Bharat Sanchar Nigam Limited-BSNL has published Tender For External Annual Repair And Maintenance Of And Special Repairs To Type-Iii Staff Quarters No. 7 To 13 In Bsnl Staff Colony, Subash Nagar, Haldwani. Submission Date for this Tender is 06-05-2024. Building Work Tenders in haldwani Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
2 | In cement mortar |
3 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): |
4 | From brick work in cement mortar |
5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
6 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : |
8 | 1:2:4 (1 Cement : 2 coarse sand derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : |
10 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
11 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. |
12 | Cement mortar 1:4 (1 cement :4 coarse sand) |
13 | Grading roof for water proofing treatment with |
14 | Cement mortar 1:4 (1cement : 4 coarse sand) |
15 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge. |
16 | 12 mm cement plaster of mix : |
17 | 1:6 (1 cement: 6 coarse sand) |
18 | 15 mm cement plaster on rough side of single or half brick wall of mix : |
19 | 1:6 (1 cement: 6 coarse sand) |
20 | Neat cement punning |
21 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
22 | One or more coats on old work. |
23 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
24 | Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface). |
25 | Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
26 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground , all complete as per directions of Engineer-In-Charge. |
27 | With cement mortar 1:4 (1cement: 4 coarse sand). |
28 | Providing and fixing double scaffolding system for repair works on the exterior/interior side or as required, upto four storey height made with bamboos 1.50 m c/c horoizontal and vertical bamboos along with challies tied with ropes & wires with suitable climbing ladders and working platforms, including, maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding all complete as per direction of Engineer-in-Charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The |
29 | payment will be made once only for execution of all items for such works. |