Irrigation And Flood Control Department-IFCD has published Tender For Stage Contract Phase 1St For Restoration And Maintenance Of Khalri Khul And Its Minors For The Year 2024-25 Isd Sangrama.. Submission Date for this Tender is 06-05-2024. Irrigation Work Tenders in Sangrama Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. |
2 | Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. |
3 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
4 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil. |
5 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil. |
6 | Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth. |
7 | Deduct for not watering the excavated earth for banking. |
8 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil. |
9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). |
13 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
14 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
15 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
16 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
17 | Supply and staking of B.A wire knitted Crates (Mesh size 4 ""x4"" ), with dia wire 4mm of approved made and make including all sorts of carriages up to the actual site ofwork complete in all respects to the entiresatisfictionofEngineer incharge. |
18 | Dumping stone excluding cost of stones. In Horizontal on level |
19 | Dumping stone excluding cost of stones.on Slopes (Behind pitching) |
20 | Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%) |
21 | Supply of Stone for masonry work (quarry) |
22 | Supply of Stone boulder (quarry) nominal size 225 mm (Stack measurements reduced by 15%) |
23 | Filling empty cement bags with sand/ earth; including cost of sewing and stringsexcluding cost of bag earth/ sand |
24 | Providing and laying in position ofsand/ earth; filled geo bags with filled capacity 0.075 cum per No, including cost of bag, filling of bag, swing and strings, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc but excludng cost of filling material,(complete job) as per directions/ satisfaction of Engineer in charge |
25 | Providing and laying in position ofgeo bags with filled capacity 0.075 cum per No, filled withEarth /Sandincluding cost of bag, filling of bag, swing and strings, filling material, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc (complete job) as per directions/ satisfaction of Engineer in charge |
26 | Providing and laying in position ofsand/ earth; filled mega bags with filled capacity 0.95 cum per No, including cost of bag, filling of bag, swing and strings, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc but excluding cost of filling material,(complete job) as per directions/ satisfaction of Engineer in charge |
27 | Providing and laying in position ofmega bags with filled capacity 0.95 cum per No, filled withEarth / Sandincluding cost of bag, filling of bag, swing and strings, filling material, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc (complete job) as per directions/ satisfaction of Engineer in charge |
28 | Supplying and stacking of good earthat site including royalty (earth measured in stacks will be reduced by 20% for payment) |
29 | Capturing and printing HD photographs of size (4"x 6") on good quality standard photopaper |
30 | Supply of sand for filling of bags or other works including carriage, royality and or other taxes, loading, unloading, stacking etc complete job |
31 | Supply of EC bags as and where required incluing all sorts of carriages (manual/ mechanical) loading , unloading, etc complete job |
32 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
33 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
34 | Centering and shuttering including strutting, propping etc. and removal of form for: |
35 | Foundations, footings, bases of columns etc. for mass concrete. |
36 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
37 | Suspended floors, roofs, landings, balconies and access platforms. |
38 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
39 | Slip clearance; In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
40 | Slip Clearence In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
41 | Dismantling of old protection work including cutting crates and stacking of stones |
42 | Hire charges for engagement of Chain saw ( Mechanical woood cutter) incl operator fuel, maintainence all sorts of carriages complete job |
43 | Opening out old wire crates those and re-binding after filling. |
44 | Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m. |
45 | Placing in dry |
46 | Placing in Water |
47 | Loading/Unloading sand/ earth filled Geo bags in lorries;lead upto 50m. |
48 | Placing in dry |
49 | Placing in Water |
50 | Placing of sand/ earth filled bags In Dry |
51 | Placing of sand/ earth filled bags In water |
52 | Supply of crusher dust for filling of bags including carriage, royality and or other taxes, loading unloading stacking etc complete job |
53 | Shingle clearance from canals. |
54 | 12mm cement plaster of mix 1:4 (1cement : 4 fine Sand) |
55 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: |
56 | 1:3:6 or richer mix (i/c equivalent design mix) |
57 | 1:4:8 or leaner mix (i/c equivalent design mix) |
58 | Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on horizontal/side slopes; complete including curing. |
59 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
60 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
61 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded. |
62 | Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations. |
63 | Dry stone pitching (any thickness) excluding cost of stones. |
64 | On Horizontal |
65 | On Top copings of banks |
66 | On Slopes |
67 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
68 | Quarry |
69 | Nallah |
70 | Dry random rubble masonry with hard stone in foundation and plinth: with bond stone |
71 | Quarry |
72 | Nallah |
73 | Open timbering over areas including strutting, shoring etc. complete (Measurements to be taken of the face area timbered): |
74 | Depth not exceeding 1.5 m. |
75 | Depth exceeding 1.5 m but not exceeding 3 m |
76 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
77 | Petrol for running of Departmental chain saw ( wood cutter) of required add mixtures |
78 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. |
79 | Engagement of Boatman |
80 | Boat (capacity upto 20 cum) |
81 | Engagement of labour / Beldar, Mazdoor |
82 | Fitter |
83 | Blacksmith IInd Class |
84 | Mason average |
85 | Carpenter |
86 | Painter |
87 | Hire charges for engagement of mechanical excavator (J.C.B)including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (tyre type) |
88 | Hire charges for engagement of mechanical excavator (J.C.B)including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (poclain type) normal boom. |
89 | Hire charges for engagement of mechanical excavator (J.C.B)including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (poclain type) long boom. |
90 | Hire and running charges forlight crane. Including fuel ,driver and Crawling charges etc complete job |
91 | Hire charges ofChain MountedEarth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job |
92 | Hire charges of Tractor with a load capacity of 70 Cfts including fuel, driver and Running Chargesetc complete job |
93 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
94 | Beyond 30cm girth upto and including 60cm girth. |
95 | Beyond 60cm girth upto and including 120cm girth |
96 | Beyond 120 cm girth upto and including 240 cm girth. |
97 | Providing, Laying, spreading and fixingof LDP to check / stop the leakages of canals including the fixing / locking arangements by any means throught the entire length / breadth as per the requirment at site of work and as desired by Engineer incharge complete in all respects |
98 | Providing, installation, commissioning and testing of single winch machine, complete set of standard quality of 03 ton capacity with double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling , all sorts of carriages and extra carriages upto site of work complete job |
99 | Providing, installation, commissioning and testing of double winch machine, complete set of standard quality of 05 ton capacity with coupling rod, coupling set double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling , all sorts of carriages and extra carriages upto site of work complete job |
100 | Providing, driving and installing poplar wood piles of 6" to 8" girth, and length 10 feet incl. all sorts of carriages, taxes, loading unloading etc complete job as per the directions/satisfaction of engineer in charge. |
101 | Structural steel work in single section fixed without connecting plate including cutting , hoisting fixing in positionand applying a priming coatof approved steel primer all complete |
102 | Structural steel work welded in built up section,trusses and framed work including cutting hosisting , fixing in position and applying a priming coat of approved steel primer all complete |
103 | cutting charges of Mild steel pipes/ plates including cost of consumables etc but excluding the cost of transpotation charges of eqipment site |
104 | Using Grinder |
105 | By Gas cutting |
106 | welding charges of preperedmilde steel sections etc incliuding cost of consumbles etc but exculding carriage ofequipment to site etc |
107 | By electrict welding |
108 | By Gas Welding |
109 | Providing and fixing precoated galvanised steel sheet roofing accessories0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws completeBarge board (Upto 300 mm |
110 | Weed clearance |
111 | From lakes(using boats) |
112 | From canals(including extraction of roots) |
113 | Hire charges of vehicle during day or night alongwith licensed commercail driver for site inspection/emegency suituation/ movement of officials/ including driver and POL on need basis etc |
114 | only upto 30 KM journey |
115 | for every KM after 30 Km |
116 | Checking of leakages b.w.o repairing/ replacing of rubber seal of standard quality in gates, complete job |
117 | Providing and fixing of greese lids for winch machines |
118 | Providing and fixing of pipe sleeves (rain water pipes) incl priming coat and two coats of mettalic |
119 | Repairs to side channels b.w.o removal of bends and kinks incl setting and fixing, complete job |
120 | Overhauling of winch machines including all sorts of carriages, cleaning, greesing/oiling, replacement/worm out nuts/bolts etc and refixing/realignment of lever system after application of lubricants, as per Engineer in charge (complete job |
121 | Repair of winch rods including removal of bends kinks etc refixing and reallignment in required position including replacement of Check nuts rusted nuts and bolts etc as per site requirements. Complete job |
122 | Repairs to shuter by way of removing dents, kinks and setting of iron gate |
123 | Disassembling and reasembling of chainsaw wood cutter and making necessary repairs including all accessories for repair work with all sorts of carriages complete job |
124 | Hire and running charges of tipper includingcost of lubricating oil, diesel at 8 working hours per day including driver |
125 | Hire charges of Pumpset of capacity 4000 litres/hour |
126 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
127 | Providing and Laying PVC Pipes with all the required accessories and carriages Of approved brand and quality complete Job. |
128 | 100 mm |
129 | 150 mm |
130 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of jointscomplete . |
131 | 600mm dia R.C.C pipe (24") |
132 | 450mm dia R.C.C pipe (18") |
133 | 300mm dia R.C.C pipe (12") |
134 | 250mm dia R.C.C pipe (9") |
135 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (Earth) |
136 | upto 1 km |
137 | 2 km |
138 | 3 Km |
139 | 4 km |
140 | 5 km |
141 | Beyond 5 Km upto 10 km /km |
142 | Beyond 10 Km upto 20 km /km |
143 | Beyond 20 km /everyadditional Km |
144 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (Stone solling) |
145 | upto 1 km |
146 | 2 km |
147 | 3 Km |
148 | 4 km |
149 | 5 km |
150 | Beyond 5 Km upto 10 km /km |
151 | Beyond 10 Km upto 20 km /km |
152 | Beyond 20 km /everyadditional Km |
153 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (40 mm Agregrate) |
154 | 1 Km |
155 | 2 km |
156 | 3 Km |
157 | 4 km |
158 | 5 km |
159 | Beyond 5 Km upto 10 km /km |
160 | Beyond 10 Km upto 20 km /km |
161 | Beyond 20 km /everyadditional Km |
162 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( 20 mm Aggregate) |
163 | 1 Km |
164 | 2 km |
165 | 3 Km |
166 | 4 km |
167 | 5 km |
168 | Beyond 5 Km upto 10 km /km |
169 | Beyond 10 Km upto 20 km /km |
170 | Beyond 20 km /everyadditional Km |
171 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 600mm ) |
172 | 1 Km |
173 | 2 km |
174 | 3 Km |
175 | 4 km |
176 | 5 km |
177 | Beyond 5 Km upto 10 km /km |
178 | Beyond 10 Km upto 20 km /km |
179 | Beyond 20 km /everyadditional Km |
180 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 450mm ) |
181 | 1 Km |
182 | 2 km |
183 | 3 Km |
184 | 4 km |
185 | 5 km |
186 | Beyond 5 Km upto 10 km /km |
187 | Beyond 10 Km upto 20 km /km |
188 | Beyond 20 km /everyadditional Km |
189 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 300mm ) |
190 | 1 Km |
191 | 2 km |
192 | 3 Km |
193 | 4 km |
194 | 5 km |
195 | Beyond 5 Km upto 10 km /km |
196 | Beyond 10 Km upto 20 km /km |
197 | Beyond 20 km /everyadditional Km |
198 | Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 250mm ) |
199 | 1 Km |
200 | 2 km |
201 | 3 Km |
202 | 4 km |
203 | 5 km |
204 | Beyond 5 Km upto 10 km /km |
205 | Beyond 10 Km upto 20 km /km |
206 | Beyond 20 km /everyadditional Km |
207 | Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (Earth) |
208 | for first 50 mtrs. |
209 | for every additional 50 mtrs |
210 | Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (stone solling) |
211 | for first 50 mtrs. |
212 | for every additional 50 mtrs |
213 | Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (40 mm stone aggregate) |
214 | For First 50 Mtrs |
215 | for every additional 50 mtrs |
216 | Carraige of materials from dumping siteto actual site of work by manual means including cost of loading, unloading and stacking etc ( RCCpipes1st 50m ) |
217 | 600mm |
218 | 450mm |
219 | 300mm |
220 | 250mm |
221 | Carraige of materials from dumping siteto actual site of work by manual means including cost of loading, unloading and stacking etc ( RCCpipes Additional50m ) |
222 | 600mm |
223 | 450mm |
224 | 300mm |
225 | 250mm |
226 | Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (20 mm aggregate) |
227 | For First 50 Mtrs |
228 | for every additional 50 mtrs |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail