| 1 | SCHEDULE \"A\" |
| 2 | Excavationover areas n.exc1.5m deep and getting out inHard / Dense Soil. |
| 3 | M&L Hardcoreofgaugenotexceeding 63mmofbroken stonesorboulders,deposited,spreadandlevelledin layersnotexceeding 15cmthick,wateredand rammed to a true surface completeall as specified and directed. |
| 4 | M&L 100 mm thick PCC (1:4:8) type-D-2 using40 mm graded stone aggregate as in sub base floors for receiving tiles complete all as specified and as directed. |
| 5 | M&L 100 mm thick PCC 1:2:4,type-B-1 using20 mm graded stone aggregate as in flooring finished even and smooth without using extra cement complete all as specified and as directed. |
| 6 | Forming contraction(dummy) joints 100mm deep x 10mm wide, 3.00 m C/Cfilled with sealing compound Grade \"A\" complete all as specified and as directed. |
| 7 | Removing excavated material in hard/dense soilexc 1.50 Km and not exc 5.00 Km out side the campus including loading and unloading etc., where responsibility regarding place of deposition and permission from all authorities etc., in this regard will be of contractor and allas specified. |
| 8 | Removing/ grinding the existing acrylic surface, opening of the existing cracks and filling the same using 100 percent acrylic emulsion elastomeric crack sealant and followed by application of Acrylic patch binder to level the current undulations to a maximum possible level to avoid water logging complete all as specified and directed. |
| 9 | Supply and aplication of \"SUNFLEX\" Grand Prix acrylic synthetic cushioned surfacing system consisting of complete all as specified and directed.1) Cleaning the base surface2)Application of bonding coat3)One layer of black base (Resurfacer)4)Three layer of cushion flex5)One layer of seal coat6)One layer of acrylic Grand Prix base coat colour7)One layer of acrylic non-texured Grand Prix top coat finish colour8)Game line marking with approved colourAll complete as per international standard and quality. |
| 10 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/ dense soil complete all as specified and directed. |
| 11 | M&L for PCC (1:4:8) type D-2using 40mm graded stone aggregate as in foundation all as specified and directed |
| 12 | M&L for Brickwork with flyash bricks (old size) straight or curved on plan exc 6m mean radius, built in CM 1:6 complete all as specified and directed. |
| 13 | M & L for cement concrete in copings,bands, etc.PCC 1 : 2 : 4 type B0 (12.50 mm graded stone aggregate) including necessary form work, weathering, slightly rounded or chamferred angles and throating as directed. |
| 14 | M & L for Rendering in CM 1:4, 15 mm thick on other than fair faces of brick work or concrete surfaces finished with even and smooth without using extra cement . |
| 15 | Returning , filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in soil. |
| 16 | M& L for precast cement concretetype B1 1:2:4 (20 mm graded stone aggregate) in cover slab etc set in cement mortar 1:4 includingall necessary form work.Note : Reinforcement will be measured and paid separately under relevant items here in after. |
| 17 | Material and labour for TMT bars, 8 mm dia and over cut to length bent to shape required including cranking, hooking ends and binding with mild steel wire (annealed )not less than 0.9mm dia all as specified and as directed. |
| 18 | Dismantling to Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as specified and directed |
| 19 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. |
| 20 | Demolition of brick or stone boulder masonry built in cement mortar or cement lime mortar. |
| 21 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exceeding 15 cm thickness (below or above ground level) complete all as specified and directed. |
| 22 | M&L for Welding in repairs, exc 2.5 cm but n exc 5 cm in length with thickness of metal to be welded n exc 6 mm. |
| 23 | M&L for Repair to existing hanger steel sliding door shutter of leaf of size 4.50 M(clear width) 6.00 M (clear height) of each,straightening of worn-out top & bottom rails,replace unserviceable existing rollers ,tightening/replacing the loose nut and bolts,necessary/required welding of rails with hanger structure , replacaement of broken locking arrangement etc,oiling ,greasing ,etc and one coat of aluminium paint to complete door structure etc for smooth functioning of hanger door shutter complete all as specified and directed. |
| 24 | S&F Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of and colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and directed. |
| 25 | S&F Pre-painted galvalume aluminum zinc coating GI based Plain steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding towall, fixed with self tapping screws complete all as specified and directed. |
| 26 | S&F for Rolled sections as in main and cross beams, hip and jack rafters; purlins where connected to common rafters and running rails and guides for sliding doors; fixed with angle cleats or other connecting plates conforming to Fe-290 (Gde E-165). |
| 27 | M&L for two coats of aluminium painton old steel surfaces over 10 cm girth including necessary preparation of old surfaces complete all as specified and directed. |
| 28 | M&L for applying two coats of aluminium paint over a coat of aluminium oxide primer on new steel surfaces over 10 cm girth including necessary preparation of surfaces complete all as specified and directed. |
| 29 | M&L for Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc. |
| 30 | M&L for light shade Vitrified Ceramic tiles 10 mm thick(square/ rectangular) polished, area of each tiles not exceeding 0.36 sqm, in floors, set and jointed in neat cement slurry and pointed in white or coloured cement to match including screed bed or bedding layer of cement plaster 1:4mortar 15mm thick for laying floor finishes complete all as specifed and directed. |
| 31 | S & F for 12mm thick Fibre insulation boards, ordinary type, and fixed in Ceiling including placing in GI framework complete all as specified and directed.Note:- GI frame shall be measured and paid seperately. |
| 32 | S&F for powder coated Gl frame work of grid size 605x605mmfor seamless ceiling comprising of Gl perimeter channnel 0.55 mm thick with two unequal flanges of 20 and 30 mm and web of 27 mm fixed to surrounding wall using nylon sleeves and screws at 450 mm centre to centre/intermediate channel 0.9 mm thick having two equal flanges of 15 mm each and web of 45 mm suspended from soffit at approx 900 mm centre to centre with Gl cleat and steel expansion fasteners with and including ceiling section (not exc 1.2 m length) of 0.55 mm thickness having kurled web of 50 mm and flange of 26 mm each with lips of 10.5 mm fixed to the intermediate channel with connecting clips across the intermediate channel at 457 mm centre to centrecomplete all as specified and directed. |
| 33 | S & F hangers 6mm dia GI(upto 1200mm length) adjusting level fixed to roof slabs by means of ceiling cleats made out of GI flat 40 x 3mm size 60mm long and expansion hold fasteners 12.5 mm dia 40 mm long complete all as spd and directed. |
| 34 | S&F for grills for air circulation for turbo ventilator made with powder coated aluminium frames of size 600x600mm fixed in false ceiling grid thickness not less than 2mm complete all as specified and directed by the Engineer-in-Charge |
| 35 | S&F wind operated Turbo Ventilators of size 24 inches dia with FRB base plate. Material of construction for ventilator is High grade Industrial Aluminium of thickness not less then 0.5mm. Material of construction for Hardware is stainless steel -304. Bearing shall be of steel in compleately enclosed and dustproof integrated housing and aligned with each other, It shall have capability to rotate at nearly zero wind speed. Turbo ventilator shall have UV stabilized powder coated and capable of static balancing shall have high exhaust capacity and there shall not be any exhaust problem due to air back draft. Fixing arrangement shall have high quality rubberized hardware to prevent rain Ingren. All Turbo Ventilators to be installed by manufacturer’s auth person only. Contractor shall give no leakage guaranty for period of three years from the date of installation of Turbo Ventilator all as specified and directed. |
| 36 | M&L for 75mm thick, plain cement concrete (1:3:6), type C-2 (using 40 mm graded mechanically crushed stone aggregates),as in plinth protection/path/hardstanding including making joints @ 3.00 metre intervals and at each corner, the joint shall be filled with mastic filling (to full depth) comprising of one part heated hot blown bitumen 85/25 & two parts heated sand (by volume), surface finished even and smooth without using extra cemen complete all as specified and as directed.Note :-The concrete shall be laid at a stretch not exceeding 3 metre in length and width of joint shall not be more than 12 mm. |
| 37 | M&L for Plain cement concrete typeB-1,1:2:4(20mm graded aggregate) as in coping, benching of manholes including necessary form work complete all as specified. |
| 38 | Removal of demolished material to distane exc 1.50 Km and not exc 5.00 Km complete all as specified and directed. |
| 39 | Taking down carefully copper/Alu point wiring (light, fan. socket or power) complete including fixtures and fitings such as switches, ceiling roses, pendents, regulators, sockets , light fitting etc and removing materialsto store for keeping in safe custody or for taking credit (credit for above items should be made as per conditions separetely) and making good distrubed surfaces of walls, floors etc. |
| 40 | Wiring complete with 1.5 sqmm single core PVC insulated, unsheathed FRLS 1100 volts grade,FRLS cable and incl Stove enemelled steel conduitwith accessories in wall/roof/ceiling/hangar steel frames etc incl Modular terminal boxes fabricated with 1.6mm MS sheet concealed/fixed surface to wallscovered with plastic laminated top cover 2.8mm fixed with cadmium plated iron screws etc and 1.5 sqmm PVC insulated, unsheathed copper conductor multistrandedcable 1100V grade as earth continuity conductor & connecting to common earth dolly all as specified for One light point/fan/bell point controlled by one switch |
| 41 | All as per item No. 40 here in before but for One 3 pin socket out 5 ampon the same board |
| 42 | All as per item No.40 here in before but for one switch socket outlet 3 pin 5 Amps on independent board |
| 43 | All as per Sl No 40above but Wiring with 4 Sqmm copper multistranded unsheathed cable and 4 Sqmm copper cable for earth continuity conductor controlled by one 15A switch socket independently |
| 44 | Wiring complete with 1.5 sqmm single core PVC insulated, unsheathed FRLS 1100 volts grade,FRLS cable and incl PVC Casing Cappingwith accessories in wall/roof/ceiling/hangar steel frames etc incl Mpodular terminal boxes fabricated with 1.6mm MS sheet concealed/fixed surface to wallscovered with plastic laminated top cover 2.8mm fixed with cadmium plated iron screws etc and 1.5 sqmm PVC insulated, unsheathed copper conductor multistrandedcable 1100V grade as earth continuity conductor & connecting to common earth dolly all as specified for One light point/fan/bell point controlled by one switch |
| 45 | All as per item No. 44 here in before but for One 3 pin socket out 5 ampon the same board |
| 46 | All as per item No. 44 here in before but for one switch socket outlet 3 pin 5 Amps on independent board |
| 47 | All as per Sl No 44above but Wiring with 4 Sqmm copper multistranded unsheathed cable and 4 Sqmm copper cable for earth continuity conductor controlled by one 15A switch socket independently |
| 48 | S&F modular switch 1 way 6 Amps, 1 module. |
| 49 | S&F modular switch 1 way 16 Amps, 1 module. |
| 50 | S&Fmodular socket outlet multipurpose 2/3 pin 6 amps, 2 module. |
| 51 | S&Fmodular socket outlet multipurpose 2/3 pin 6/16 amps, 2 module. |
| 52 | S&F white cover plate with frame, 3 Module. |
| 53 | S&F white cover plate with frame, 6 Module. |
| 54 | S&F white cover plate with frame, 8 Module. |
| 55 | S&F metal flush box 3 module. |
| 56 | S&F metal flush box 6 module. |
| 57 | S&F metal flush box 8 module. |
| 58 | S&F electronicmodular fan regulator 230 volts, step type socket type, hum free 120 watt 2 Module. |
| 59 | S&F ceiling rose, surface type Bakelite 65x55mm3 terminal |
| 60 | Supply and fixing LED luminaire 600 mm x 600 mm, 35/36 watt, 220 V AC recessed type with high efficiency PMMA diffuser soft glare free light complete with driver, holders & LED lamp suitable for roof ceiling including connecting up with driver three core flexible copper conductor cases of suitable size complete. |
| 61 | Supply and fixing LED Building security light fitting 35 Watt 230 V AC outdoor type with high pressure die cast aluminum hosing and heat resistant complete with driver, lamp bracket with impact and corrosion resistant including thermal management in multiple optics complete with IP 65/66 protection complete including pipe. |
| 62 | Supply and fixing ceiling fans complete with blades, down rods, electronic regulator and accessories, 230 V, 1200 mm sweep. Min air delivery 210 CFM with service value 6.00 BEE. Five starrated with brushless direct current motor (BLDC) |
| 63 | Supply and fixing down rod15 mmmedium grade GI tube fxingfor ceiling fan with necessary cutting, screwing and fixing on angle iron all as specified and directed |
| 64 | M&L forindustrial typeheavy duty wallmounted fan 450 mm sweep single phase 230 volts including fixing arrangement on wall/angle all as directed by Engineer -In-Chargecomplete. |
| 65 | M&L for energy efficient wallmounted fan 400 mm sweep single phase 230 volts including fixing arrangement on wall/angle all as directed by Engineer -In-Chargecomplete. |
| 66 | Supply and fixing replacementfactory madepowder coated distribution board TPN 4 way vertical type, double doorincludingbus bar, Neutral bar, standard DIN rail, earth bar acomplete all as specified and directed |
| 67 | Supply and fixing replacementfactory madepowder coated distribution board SPN 8 way, double doorincludingbus bar, Neutral bar, standard DIN rail, earth bar acomplete all as specified and directed |
| 68 | S&F Triple pole Nuetral MCB 63 Amp , 415 v, 50 Hz ACsuitable for ‘C’ curve, 10 KA breaking capacitycomplete conforming to IS 8828 of 1996 all as specified |
| 69 | S&F MCB SPN32 Amp , 240 v, 50 Hz ACsuitable for ‘C’ curve, 10 KA breaking capacitycomplete conforming to IS 8828 of 1996 all as specified |
| 70 | Supply and fixing singlepole MCB 6 to 32 Amps, 240 v, 50 Hz ACsuitable for ‘C’ curve, 10 KA breaking capacity conforming to IS 8828 of 1996all as specified |
| 71 | Sub main wiring for circuit complete with 2 X 6 sqmm single core PVC insulated, unsheathed FRLS1100 Volt grade multi stranded copper conductor cable drawn through and incl suitable dia metallic Steelconduit and accessories complete fixed surface to wall/roof/ceiling etc and incl 1 X 6 sqmm single core PVC insulated, unsheathed FRLS 1100v grade multi stranded copper conductor cable as earth continuity conductoretc and all as specified: |
| 72 | Sub main wiring for circuit complete with 2 X 4 sqmm single core PVC insulated, unsheathed FRLS1100 Volt grade multi stranded copper conductor cable drawn through and incl suitable dia metallic Steelconduit and accessories complete fixed surface to wall/roof/ceiling etc and incl 1 X 4 sqmm single core PVC insulated, unsheathed FRLS 1100v grade multi stranded copper conductor cable as earth continuity conductoretc and all as specified: |
| 73 | Supply,installation and commissioning advanced day lighting system of 750 mm Light Pipe with Dome + Diffuser + Flashing Plate with thefollowing accessories of 2.4 MtrsLength. Make : Sky Shade or equivalent |
| 74 | M&L earthing complete with GI earth plate electrode 600mmx 600mmx 6mm thick buried in ground vertically to a depth not less than 2.25 mtrs below ground level with top edge of earth plate not less than 1.5 mtrs below ground level connected with GI earth strip 32mmx6mm thick and GIbolts, nuts, etc and protected by GI pipe light grade 40mm bore and 20 mm dia GI tubing light grade with funnelfor watering, connecting to test point, all as shown in electrical plate No.3 of SSR Part I incl necessary earth work and excavation in any type of soil, PCC earth chamber withRCC cover slab, salt, charcoal and MS hook, ane provn of test point complete.NOTE : GI wire upto 7.5 Mtrs shall be included in quoted rates and beyond 7.5 mtrs shall be measured and paid separately. |
| 75 | Supply and fix IP 66 Pole Mounted street lighting Junction Boxfor controling building security lights 160x240x120 mm made of Polycarbonate, supplied with 1 No. 6A Amp 10KA SP MCB, 1 No. 63A 4P FR Polyamide color coded RYBN Terminals Block, 1 No. each of Earth & Neutral Terminal mounted on 35mm DIN channel and fitted inside Enclosure alongwith Pole Mounting bracket, pole clamp & hardware made of Stainless Steel 304. The Junction Box enclosure Cover should have 2 nos Polycarbonate Hinges with SS 304 Hinge pin, for Cover not to detach from Base on opening and should be properly tightened to base with Polycarbonate screws having sealing gaskets of extruded silicon rubber. |
| 76 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 35 sq mm 3.5 core |
| 77 | Removing excavated materials not exceeding 50m distance and depositing where directed at level not exceeding 1.5 m above the starting point complete all as specified and directed. |
| 78 | Riddling Sand obtained from excavation for cable protection 8cm under the cable and 15cm above the cable in trench and get the thick layer of 18cm after ramming complete all as specified and directed. Note :- In case sufficient sand not obtained from excavation, the quoted rate is deemed to be inclusive for the required additional qty obtain from out side MD land as directed by the Engineer-in-Charge. |
| 79 | MM & L for Protection to cable with one layer of Fly ash bricks of size 23 x 10 x 10 cm laid flat butting to each other in such a way that the length of the bricks is at right angle to the central axis of the cable. |
| 80 | S&F air termination sigle pointed aluminium rod of 12mm dia and 300mm length fixed to aluminium strip 25x3.15 mm including nuts, bolts and washers complete all as specified and directed the Engr in charge. |
| 81 | Supply and fixingalluminium strip 25 x3.15mm thickwith saddles and fixing screws etc. For roof conductors above ground all as directed. |
| 82 | S&F epoxy base insulators of suitable size 40mm height for fixing GI earth strip on wall/ceiling/floor/poles etc. |
| 83 | M&L for earth test pointterminal block made of gun metal or phosphorus bronze size 75x75x25mm drilled and screwed including 3 nos. 8mm dia 25mm long hex. head screw all as specified and directed by Engr in charge. |
| 84 | Total of Schedule \"A\" |