Tender For Increasing Capacity Of Transformer And Additional Dp In Area Of Edd-Garh In Business Plan 2024-25, hapur-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Increasing Capacity Of Transformer And Additional Dp In Area Of Edd-Garh In Business Plan 2024-25. Submission Date for this Tender is 20-05-2024. Transformer Supply Tenders in hapur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43337523
Corrigendum : Tender For Increasing Capacity Of Transformer And Additional Dp In Area Of Edd-Garh In Business Plan 2024-25
Open Tender
Indian
Uttar Pradesh
hapur
20-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Increasing Capacity Of Transformer And Additional Dp In Area Of Edd-Garh In Business Plan 2024-25

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-May-2024 date exten Date 20-05-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 30000.0 /-
Tender Value
INR 29.81 Lakhs /-

Attachment

FileName File Description File Size
c385fc53-d8b3-4ea6-9843-89e073a84908.html Tender Notice 0 KB
BOQ_1596590.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Tendernotice_2.pdf Tender Document 0 KB

BOQ Items

Name of Work: FOR CONSTRUCTION OF NEW ADDITIONAL DOUBLE POLE AND INCREASING CAPACITY OF TRANSFORMERS AND OHTHER ASSOCIATED WORKS, IN BUSINESS PLAN (2024-25), IN THE AREA OFEDD-GARHMUKTESHWER, UNDER EDC., HAPUR.
Sl. No. Item Description
1Increasing Capacity of 100/160 to 250KVA at various places as per sanctioned estimate, in area of EDD-Garhmukteshwer. (Third party inspection of the quality of all works will be conducted by the department.)
2Carriage of all petty material of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends,as per direction of site incharge.
3Carriage of all cable/conductor of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends,as per direction of site incharge.
4Safely dismantling of old 100/160KVA Transformer from Double Pole after open the connection, as per direction of site incharge.
5Carriage of New 250KVA transformer from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading safely at both ends, as per direction of site incharge.
6Construction of T/F plinth suitable for 250KVA T/F (size of2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour and as per direction of site incharge.
7Safely installing the New 250KVA transformer with the help of crane/manual labour at LT Sub-Station Double Pole/Plinth, as per direction of site incharge.
8Laying of LT Aluminum XLPE Cable 1x240Sqmm., by providing & fixing of required good quality lugs and completion of work properly as per RESPO/Norms, and as per direction of site incharge.
9Connecting of the Jumper of LT & HT side and line energisation work properly, including fixing all required accessories at Double Pole/Plinth,as per direction of site incharge.
10Erection & Fixing of 11KV. DO Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge.
11Erection and Fixing of 11KV Lightening Arrestor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
12Construction of safety fencing (MS) for Transformer 11/0.4 KV Sub Station, With supply of material required for MS fencing (50X50X3 MM) M.S. wire mesh construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal angle/T-iron to be fitted on vertical posts. Pickets (if required) fitted to rail and gate to facilitate entry and exit. The vertical Posts/Horizontal post shall be made of M.S. angle 75x75x6mm. Such post shall be kept preferably at distance of 800-1000 MM. and shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge.
13Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrod size 80mm x 3000mm complete with 50KG backfill compound with all required accessories for Body earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms and as per direction of site incharge.
14Earthing of neutral & body of T/F By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 120 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support as per direction of site incharge.
15Carriage of old 100/160KVA transformer from site of work to JE Store/CTR/ESC, Hapur, with loading & unloading safely at both ends., as per direction of site incharge.
16Construction of New 63/100/ 250KVA 11KV Sub-Station double pole, in area of EDD-Garhmukteshwer, as per sanctioned estimate. (Third party inspection of the quality of all works will be conducted by the department.)
17Carriage of line material (all petty material as per estimate) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
18Carriage of all cable/conductor of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends, as per direction of site incharge.
19Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
20Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
21Carriage of New 63KVA transformer from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading safely at both ends, as per direction of site incharge.
22Carriage of New 100KVA transformer from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading safely at both ends, as per direction of site incharge.
23Carriage of New 250KVA transformer from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading safely at both ends, as per direction of site incharge.
24Erection of double pole structure with all accessories on ST Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin,Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
25Erection of double pole structure with all accessories on PCC Pole 8.5 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin,Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
26Construction of T/F plinth suitable for 250KVA T/F (size of2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour and as per direction of site incharge.
27Construction of safety fencing (MS) for Transformer 11/0.4 KV Sub Station, With supply of material required for MS fencing (50X50X3 MM) M.S. wire mesh construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal angle/T-iron to be fitted on vertical posts. Pickets (if required) fitted to rail and gate to facilitate entry and exit. The vertical Posts/Horizontal post shall be made of M.S. angle 75x75x6mm. Such post shall be kept preferably at distance of 800-1000 MM. and shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge.
28Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrod size 80mm x 3000mm complete with 50KG backfill compound with all required accessories for Body/neutral earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms and as per direction of site incharge.
29Earthing of neutral & body of T/F By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 120 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
30Safely installing the New 250KVA transformer with the help of crane/manual labour at LT Sub-Station Double Pole/Plinth, as per direction of site incharge.
31Laying of LT Aluminum XLPE Cable 1x240Sqmm., by providing & fixing of required good quality lugs and completion of work properly as per RESPO/Norms, and as per direction of site incharge.
32Laying of LT Aluminum XLPE Cable 1x400Sqmm.,by providing & fixing of required good quality lugs and completion of work properly as per RESPO/Norms, and as per direction of site incharge.
33Laying of LT Aluminum PVC Cable 3.5x400Sqmm., by providing & fixing of required good quality lugs and completion of work properly as per RESPO/Norms, and as per direction of site incharge.
34Connecting of the Jumper of LT & HT side and line energisation work properly, including fixing all required accessories at Double Pole/Plinth, as per direction of site incharge.
35Installation of 63/100KVA T/F on double pole and line energisation work properly, as per RESPO Norms, and as per direction of site incharge.
36Erection & Fixing of 11KV. DO Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge.
37Erection and Fixing of 11KV Lightening Arrestor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
38Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops., as per direction of site incharge.
39Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts., as per direction of site incharge.
40Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials., and as per direction of site incharge.
41Jumpering and line energisation work properly as per RESPO/Norms.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail