}

Tender For Installation Of Mechanized Laundry Under Ge (East) Ferozepur Cantt, jalandhar-Punjab

Military Engineer Services-MES has published Tender For Installation Of Mechanized Laundry Under Ge (East) Ferozepur Cantt. Submission Date for this Tender is 09-05-2024. Laundry Work Tenders in jalandhar Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

43107689
Tender For Installation Of Mechanized Laundry Under Ge (East) Ferozepur Cantt
Open Tender
Indian
Punjab
jalandhar
09-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Installation Of Mechanized Laundry Under Ge ( East ) Ferozepur Cantt

Key Value

Document Fees
INR 2000 /-
EMD
INR 315000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
74d628f3-6817-45e9-9b58-ae044d525b97.html Tender Notice 0 KB
BOQ_726791.xls Tender Document 0 KB
DrgSrlNo111to140.pdf Tender Document 0 KB
DrgSrlNo1and5to75.pdf Tender Document 0 KB
DrgSrlNo76to110.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Tender_Mech_Laundary.pdf Tender Document 0 KB

BOQ Items

Name of Work: INSTALLATION OF MECHANIZED LAUNDRY UNDER GE (EAST) FEROZEPUR CANTT (TENDER ID NO. 2023_MES_620582_2)
Sl. No. Item Description
1Note: (i) Please refer Schedule "A" Notes given on serial page No. 21 to 25 of tender documents.
2LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS
3Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule "A" Part-I brought forward from serial page No. 26.
4Lump sum price worked out by the contractor for SITE CLEARANCE AND EARTHWORKS as listed in Schedule "A" Part-II brought forward from serial page No. 27.
5Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule "A" Part-III brought forward from serial page No. 30.
6Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS as listed in Schedule "A" Part-IV brought forward from serial page No. 31.
7Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule "A" Part-V brought forward from serial page No. 32
8Lump sum price worked out by the contractor for ROAD, PATHAND CULVERTS WORKS as listed in Schedule "A" Part-VI brought forward from serial page No. 34
9Lump sum price worked out by the contractor for AREA DRAINAGE WORKS listed in Schedule "A" Part-VII brought forward from serial page No. 35
10Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLYWORKS as listed in Schedule "A" Part-VIII brought forward from serial page No. 37.
11Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATIONWORKS as listed in Schedule "A" Part-IX brought forward from serial page No. 38.
12MISC ITEMS SCHEDULE "A" PART-X INTERNAL ELECTRIFICATION WORKS
13Supply and fixing energy efficient LED Bulb B-22, 9 watt complete all as directed.
14Supply and fixing / Hanging to Roof 2x LED batten suitable for twin LED Tube light with integral LED driver in single side connection at specified height fixed with suitable suspension system etc complete all as direcred by Engr-in-charge. Make : Cat part No. JOININGKITFORDESTELLO50P/S/DI & 3 CORE MAINSCABLE105MTRWH of Havells or eqvt in Philips and CG for Suspension system. Make : Cat partNo.STREAKT8UPTO2X22WSSBSWH of Havells or equivalent Bajaj/Phillips/CG for batten. Note : LED Tube light (Rod) for 2 X 20 W batten will be measured & paid separately.
15Supply and fix LED tube light 20 watt single side connection suitable for installation in batten mentioned in serial item 3.02 here in before complete all as directed by Eingineer-in-Charge. Make : Cat part No. PHOTONULTRA2.01213T8SSTL20WLED865SPC of Havellsor equivalent model of Bajaj/Philips/ Crompton/Surya /Luker
16Supply and fixing for building security light brackets made ofGI tubinglight grade, 32mm dia, 1.5 mtr long, bent to shape suitable for fixing of building security light fixed to wall with 2 Nos clamps of size 32mm x 4 mm thick, including necessary nut bolts and washer etc complete all as directed.
17Supply and fixing VTPN DB 6 way, double door, 415 volt, IP-43, prewired with multistranded PVC copper wire of suitable size and and length, of CRCA sheet steel, dust protection, duly powder coated including factory fitted copper bus bar of suitable size incommer as a MCB TPN and outgoing as a MCB SPN/SP with common neutral link, earth bar, din bar for mounting of MCB"s and blanking plates including fixing to wallcomplete all as directed by Engineer in Charge. Make : Cat No DHDMTVODCW06 of Havells or equivalent model of /C&S electric/HPL/ Indo Asian/Anchoretc Notes : (a) Cutting chasing grouting and necessary patch work and finishes to match with existing surface incuding making connection as directed by Eigineer in Charge. Rates are deemed to be included in quoted rate (b) Connection from MCB to bus bar will be made with aluminum strip and thimble of suitable size as directed. Rates are deemed to be included in quoted rate.
18Earthing Complete with galvanised steel earth plate electrode 60cmx60cmx6mm thick burrieddirectly in groundverticallyto a depth not less than 2.25 metrebelowgroundlevelwith topedgeof theearth plate at a depth not less than 1.5 mtr belowgroundlevelearth platesurrounded from all sides by 15cmthickpacked layer ofcharcoal dust and common saftfillinginalternate layers andelectrodeconnectionby usingGI earth wire 4 mm dia (8 SWG) by meansof bolts, nuts, check nutsand washersmade of galvanised ironand thimbles and other endof theearth wire connectedto mainswitch boardprotected by galvanised iron light grade pipe 15mm borein wall/floor/andGI Pipe 20mm borelight grade forwatering with funnel and wiremesh PCC chamber in cementconcrete 1:3:6 typeC-2 and RCC pitcover includingnecessaryexcavationand earth work in anytype ofsoil, returningslurry approved soil and disposed of surplussoilto adistancenotexceeding 50 Mtraway all as shown inelectrical plateNo 3ofSSR 2009( Part-I). Note:-(a)The unit rate shall include for protection pipe, GI water pipe, wire mesh, funnel and excavation. RCCpit cover ,test point,4mm diagalvanised iron wire from top of earth plate upto 5 m above ground level and if GI protection is less than 5meter, no price adjustment shall be made. (b) PCCpit shall be provided at least 50 cm away from the earth pitand not just on the earth pit and extra cost of additional length of waterpipes and fittings, junction, elbow etc shall be deemed to be included in the unit rate. (c) If the testing result of earthingwork is not been found satisfactory then the contractor shall do other earthing work at his own cost and nothing shall be permissible on this account. (d)Earthing work will be carried out in presence of MES representative.
19EXTERNAL WATER SUPPLY WORKS
20Supplying, laying, jointing and testing in trenches centrifugally cast 100mm bore ductile iron pipe class K-7 conforming to IS : 8329-2000 of min wall thickness 5.4mm including testing complete all as directed. Notes: - (a) Excavation, earth work and DI fittings shall be measured and paid for separately under respective items (b) Cost of rubber tyton joints is included in the rate quoted. (c) Standard length of the pipe should be 5.50m or 6.0m as available. (d) The measurement of the pipe shall be net as fixed between the fittings including short length without any allowance for cutting and wastage and for the portion entering in the socket of all pipes and fittings.
21Material and labour for ductile iron fittings such as bends (any type, radius and angle) Tapers any type, (straight, bend, increasing, decreasing or double socket etc.) Tee pieces single branch "Y" junction, double branch, cross (all sockets or socket and spigot) collars, tail pieces with one end flanged (integrally cast) and one end socket. Spigot caps and plugs suitable for 100 mm bore ductile iron pressure pipes of K-7 classification and push on flexible rubber gasket joints complete all as specified. Note - (i) DI fittings shall be of same make as of DI pipes or of make as recommended by manufacturers. (ii) The weight of the fittings shall be measured and paid as given in relevent IS or actually provided which ever is less. (iii) All fittings shall bear relevent IS stamping marking. (vi) Excavation and earth work shall be measured and paid for separately. (v) Cost of the joints and jointing materials shall be deeemed to be included in the relvant items of DI pipes here-in-before.
22Taking down and relaying, jointing and testing DI Pipe, 100 mm bore, with necessary fittings such as tees, elbows, bends, reducers, unions etc. laid in trenches complete all as directed.
23M&L for cutting of existing DI tubing 100mm bore for making new connection, inserting un equal Tee 100 x 100 x 50mm including excavation, returning filling completeall as directed.
24M&L for construction of brick masonary valve pit chamber of 600mm x 600mm x 600mm size (internal dimensions) with MS sheet cover 3.15mm thick and angle iron 25mm x 25mm x 3mm frame duly painted with two coat of synthetic enamel paint over one coat of red oxide primer including locking arrangement, necessary earth work, internal plaster in CM 1:4 etc complete all as specified and shown on drgs.
25Supply, laying, jointing and testing UPVC pipe 25mm bore Sch 40 as per ASTM : D 1785including necessary fittings such as tees, elbows, bends, reducers, unions etc. along wall/floor etc. complete all as dircted
26Supply and fixing UPVC Gate / Ball valves, size 25mm bore complete all as directed
27EXTERNAL ELECTRIC SUPPLY WORKS
28Supply Install, testing and commissioning of LT Distribution Panel cubicle type IP-65, Outdoor type confirming to IS-5039 of 1983, factory fabricated prewired made out of 3.15 mm thick CRCA MS sheet outer & 2mm thick CRCA MS sheet inner of suitable size to accommodate all accessories / fittings compartmentalized in construction to accommodate the incoming/outgoing MCCB and TPN bus bars and outgoing feeders. The TPN bus bars shall be insulated with colour coated heat shrinkable sleeve and shall be mounted on DMC support. The incoming as well as outgoing MCCBs shall have extensionlinks of current carrying cap not less than 1.5 times the rated capacity of individual feeders. The extension links shall be supported on DMC support having provision for termination of incoming and outgoing cables. All extension links/ interconnections shall be colour coated sleeves. The cubicle shall have frame work at bottom of MS channel MC 100 fixed to the top of plateform. The plateform of LT panel shall be pedestal type of suitable width and 600 mm height above ground level and minimum 400 mm below the ground level constructed with bricks (sub class"B") work duly plastered in CM 1:3 and PCC copping (1:2:4) not less than 50 mm thick over brick pedestal with adequate opening for entry of cable complete as per manufacture recommendation and directed by the Engr-in-charge.. A detachable gland plate of thickness not less than 3 mm thick should be used at the bottom for entry of armoured cable of adequate size compression glands, the panel shall be painting with powder coated finish with RAL 7032 SIEMENS GRAY Structure after seventank phosphate treatment front & back opening type and fixing 2 Nos danger notice plan with letter figures and conventional skull bones in signal red colour and fixed front & back door to LT Panel with voltage and danger indicated in Hindi and English with double door shutter and shall have louvers and air vent gasket for natural flow of air Neoprene adhesive type gasket shall be used to make panel vermin proof and comprising of following:- (i) MCCB 400 Amp 36 KA rating FP 415 volts - 01 No ( I/C) (ii) MCCB 100 Amp 25 KA rating TP415 volts - 02 Nos ( O/G)(1 no for 60 Kg washer Extractor,01 no for flat bed ironer) (iv) MCCB 63 Amp 25 KA rating TP 415 volts - 04 Nos ( O/G)( 02 nos for 30 kg washer extractor & 2 nos for 30 kg drying tumbler) (v) MCB TPN 40 Amp 16 KA rating - 03 Nos ( O/G)( Flat drying press) (vi) MCB SPN 20 Amp 10 KA rating- 04 Nos ( O/G) (vii)RYB LED Indicator lamp- 03 Nos (viii) Digital Volt meter with selector switch 0-500 Volts - 01 No (ix)Ammeter with selector switch with CT ration 100/5 Amps -01 No Notes : (i) LT Panel Board should be of make having valid CPRI type test approved and as per IS-5039 of 1983 (A copy of valid CPRI type test report to be enclosed while obtaining approval from GE) (ii)SLD diagrame for LT panel will be got approved from GE before placing the order and final diagram will be fixed on the front and rear door. (iii)Rate for the same deemed to include in the quoted rates.
29Material and labour for earthing complete with galvanized steel plate elecrode of size60cm x 60cm x 6.3mm thick burried directly in ground vertically to a depth not less than 2.5 mtr below the ground level with top edge of earth plate at a depth not less than 1.5 mtr below normal ground level, connected with and including GI strip 32mm x 6mm with & including GI pipe 50mm bore medium grade as protection pipe (upto the body of equipment max 7.50 meter) by means of GI and thimbles, earth plate surrounded packed layers of coal dust and common salt 15cm thick, all around top and bottom and watering pipe 20mm bore of GI pipe light grade with funnel and wire mesh complete all as shown in Electrical plate No. 3 of SSR Part-I (2009), testing on completion including PCC chamber (1:3:6) using 20mm graded stone aggregate and RCC M-25 cover and angle iron frame complete all as specified. Note :- (i) The cost of GI strip/ wire from top of earth plate upto 5.00 meter above GL with GI protection pipe shall be deemed to be included in unit rate. (ii) PCC pit shall be provided at least 0.50 meters away from the earth pit and not just on the earth pit and extra cost of additional length of water pipes and fittings, junction elbow etc. shall be deemed to be included in the unit rate. (iii) In case the testing result of earthing work not found satisfactory, the contractor shall have to carry out earthwork at new location and nothing extra shall be admissible on this account. (iv) The earthing work shall be carried out in presence of MES representative detained by Engr-in-Charge.
30MECHANIZED LAUNDRY EQUIPMENT WORKS
31Supply installation,testing & and comissioning ofwasher Extractor. Washer Extractor. High Spin. Soft Mount. 60kg Capacity. Electric Heated. Front Loading. Open Pocket. Stainless Steel Cabinet. Computer Controlled. Capacity (1:10):-60kg dry weight of 100% cottons per charge. (Inner Cylinder Volume to be at least 10 Ltrs for 1kg of dry Linen.) Outer Cabinet:- Stainless steel 304 quality front, sides, top & back covers. S.S. Front Door interlocked with drive. Outer Drum:-3 mm Stainless steel of 304 quality duly reinforced to support front door, bearing housing, springs, electric motor & shock absorbers. Inner Cylinder:-3 mm Stainless steel of 304 quality. Dimpled perforations. Coned S.S, Re-Enforced 2 Nos. Back-End-Plate with tapered S.S. bush at the center. Push fit Main Shaft, easy to dismantle. Beater Thickness of 2.5 mm. (Carbon Steel shall not be used anywhere on the cylinder.) Suspension:- Coil springs & hydraulic shock absorbers. Bearing Housing:-Cast Iron one piece bearing housing with extra wide roller-cylindrical front & Spherical rear bearings packed with lubricants & sealed. Self lubricating seals for water tightness & for lubricant tightness of bearings. Make of Bearings: NTN, NSK, KOYO. Shaft:- Removable Shaft with SS Bush. Drive:-Single motor with Variable Frequency Drive for various speeds for wash, distribution, low, normal & high spin extract. Computer controlled with fully programmable microprocessor. Soap Dispenser:- 5 compartment in-built soap dispenser for powder & liquid detergents, each fitted with independent water solenoid valve & pressure jet. Electric Motor minimum capacity 7.5 KW, 415V, 3Phase, AC or as per OEM specifications Water inlet : 38mm dia (1.5" BSP) Solenoid valve operated. Drain:- Minimum dia Ø 65 mm (2.5” BSP) Motorized, non clog Drain Valve or as per OEM specifications Electric Heating Load :Min capacity 24/36 KW or as per OEM specifications Electric Supply: 415V ±5%, 3Phase, 50 Hz, AC Model: AXE60 of stefab or equivalent model of IFB, Girbau, Primus, Fabcare, Supershine
32Supply installation,testing & and comissioning ofwasher Extractor. High Spin Washer Extractor. Soft Mount. 30kg Capacity. Electric Heated. Front Loading. Stainless Steel Cabinet. Computer Controlled.Capacity (1:10):-30kg dry weight of 100% cottons per charge. (Inner Cylinder Volume to be at least 10 Ltrs for 1kg of dry Linen.) Outer Cabinet:- Stainless steel 304 quality front, sides, top & back covers. S.S. Front Door interlocked with drive. Outer Drum:-Stainless steel of 304 quality duly reinforced to support front door, bearing housing, springs, electric motor & shock absorbers. Inner Cylinder:-Stainless steel of 304 quality. Dimpled perforations. Coned S.S. Back-End-Plate with tapered S.S. bush at the center. Push fit Main Shaft, easy to dismantle. (Carbon Steel shall not be used anywhere on the cylinder.) Suspension:- Coil springs & hydraulic shock absorbers. Bearing Housing:-Cast Iron one piece bearing housing with extra wide roller & ball bearings packed with lubricants & sealed. Self lubricating seals for water tightness & for lubricant tightness of bearings. Drive :-Single motor with Variable Frequency Drive for various speeds for wash, distribution, low, normal & high spin extract. Computer controlled with fully programmable microprocessor Soap Dispenser:- 5 compartment in-built soap dispenser for powder & liquid detergents, each fitted with independent water solenoid valve & pressure jet. Electric Motor minimum capacity 3.75 KW, 415V, 3Phase, AC or as per OEM specifications Water Inlet:- Minimum Ø 25 mm (1” BSP) Solenoid valve operated or as per OEM specifications Drain:- Minimum Ø 65 mm (2.5” BSP) Motorized, non clog Drain Valve or as per OEM specifications Electric Heating Load :Minimumcapacity 12-18 KW or as per OEM specifications Electric Supply: 415V ±5%, 3Phase, 50 Hz, AC. Model: AXE30 of stefab or equivalent model of IFB, Girbau, Primus, Fabcare, Supershine
33Notes for Srl item No 6.01 & 6.02 :- The quoted rate shall be deemed to include for the following in addition to works/ items described above:- (i) Construction of foundation of machines/equipment’s as per manufacturer instructions. (ii) Provision of UPVC pipeSch 40 as per ASTM : D 1785 of suitable size, length and necessary gate valves,Y-strainer and other fittings etc as per water inlet size of machine from Water Supply pipe line (common header) 50 mm UPVC pipe running along the bldg (Executed and measured under Sch ‘A’ Part-VIII).Cutting of PCC floor, wall and make good is deemed to be incl in above quoted rate. (iii)Provision of 3 Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble , cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacture instruction. (iv) Provn of UPVC outlet pipe as per IS 13592 in the nearby drain from outlet of machine.
34Supply installation,testing & and comissioning of drying tumbler. 30kg Capacity. Electric Heated. Stainless Steel Cylinder. Microprocessor Control. Reversible with Cool Down Feature. Capacity : 30kg dry weight of 100% cottons per charge. Outer Cabinet : Double walled for heat insulation. Hot painted. Front & back service only. Can be joined together for multiple installation. Inner Cylinder : Stainless steel 304 grade perforated inner cylinder. Back end plate reinforced with M.S. Channel/Trunion. Electric Controls : Micro Processor control for drying & cool-down time. Auto digital temperature control with moisture control & humidity sensor. Drive : Main & idler drive through V belts & pulleys running on self aligning ball bearings encased in Plummer blocks. Suction Blower : Aluminum cast suction blower driven by independent blower motor. Optimized air flow. Electric Radiator : Formed out of Stainless Steel Heating Elements with Galvanized rectangular fins. Lint Screen : Self cleaning lint screen removable from the front. Drive Motor minimum capacity 0.75 KW, 415V, 3-Phase, AC or as per OEM specifications Blower Motor minimum capacity 0.75 KW, 415V, 3-Phase, AC or as per OEM specifications Exhaust :Minimumsize 210 x 210 or as per OEM specifications Electric Heating Load :Minimum capacity18-24 KW or as per OEM specifications Electric Supply: 415V ±5%, 3Phase, 50 Hz, AC. Model:DRE30 of stefab or equivalent model ofIFB, Girbau, Primus, Fabcare, Supershine Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above:- (i) Construction of foundation of machines/eqpts as per manufacturer instructions. (ii)Provision of 3 Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacture instruction. (iii)Provn of exhaust GI Duct of size matching with exhaust air opening of drying tumbler from machine exhaust port to outside the building duly supported with mechanically from wall, floor/ceiling as per manufacturer instructions. At the junction of duct and exhaust port of machine proper flexible canvas connections to be provided.
35Supply installation,testing & and comissioning offlatwork drying ironer. Flat Work Drying Ironer. Chest Heated. Roller & Chest Size : Ø530 x 3000 mm length. Electric Heated. Front Feed, Rear Return. Roller: Made of steel. Precision machined with perforations throughout its length & periphery for moisture suction. Runs on self aligning ball bearings. Padded with galvanized springs & double layer polyester padding. Ironing Chest : Precision machined, ground smooth and polished Chest moves up & down through pneumatic cylinders at both sides. Perfect contact with the roller. Adjustable & uniform ironing pressure across the entire roll. Chest lowers down automatically at the time of power failure or when the machine is stopped. Main Body : Made of steel. Hot painted. Full length conveyor feed belts. Full length, stainless steel linen collection shelf. Drive : Single Motor working in conjunction with variable frequency drive. Roller is driven by an electric motor & a reduction gear box unit which is lubricant packed & sealed. The final transmission is through sprocket & gear. Easy V belt & chain tensioning device. Controls : Push buttons to start & stop the machine. Auto digital temperature control. Rocker switch for forward-reverse chest rotation. Emergency stop push button. All controls at the front. Finger Safety Guard : Auto cut off by Swing Guard for false feeding & finger safety. Moisture Suction Blower : Directly Mounted on to the hollowed suction side shaft of the roller. Padding : Galvanized coil type or leaf type springs covered with Heat Resistant Double Layer Polyester Padding of minimum 900GSM quality. Conveyor Roller & Feed Belts : Steel rubberized conveyor roller runs in self aligning ball bearings & driven by chain & sprocket. Polyester Feed Belts of welded seams joined with Stainless Steel Comb hooks. Easily replaceable with belt tightening device. Drive Motor & Gear Box Min cap 2.2 KW, 415V, 3-Phase or as per OEM specifications Roller Speed : Min 2 to 10 meters per minute (Variable) or as per OEM specifications Suction MotorMin capacity 0.75 KW or as per OEM specifications Electric Heating Load Min capacity 36 KW or as per OEM specifications Exhaust Min sizeØ 65 mm or as per OEM specifications Air Connection min size Ø 15 mm (0.5” BSP) with Filter Lubricator &Pressure Regulator or as per OEM specifications Electric Supply: 415V ±5%, 3Phase, 50 Hz, AC. Model:FE53-300(1 Roll) of stefab or equivalent model ofIFB, Girbau, Primus, Fabcare, Supershine
36Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above:- (i) Construction of foundation of machines/ eqpts as per manufacturer instructions. (ii)Provision of 3 Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacture instruction. (iii)Provn of exhaust GI Duct of size matching with exhaust air opening of flatwork drying ironer from machine exhaust port to outside the building or duly supported with mechanically from wall, floor/ ceiling as per manufacturer instructions. At the junction of duct and exhaust port of machineproper flexible canvas connections to be provided. (iv) Provn of MS pipe ‘C’ Class of suitable size for compressed air duly paintedincluding flexible PVC / Canvas connections necessary fittings and control valve etc from Air compressor to machine/eqpt as per manufacturer instructions.
37Supply installation,testing & and comissioning offlat bed drying press. Head Size : 1500 x 750 mm. Electric Heated. Pneumatically Operated. Bed with Moisture Suction. Auto Timed Release. Head & Bed Size : 1500 mm X 750 mm. Main Body:- Formed out of steel sheets & plates with channel base frame. Hot painted. Head:- Made in boiler quality steel plates. Machined Ironing surface, ground smooth and polished. Pressing surface lined with Teflon. Pneumatic raising & lowering with push buttons at front work table. Spring suspended on rocker arms for self aligning with the bed. Multi steam Chambers. Move on Ball Bearings:- Front head weight is counter balanced by springs. A pneumaticcylinder attached to rocker arms affect raising & lowering of the Head Bed:- Large perforated bed with heat resistant Molleton / Silicon padding Controls:- Automatic digital timed release of the head at preset time. Green Jumbo push buttons for lowering of the head. Red Jumbo Push Button for manual & instant release of the Head. All controls conveniently located at the front work table. Suction Blower:- Heavy duty centrifugal blower driven by independent blower motor. Blower Motor Min capacity 0.75 KW (1HP) 415V, 3-Phase, AC or as per OEM specifications Exhaust Min size Ø 100 mm or as per OEM specifications Electric Heating Load Min cap 12 / 18 KW or as per OEM specifications Air Connection Min size Ø 15 mm (0.5” BSP) with Filter Lubricator & Pressure Regulator or as per OEM specifications Electric Supply: 415V ±5%, 3Phase, 50 Hz, AC. Model:FPE150 of stefab or equivalent model of IFB,Girbau, Primus, Fabcare, Supershine Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above:- (i) Construction of foundation of machines/eqpts as per manufacturer instructions. (ii)Provision of 3 Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacture instruction. (iii) Provn of MS pipe ‘C’ Class of suitable size for compressed air duly paintedincluding flexible PVC / Canvas connections necessary fittings and control valve etc from Air compressor to machine/eqpt as per manufacturer instructions.
38Supply installation,testing & and comissioning of vacuum finishing table. Rectangular Table Top. Size : 1200 x 750 mm. Centrifugal Suction. Extended Exhaust Duct with Rack & Concealed Lighting Device Main Body : Metallic. Hot painted. All components to be easily accessible. Table Top : Densely perforated aluminum plate padded with high porosity & heat resistant silicon padding & polyester cover. Table Heater : 1KW thermostatically controlled stainless steel tubular heater fitted below the aluminum table top to keep the padding dry at all times. Suction Blower : Heavy duty centrifugal blower driven by independent with min capacity 0.37KW blower motor activated by spring loaded full length foot pedal. Exhaust : Extended exhaust duct with full length rack & concealed lighting device. Electric Supply:230V ±5 %,single Phase,50 Hz, AC. Model:VF120 of stefab or equivalent model ofIFB,Girbau, Primus, Fabcare, Supershine Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above:- (i) Provision of single Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacturer instruction.
39Supply installation,testing & and comissioning ofsteam generator. 8kg per hour Capacity. Electric. Portable. Fully Automatic with Pump. Stainless Steel Pressure Vessel. Automatic Steam Release Safety Plug. Audio Video Signal for Low Water Level.Steam Solenoid Valve with Flow Control Knob.Built in Water Storage Tank. Steam Pressure- Min 8 Kg /cm²or as per OEM specifications Pressure Vessel MinCapacity 12 ltrs or as per OEM specifications Water feed pump min capacity 700 W or as per or as per OEM specifications Water Level Controller:- Float Type with Stainless Steel Float Ball. Pressure Control Switch:- Diaphragm type with pressure differential of 0.5 Kg. Electric Heating Load: 6 KW with option to use 2, 4 or 6 KW. Water Storage Tank Min Capacity 25 ltrsor as per OEM specifications Electric Supply: 415V ±5%, 3Phase, 50 Hz, AC. Model:AXE30 of stefab or equivalent model of IFB,Girbau, Primus, Fabcare, Supershine Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above :- (i) Construction of foundation of machines/equipment’s as per manufacturer instructions. (ii) Provision of UPVC pipeSch 40 as per ASTM : D 1785 of suitable size, length and necessary gate valves, Y-strainer and other fittings etc as per water inlet size of taped from 50mmWater Supply pipe line running along the bldg. (Executed and measured under Sch ‘A’ Part-VIII).Cutting of PCC floor, wall and make good is deemed to be incl in above quoted rate. (iii)Provision of 3 Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacture instruction. (iv)Provn of MS ‘C’ Class steam pipe of suitable size duly painted including necessary fittings and control valve etc from steam generator to machine/eqpt as per manufacturer instructions
40Supply installation, testing & commissioning of Stain removing machine. Stainless Steel Work Station with Swivelling Arm. Complete with Cold Spotting Guns, Steam Air Gun, Ecological Chemical Suction & Concealed Lighting Device. Main Body:- Metallic. Hot painted. Main Work Station : Stainless steel large work station with fine mesh S.S nose basin. Stainless steel narrow swivelling Sleeve Arm. Suction Blower:- Heavy duty centrifugal blower directly mounted on an electric motor activated by spring loaded full length foot pedal. Spotting Guns:- Stainless steel forged heavy duty Chemical-Air Guns - 02 Nos. Steam Air Gun:- FRP. Thermally Insulated. Built in micro switches each for steam & compressed air respectively Condensate Separator:- Fitted with steam solenoid valve & steam regulator. Inner shell in stainless steel duly insulated. Metallic broaded insulated teflon house for steam inlet & steam return with valve. Main Work Station Size min size 1200mm X 340mm X 140mm or as per OEM specifications Sleeve Arm Size min size 390mm X 105mm X 65mm or as per OEM specifications Blower Motor min capacity 0.75KW (1HP) 415V, 3-Phase, AC or as per OEM specifications Steam Inlet / Consumption min size Ø 6 mm (0.25” BSP) / 4kg per hour or as per OEM specifications Air Connection / Consumption min size Ø 15 mm (0.5” BSP) with Filter Lubricator & Pressure Regulator 150 ltrs per minute app or as per OEM specifications Electric Supply: 415 V ±5%, 3Phase, 50 Hz, AC. Model: SP120 of stefab or equivalent model ofIFB,Girbau, Primus, Fabcare, Supershine Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above:- (i)Provision of 3 Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacture instruction. (ii) Provn of MS pipe ‘C’ Class of suitable size for compressed air duly paintedincluding flexible PVC / Canvas connections necessary fittings and control valve etc from Air compressor to machine/eqpt as per manufacturer instructions.
41Supply installation,testing & and comissioning of washroom trolley. Formed out of Stainless Steel Tubes & Bars. Electro treated. Fitted with 4 Nos. swivelling type ball bearing wheels. Volumetric Linen Holding Capacity: More than 300 ltrs. Overall Size (Approx.): 850 mm x 650 mm x 800 mm ht. 50kg Capacity.Stainless Steel Model: WTR50 of stefab or equivalent model ofIFB,Girbau, Primus, Fabcare, Supershine
42Supply installation,testing & and comissioning ofdry linen trolley. Formed out of Stainless Steel Tubes & Bars. Electro treated. Fitted with 4 Nos. swivelling type ball bearing wheels. Volumetric Linen Holding Capacity: More than 700 ltrs. Overall Size (Approx.): 850 mm x 650 mm x 1680 mm ht. 50 Kg capacity. Model:DTR50 of stefab or equivalent model ofIFB,Girbau, Primus, Fabcare, Supershine
43Supply installation,testing & and comissioning ofmobile table. Stainless steel polished top. Formed out Stainless Steel Tubes and Bars. Electro treated. Fitted with 4 nos swivelling type ball bearing wheels. Overall Size (Approx.): 1130 mm x 720 mm x 800 mm ht. Model: TS113 of stefab or equivalent model ofIFB,Girbau, Primus, Fabcare, Supershine
44Supply installation,testing & and comissioning of 3 Ph415V ,50 HzAC , Air compressor. 5 HP. Reciprocating Type. Double Stage, Fully Automatic. Belt Driven. Continuous Duty. Tank Capacity: 220 Ltrs. (Approx.) Free Air Delivery: 443 Ltrs/minute. (Approx.) Working Pressure: 8kg/cm². (Approx.) Complete with motor, starter, pressure switch, pressure gauge, V belt & Belt guard. Make: Elgi, Atlas copco, Ingersoll Rand Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above:- (i) Construction of foundationof machines/equipment’s as per manufacturer instructions. (ii)Provision of 3 Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from DB to machine as per manufacturer instructions. (iii)Provn of MS ‘C’ Class pipe for compressed air of suitable size duly painted including necessary fittings and control valve etc from Air compressor to machine/eqpt as per manufacturer instructions
45Supply installation, testing & and comissioning of water softening plant having capacity 1500 litre per houralongwith feed pump of suitable capacity to achive less than 10 PPM of hardrness including necessary excavation, PCC foundationwork complete with comprisingof following parts: - Make - M/s Optimus Enviropro Pvt Ltd, M/s Bharti Water Pvt Ltd, M/s Thermax Ltd (a) Feed Pump - 02 Nos (i) Min flow rate - 1.5 cum/hr (ii) Head - 25 mtr (iii) MOC- CI (iv) Mode of Operation = Mannual (b) Softner 01 No (i) Feed flow rate - 1.5 cum/Hr (ii) Type of flow - Down flow (iii) Diameter of Softner - 200 mm (iv) Height of Softner - 1800 mm (v) MOC - MS epoxy (vi) Operating pressure - 3 kg/cm² (vii) Test pressure - 5.25kg/cm² (viii) Resin qty - 44 Ltr (ix) Regeneration period - 8 Hrs (x) OBR - 12 Cum (xi) Brine Solution tank - 50 Ltr (xii) Salt consumption 6 kg / Reg (xiii) Mode of Operation - Mannual (xiv) Operating valve - Multiport (c) Pressure Gauge (i) Type - Line mounted, Glycerin filled (ii) Pressure sensing - By Diaphragm (iii) Diameter of dial - 100 mm (iv) Quantity - One at inlet and one at outlet (v) Mounting - 1/2 NPT (d)Piping & Valve (i) Piping - UPVC (ii) Valve - CI / UPVC
46Notes :- The quoted rate shall be deemed to include for the following in addition to works/ items described above :- (i) Construction of foundation of machines/equipment’s as per manufacturer instructions. (ii) Provision of single Core FRLS insulated industrial flexible PVC copper cable conforming to IS 694:2010 of suitable size, length, including necessary thimble, cable gland, nut, bolt and washer including cable tray etc from socket to machine as per manufacturer instruction. (iii) The rate quoted against item 6.13 includes UPVC Sch 40, intake header, suction and delivery pipe, suction and delivery valves, NRVs as per manufacturer instruction.However all other GI pipes / UPVC Sch 40 pipe of sizes& 2 x 2000 ltr pvc tank, gate valves to be executed at ground level before / after softening plantwill be measured and paid separately under Sch ‘A’ part – VIII (Ext Water Supply works).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail