, and Construction onEPC Basis of INFRASTRUCTURE& EXTERNAL DEVELOPMENT – Fire Fighting System inside fire pump room comprising of Fire Pumps, piping, valves, vessels and accessories etc including externalhydrant ring main system, FHC, fire brigade inlet/ drawout connection etc. with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer In charge. |
36 | Planning, Designing and Construction onEPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical Substation, HSD Yard and its piping, Electrical HT/LT cabling within substation and from substastion to various buildings with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer In charge. |
37 | DG Sets (2 X 2000 KVA+ 1 X 1500 KVA ) complete withall accessories as per scope of works and as directed by Engineer-In-charge |
38 | Distribution Transformers (4 X 2500 KVA )complete with all accessories as per scope of works and as directed by Engineer-In-charge |
39 | 33 KV HT Panels, Main LT Panels, DG Dync Panels, Hybrid Capacitor Panels, Sandwich Bus ductsetc. complete in all respect as per scope of works and as directed by Engineer-In-charge |
40 | 33 kV HT Cabling workas required complete in all respect and LT Power Cables & Control Cables/ wires from ESS ( Substation) to various all buildings/ utilities etc. and within the Substation as required complete in all respect and as directed by Engineer-In-charge. |
41 | HSD Storage Yard comprising of HSD Storage UG Tanks (2 X 20 KL), Pumps, Panels, Pipelines, power/ control cabling, digital flow meters, piping network up to DG Sets in ESS substation, Chain Link Fencing, equipment foundations, civil works, Fire Fighting Equipment etc. as per scope of works complete in all respect and as directed by Engineer-In-charge. |
42 | Planning, Designing, and Construction onEPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – such as HVAC Plant Room (High Side) & all Low side equipment including Chilled & Hot water piping network from HVAC plant room to various all buildings with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer In charge |
43 | Chillers with Chiller Plant Manager and VFDs , Cooling Towers,Primary, Secondary & Condenser Water Pumps, Hot Water Generators and Hot Water Pumps with VFD, piping, valves, insulation, fittingsetc. ,LT Panel for HVAC Plant (High Side Equipment) and other starter panels, electrical items, cables etc., Chilled/ Hot/ Condenser Water Pumps complete with external & internal Piping, valve, fittings , indulation andVacuum Degasser, Air & Dirt Separator,Pressurized Expansion Tank etc.complete with piping and all accessories as per scope of works and as directed by Engineer-In-charge. |
44 | AHUs, FCUs, TFA units for all centrally Air-conditioned Buildingscomplete with Piping, AHU Room Acoustic Insulation, Piping insulation, valve, fittings complete with all accessories as per scope of works and as directed by Engineer-In-charge. |
45 | Ventilation System comprising of Smoke Extraction System, Pressurization System complete with ducting,electrical works, fittings complete with all accessories as per scope of works and as directed by Engineer-In-charge. |
46 | Planning, Designing, and Construction onEPC Basis of INFRASTRUCTURE& EXTERNAL DEVELOPMENT-Solid Waste Management System complete comprising of Sterilizers, Organic Waste Convertors, Collection Binsand other related accessories etc. with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer In charge. |
47 | PART-B |
48 | Planning, Designing, and Construction onEPC Basis with required services and utilities including handing over complete as per scope of work mentioned in the tender documents and directions of Engineer In charge: Modular Operation Theatres and Integration(inclusive of 5 Year Warranty) |
49 | Planning, Designing, and Construction onEPC Basis with required services and utilities including handing over complete as per scope of work mentioned in the tender documentsand directions of Engineer In charge: Medical Gas Pipeline System & LMO(inclusive of 5 Year Warranty) |
50 | Planning, Designing, and Construction onEPC Basis with required services and utilities including handing over complete as per scope of work mentioned in the tender documentsand directions of Engineer In charge: Central Sterile Services Department (CSSD) |
51 | Planning, Designing, and Construction onEPC Basis with required services and utilities including handing over complete as per scope of work mentioned in the tender documentsand directions of Engineer In charge: Kitchen |
52 | Planning, Designing, and Construction onEPC Basis with required services and utilities including handing over complete as per scope of work mentioned in the tender documentsand directions of Engineer In charge: Laundry |
53 | PART-C |
54 | Planning, Designing, and Supply & Installation on EPC Basis of FURNITURE as per stipulated specifications, complete in all respect including handing over complete as per scope of work mentioned in Tender documents and directions of Engineer In charge. |
55 | PART-D |
56 | CMC of MGPS for Five years after completion of Five Years Warranty Period. |
57 | 1st Year |
58 | 2nd Year |
59 | 3rd Year |
60 | 4th Year |
61 | 5th Year |
62 | CMC of MOT for Five years after completion of Five Years Warranty Period. |
63 | 1st Year |
64 | 2nd Year |
65 | 3rd Year |
66 | 4th Year |
67 | 5th Year |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail