Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Construction Of 11 Kv Line Agriculture Feeder And Othr Work 33 / 11 Kv Ss Ronda Under Edd Iii Bulandshahr, 2 Carriage Of Fallowings From Esc. Bsr To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Rcquricd. Submission Date for this Tender is 15-05-2024. Bolts Tenders in bulandshahr Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | fo|qr forj.k [k.M&r`rh;] cqyUn"kgj ds dk;Z{ks= esa 33@11 dsoh fo|qr midsUnz&jkS.Mk ls iksf’kr Ñf"k iks"kd ls la;ksftr 11 dsoh o ,y-Vh- ykbZu o vU; dk;ZA |
2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 80 Kms. |
3 | PCC from E.S.C Bulandshahr to Site. |
4 | STP from E.S.C Bulandshahr to Site. |
5 | Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
6 | Erection of Single support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
7 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
8 | Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc |
9 | Laying, sagging. Stringing and binding and jumpering of ACSR Weasel conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
10 | fixing of Stay rod with Stay wire in proper way with Nozelling. |
11 | Grouting of Stay rods . |
12 | Earth rod complete. |
13 | Chopping of Tree branches.. |
14 | Tightening of Stay |
15 | Grouting of PCC/STP Pole Old |
16 | Change of broken/Damaged/Missing following Items:- |
17 | Disc Insulator |
18 | Pin Insulator. |
19 | Nut & Bolt off size |
20 | Bended X-Arm/Angle/Channel |
21 | Ailment of PCC/STP Pole |
22 | F-Clamps |
23 | Stay Insulator |
24 | The following material is required to be The following material is required to be supplied by the contractor. |
25 | Stay clamp. |
26 | Stay insulator. |
27 | L.T. clamp. |
28 | L.T. shackle insulator. |
29 | L.T. insulator bolt6 ench. |
30 | F clamp. |
31 | Bolt & nut off size. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail