Tender For Stage Contract Phase 1St For Restoration And Maintenance Of Delina Wagoora Khul And Its Minors For The Year 2024-25 Isd Sangrama., sopore-Jammu And Kashmir

Irrigation And Flood Control Department-IFCD has published Tender For Stage Contract Phase 1St For Restoration And Maintenance Of Delina Wagoora Khul And Its Minors For The Year 2024-25 Isd Sangrama.. Submission Date for this Tender is 19-04-2024. Irrigation Work Tenders in sopore Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

43154978
Tender For Stage Contract Phase 1St For Restoration And Maintenance Of Delina Wagoora Khul And Its Minors For The Year 2024-25 Isd Sangrama.
Open Tender
Indian
Jammu And Kashmir
sopore
19-04-2024

Tender Details

Stage Contract Phase 1St For Restoration And Maintenance Of Delina Wagoora Khul And Its Minors For The Year 2024-25 Isd Sangrama.

Key Value

Document Fees
INR 300 /-
EMD
INR 5000.0 /-
Tender Value
INR 2.50 Lakhs /-

BOQ Items

Name of Work: Stage contract phase 1stfor restoration and maintenance of Delina Wagoora Khul and its minor"s for theyear 2024-25 ISD Sangrama. [Amount of Work= Rs 2.50 Lacs].
Sl. No. Item Description
1Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
2Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
3Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
4Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.
5Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.
6Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth.
7Deduct for not watering the excavated earth for banking.
8Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil.
9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
10Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
11Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
12Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
13Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
14Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
15Hand-packing stones in wire-crates; excluding cost of crates and stones
16Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
17Supply and staking of B.A wire knitted Crates (Mesh size 4 ""x4"" ), with dia wire 4mm of approved made and make including all sorts of carriages up to the actual site ofwork complete in all respects to the entiresatisfictionofEngineer incharge.
18Dumping stone excluding cost of stones. In Horizontal on level
19Dumping stone excluding cost of stones.on Slopes (Behind pitching)
20Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)
21Supply of Stone for masonry work (quarry)
22Supply of Stone boulder (quarry) nominal size 225 mm (Stack measurements reduced by 15%)
23Filling empty cement bags with sand/ earth; including cost of sewing and stringsexcluding cost of bag earth/ sand
24Providing and laying in position ofsand/ earth; filled geo bags with filled capacity 0.075 cum per No, including cost of bag, filling of bag, swing and strings, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc but excludng cost of filling material,(complete job) as per directions/ satisfaction of Engineer in charge
25Providing and laying in position ofgeo bags with filled capacity 0.075 cum per No, filled withEarth /Sandincluding cost of bag, filling of bag, swing and strings, filling material, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc (complete job) as per directions/ satisfaction of Engineer in charge
26Providing and laying in position ofsand/ earth; filled mega bags with filled capacity 0.95 cum per No, including cost of bag, filling of bag, swing and strings, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc but excluding cost of filling material,(complete job) as per directions/ satisfaction of Engineer in charge
27Providing and laying in position ofmega bags with filled capacity 0.95 cum per No, filled withEarth / Sandincluding cost of bag, filling of bag, swing and strings, filling material, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc (complete job) as per directions/ satisfaction of Engineer in charge
28Supplying and stacking of good earthat site including royalty (earth measured in stacks will be reduced by 20% for payment)
29Capturing and printing HD photographs of size (4"x 6") on good quality standard photopaper
30Supply of sand for filling of bags or other works including carriage, royality and or other taxes, loading, unloading, stacking etc complete job
31Supply of EC bags as and where required incluing all sorts of carriages (manual/ mechanical) loading , unloading, etc complete job
32Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
33Thermo-Mechanically Treated bars of grade Fe-500D or more.
34Centering and shuttering including strutting, propping etc. and removal of form for:
35Foundations, footings, bases of columns etc. for mass concrete.
36Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
37Suspended floors, roofs, landings, balconies and access platforms.
38Edges of slabs and breaks in floors and walls Under 20 cm wide
39Slip clearance; In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
40Slip Clearence In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.
41Dismantling of old protection work including cutting crates and stacking of stones
42Hire charges for engagement of Chain saw ( Mechanical woood cutter) incl operator fuel, maintainence all sorts of carriages complete job
43Opening out old wire crates those and re-binding after filling.
44Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m.
45Placing in dry
46Placing in Water
47Loading/Unloading sand/ earth filled Geo bags in lorries;lead upto 50m.
48Placing in dry
49Placing in Water
50Placing of sand/ earth filled bags In Dry
51Placing of sand/ earth filled bags In water
52Supply of crusher dust for filling of bags including carriage, royality and or other taxes, loading unloading stacking etc complete job
53Shingle clearance from canals.
5412mm cement plaster of mix 1:4 (1cement : 4 fine Sand)
55Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:
561:3:6 or richer mix (i/c equivalent design mix)
571:4:8 or leaner mix (i/c equivalent design mix)
58Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on horizontal/side slopes; complete including curing.
59Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
60Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
61Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded.
62Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
63Dry stone pitching (any thickness) excluding cost of stones.
64On Horizontal
65On Top copings of banks
66On Slopes
67Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)
68Quarry
69Nallah
70Dry random rubble masonry with hard stone in foundation and plinth: with bond stone
71Quarry
72Nallah
73Open timbering over areas including strutting, shoring etc. complete (Measurements to be taken of the face area timbered):
74Depth not exceeding 1.5 m.
75Depth exceeding 1.5 m but not exceeding 3 m
76Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
77Petrol for running of Departmental chain saw ( wood cutter) of required add mixtures
78Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
79Engagement of Boatman
80Boat (capacity upto 20 cum)
81Engagement of labour / Beldar, Mazdoor
82Fitter
83Blacksmith IInd Class
84Mason average
85Carpenter
86Painter
87Hire charges for engagement of mechanical excavator (J.C.B)including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (tyre type)
88Hire charges for engagement of mechanical excavator (J.C.B)including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (poclain type) normal boom.
89Hire charges for engagement of mechanical excavator (J.C.B)including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (poclain type) long boom.
90Hire and running charges forlight crane. Including fuel ,driver and Crawling charges etc complete job
91Hire charges ofChain MountedEarth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job
92Hire charges of Tractor with a load capacity of 70 Cfts including fuel, driver and Running Chargesetc complete job
93Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
94Beyond 30cm girth upto and including 60cm girth.
95Beyond 60cm girth upto and including 120cm girth
96Beyond 120 cm girth upto and including 240 cm girth.
97Providing, Laying, spreading and fixingof LDP to check / stop the leakages of canals including the fixing / locking arangements by any means throught the entire length / breadth as per the requirment at site of work and as desired by Engineer incharge complete in all respects
98Providing, installation, commissioning and testing of single winch machine, complete set of standard quality of 03 ton capacity with double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling , all sorts of carriages and extra carriages upto site of work complete job
99Providing, installation, commissioning and testing of double winch machine, complete set of standard quality of 05 ton capacity with coupling rod, coupling set double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling , all sorts of carriages and extra carriages upto site of work complete job
100Providing, driving and installing poplar wood piles of 6" to 8" girth, and length 10 feet incl. all sorts of carriages, taxes, loading unloading etc complete job as per the directions/satisfaction of engineer in charge.
101Structural steel work in single section fixed without connecting plate including cutting , hoisting fixing in positionand applying a priming coatof approved steel primer all complete
102Structural steel work welded in built up section,trusses and framed work including cutting hosisting , fixing in position and applying a priming coat of approved steel primer all complete
103cutting charges of Mild steel pipes/ plates including cost of consumables etc but excluding the cost of transpotation charges of eqipment site
104Using Grinder
105By Gas cutting
106welding charges of preperedmilde steel sections etc incliuding cost of consumbles etc but exculding carriage ofequipment to site etc
107By electrict welding
108By Gas Welding
109Providing and fixing precoated galvanised steel sheet roofing accessories0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws completeBarge board (Upto 300 mm
110Weed clearance
111From lakes(using boats)
112From canals(including extraction of roots)
113Hire charges of vehicle during day or night alongwith licensed commercail driver for site inspection/emegency suituation/ movement of officials/ including driver and POL on need basis etc
114only upto 30 KM journey
115for every KM after 30 Km
116Checking of leakages b.w.o repairing/ replacing of rubber seal of standard quality in gates, complete job
117Providing and fixing of greese lids for winch machines
118Providing and fixing of pipe sleeves (rain water pipes) incl priming coat and two coats of mettalic
119Repairs to side channels b.w.o removal of bends and kinks incl setting and fixing, complete job
120Overhauling of winch machines including all sorts of carriages, cleaning, greesing/oiling, replacement/worm out nuts/bolts etc and refixing/realignment of lever system after application of lubricants, as per Engineer in charge (complete job
121Repair of winch rods including removal of bends kinks etc refixing and reallignment in required position including replacement of Check nuts rusted nuts and bolts etc as per site requirements. Complete job
122Repairs to shuter by way of removing dents, kinks and setting of iron gate
123Disassembling and reasembling of chainsaw wood cutter and making necessary repairs including all accessories for repair work with all sorts of carriages complete job
124Hire and running charges of tipper includingcost of lubricating oil, diesel at 8 working hours per day including driver
125Hire charges of Pumpset of capacity 4000 litres/hour
126Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
127Providing and Laying PVC Pipes with all the required accessories and carriages Of approved brand and quality complete Job.
128100 mm
129150 mm
130Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of jointscomplete .
131600mm dia R.C.C pipe (24")
132450mm dia R.C.C pipe (18")
133300mm dia R.C.C pipe (12")
134250mm dia R.C.C pipe (9")
135Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (Earth)
136upto 1 km
1372 km
1383 Km
1394 km
1405 km
141Beyond 5 Km upto 10 km /km
142Beyond 10 Km upto 20 km /km
143Beyond 20 km /everyadditional Km
144Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (Stone solling)
145upto 1 km
1462 km
1473 Km
1484 km
1495 km
150Beyond 5 Km upto 10 km /km
151Beyond 10 Km upto 20 km /km
152Beyond 20 km /everyadditional Km
153Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (40 mm Agregrate)
1541 Km
1552 km
1563 Km
1574 km
1585 km
159Beyond 5 Km upto 10 km /km
160Beyond 10 Km upto 20 km /km
161Beyond 20 km /everyadditional Km
162Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( 20 mm Aggregate)
1631 Km
1642 km
1653 Km
1664 km
1675 km
168Beyond 5 Km upto 10 km /km
169Beyond 10 Km upto 20 km /km
170Beyond 20 km /everyadditional Km
171Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 600mm )
1721 Km
1732 km
1743 Km
1754 km
1765 km
177Beyond 5 Km upto 10 km /km
178Beyond 10 Km upto 20 km /km
179Beyond 20 km /everyadditional Km
180Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 450mm )
1811 Km
1822 km
1833 Km
1844 km
1855 km
186Beyond 5 Km upto 10 km /km
187Beyond 10 Km upto 20 km /km
188Beyond 20 km /everyadditional Km
189Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 300mm )
1901 Km
1912 km
1923 Km
1934 km
1945 km
195Beyond 5 Km upto 10 km /km
196Beyond 10 Km upto 20 km /km
197Beyond 20 km /everyadditional Km
198Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCCpipes 250mm )
1991 Km
2002 km
2013 Km
2024 km
2035 km
204Beyond 5 Km upto 10 km /km
205Beyond 10 Km upto 20 km /km
206Beyond 20 km /everyadditional Km
207Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (Earth)
208for first 50 mtrs.
209for every additional 50 mtrs
210Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (stone solling)
211for first 50 mtrs.
212for every additional 50 mtrs
213Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (40 mm stone aggregate)
214For First 50 Mtrs
215for every additional 50 mtrs
216Carraige of materials from dumping siteto actual site of work by manual means including cost of loading, unloading and stacking etc ( RCCpipes1st 50m )
217600mm
218450mm
219300mm
220250mm
221Carraige of materials from dumping siteto actual site of work by manual means including cost of loading, unloading and stacking etc ( RCCpipes Additional50m )
222600mm
223450mm
224300mm
225250mm
226Carraige of materials by manual means fromdumping site to acual site of work including loading, unloading and stacking (20 mm aggregate)
227For First 50 Mtrs
228for every additional 50 mtrs
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail