Paschimanchal Vidyut Vitran Nigam Limited has published Tender For The Work Of Maintenance Of Lt Lines With Dismantling Of Lt Line Ab Conductor Including Replacement Of Damaged Poles/Strengthening Of Poles Etc. Under 33/11 Kv Sub-Station Rangoli In The Area Of Eudsd Xi, Meerut Under Eudd-Iii, Meerut.. Submission Date for this Tender is 27-05-2024. Conductor Tenders in meerut Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 08-May-2024 | DATE EXTENSION-1 | Date | 15-05-2024 |
2 | 15-May-2024 | DATE EXTENSION-2 | Date | 22-05-2024 |
3 | 22-May-2024 | DATE EXTENSION-3 | Date | 27-05-2024 |
FileName | File Description | File Size |
85ed2d20-760a-4f51-9d0a-5d23c92d9bd6.html | Tender Notice | 0 KB |
BOQ_1595790.xls | Tender Document | 0 KB |
TECHNICAL05.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Dismantling of LT AB Conductor near Gurudwar and laying in gali in nehru nagar- |
2 | Dismantling of LT AB Conductor od spare circuit near Gurudwara |
3 | Cartage of above conductor form work site to 33/11KV S/S Rangoli and later on to new work site in nehrunagar with loading /unloading etc |
4 | Laying of LT AB conductor with lifting , sagging and binding etc |
5 | making section of LT lines with tapping by LT PVC Tape etc. |
6 | opening /binding of consumer services properly |
7 | Re-sagging of loose LT AB conductor of connecting lines. |
8 | jumpering of LT line sections . |
9 | providing /fixing of MS clamps off size. |
10 | providing /fixing of MS bolt/Nuts off size . |
11 | providing / fixing of LT shackle insulators of size 100x115 mm size. |
12 | strengtheing of HT/LT line poles with digging of pits around the poles , repairing /strengtheing of poles ,back filling of soil ramming etc . |
13 | dismantling of damged Guarding of 11KV line spans near devi mandir in sector 3-4 road safely. |
14 | Repair / re- laying of guarding spans of 11 KV lines safely complete, |
15 | Replacement of damaged PCC Pole at gali no.14 moh.phool bag- |
16 | Dismantling of damaged PCC Pole after making it free form conductor on the corner. |
17 | Erection of off size S.T Pole safely after digging of pit and fixing of accessories etc. |
18 | Dismantling and laying of LT AB Conductorsafely . |
19 | opening /binding of consumer services before / after works. |
20 | Providing /Fixing of MS Clamps off size. |
21 | providing/ fixing of MS Bolt /Nuts off size. |
22 | Re- erection of PCC stud support on nai sarak due to construction of naala on road side - |
23 | Digging of pit near the road side for leaving space for the construction of naala and making free the stud support of PCC pole form the LT section pole and shifting the same in to new safe side and re-erection of same properly. |
24 | Dismantling /re- laying of LTAB conductor on the section pole safely |
25 | jumpering at sections of LT Lines . |
26 | Cutting / chopping of trees branches along the lines for its claarance |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail