}

Alteration Of Phase Working Of Shri Singaji Thermal Power Project At Khandwa, Shifting Of Signalling Gears In Connection With Metro Bridge Pillar In Rkmp Yard & Rob Work 573 /16-20 Between Mathela & Khandwa Railway Stations In Connection With 4-Laning O, Bhopal-Madhya Pradesh

West Central Railway has published Alteration Of Phase Working Of Shri Singaji Thermal Power Project At Khandwa, Shifting Of Signalling Gears In Connection With Metro Bridge Pillar In Rkmp Yard & Rob Work 573 /16-20 Between Mathela & Khandwa Railway Stations In Connection With 4-Laning O. Submission Date for this Tender is 24-05-2024. Railway Signaling Systems Tenders in Bhopal Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43272934
Alteration Of Phase Working Of Shri Singaji Thermal Power Project At Khandwa, Shifting Of Signalling Gears In Connection With Metro Bridge Pillar In Rkmp Yard & Rob Work 573 /16-20 Between Mathela & Khandwa Railway Stations In Connection With 4-Laning O
Open Tender
Indian
Madhya Pradesh
Bhopal
24-05-2024

Tender Details

Alteration Of Phase Working Of Shri Singaji Thermal Power Project At Khandwa, Shifting Of Signalling Gears In Connection With Metro Bridge Pillar In Rkmp Yard & Rob Work 573 / 16-20 Between Mathela & Khandwa Railway Stations In Connection With 4-Laning Of Rudhi To Deshgaon Section Of Nh-374B

Key Value

Document Fees
Refer document
EMD
INR 243900.0 /-
Tender Value
INR 1.87 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail