Sl. No. | Item Description |
1 | Work No-1 Part-A(Materials Provided by contractor) |
2 | Main bus bar complete with structure |
3 | Terminal Gantry |
4 | 33 KV. Polymer Disc Insulator B&S |
5 | 33 KV Disc Fitting for Dog. |
6 | P.G. clamp for Dog conductor. |
7 | 33 KV. Top channel for cable stand & neutral earthing |
8 | 11 KV C/J Kit 3X185 mm² XLPE Indoor |
9 | 11 KV C/J Kit 3X185 mm² XLPE Outdoor |
10 | 11 KV C/J Kit 3X300 mm² XLPE Indoor |
11 | 11 KV C/J Kit 3X300 mm² XLPE Outdoor |
12 | 33 KV C/J Kit 3X300 mm² XLPE Outdoor |
13 | Battery charger with 24 Volt battery with cabinet (As per Instruction of Supervision Authority) |
14 | Armoured copper control cable 2 x 2.5 mm2 |
15 | Armoured copper control cable 4 x 2.5 mm2 |
16 | PART - B- WORK Shifting & loading of following materials on private truck at store centre Padrauna & carriage up to 33/11 KV Sub-Station Mathauli Distt-Kushinagar & Un-loading of the same with proper stacking (Distance about 0 to 60 km) |
17 | 33/11 KV ‘XLPE’ power cable. |
18 | 11 KV Switchgear panels(I/C) |
19 | 33 KV ‘VCB’ complete with all structure. |
20 | 33 KV. C.T. with all structure. |
21 | 33 KV Bus Type Isolator with all structure. |
22 | 33 KV Line Isolator with all structure. |
23 | 33 KV control Pannelwith all structure. |
24 | 33 KV lightening arrester with all structure. |
25 | 33 KV fuse set with structure |
26 | 33 KV Post insulatorwith all structure. |
27 | 11 KV Switchgear panels(O/G) |
28 | ACSR Dog conductor |
29 | 33 KV PT with Structure |
30 | ST Pole 11 M Long |
31 | 90lb, Rail pieces for T/F for transformer ( 44.64 Kg /Mtr) |
32 | MS angle 2.6 M |
33 | 11 KV DP Material |
34 | S.T. Pole 9 M long. |
35 | M.S Angle cross bracing |
36 | Top Channel 100x50x2240mm |
37 | Clamps with nut bolt |
38 | extra support angle for cable support |
39 | clamp for extra angle |
40 | Number Plate with clamps. |
41 | Danger Board with Clamps. |
42 | Barbed wire. |
43 | Allumunium Paint. |
44 | Bolts, Nuts, & Washers. |
45 | Red Oxide Paint. |
46 | Stay complete (with Stay clamp and stay wire) |
47 | Earthing complete |
48 | Construction of power transformer plinth for 5 MVA transformer of size 3.5 x 3.5 x 1.5 mtr. including cost of all material as per drawing. |
49 | Earthing of 5 MVA power transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required. |
50 | Jointing charges of 11 KV “XLPE” C/J kit 3x300/185mm2 indoor/Outdoor type |
51 | Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 20’ long and other earthing materials. |
52 | Grouting of M.S. Channel 3.2 mtr. long for neutral earthing support of 5 MVA transformer with help of G.I. strip 50 x 6 mm and copper flexible bond etc. |
53 | Grouting of M.S. channel 3.2 mtr long for cable stand and welding of M.S. flat (3 Nos.) at equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of jumpers. |
54 | Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. |
55 | Laying of 11 KV “XLPE” power cable 3 x 300 mm2 / 185 mm2 including digging of pits of xize 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable. |
56 | Laying of 33 KV “XLPE” power cable 3 x 300 mm2 including digging of pits of xize1.0 x1.0 mtr. covering of cable with sand and 1st class brick around the cable. |
57 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
58 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
59 | Testing of 11 KV switchgear panel in all respect. |
60 | laying control cable from switchyard to control room 33 KV panel by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete and including cost of laying. |
61 | 2 x 2.5 mm2 |
62 | 4 x 2.5 mm2 |
63 | Erection and grouting of “VCB” Structure mounting and fitting of “VCB” on erected structure with complete earthing. |
64 | Erection and groutingof following structure. |
65 | 33 KV Bus Isolator structure |
66 | 33 KV Line Isolator structure |
67 | 33 KV fuse set structure |
68 | 33 KV Post insulator structure |
69 | 33 KV L.A. structure |
70 | 33 KV PT Structure |
71 | 33 KV CT Struture |
72 | Installationof following Equipments on erected structure |
73 | 33 KV Bus Isolator |
74 | 33 KV Lines Isolator |
75 | 33 KV fuse set ( Providing Copper strip as required size for 33 KV fuse set) |
76 | 33 KV Post insulator |
77 | 33 KV L.A. |
78 | 33 KV PT |
79 | 33 KV CT |
80 | Rubber Mat(Provided by Contractor) |
81 | Painting of S/S Structure & equipments |
82 | Earthing of S/sOutdoor equipments (earthmat) |
83 | Earthing of Indoor equipments |
84 | Earhing of outdoor and indoor type switchyard earthing for newly erected structure as per proper specification with GI Earthing strip. |
85 | Painting of newly erected structure in switchyard (Applying on coat of good quality red oxide primer then two coat of good quality of high class luxol aluminium paint) |
86 | Charges For Cartage & Erection terminal Gantry,Making Bus-Bar & All Related complete work |
87 | Construction of approach road inside the switchyard 1.5 Mtr. wide with 1st class bricks on edge soling and tipping complete work including cost of all materials. |
88 | Erection of Double pole structure on 11 mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 2028 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) . |
89 | Work No-2 Part-A(Materials Provided by contractor) |
90 | 3x300 mm² XLPE Cable C/J Kit indoor |
91 | 3x300 mm² XLPE Cable C/J Kit outdoor |
92 | 3x185 mm² XLPE Cable C/J Kit indoor |
93 | 3x185 mm² XLPE Cable C/J Kit outdoor |
94 | Battery charger with 24 Volt battery with cabinet (As per Instruction of Supervision Authority) |
95 | Armoured copper control cable 2 x 2.5 mm2 |
96 | Armoured copper control cable 4 x 2.5 mm2 |
97 | 33 KV. Top channel for cable stand & neutral earthing |
98 | 33 KV PG clamp for Dog for jumpering of Busbar connection |
99 | 11 KV DP Material |
100 | S.T. Pole 11 M long. |
101 | M.S Angle cross bracing |
102 | Top Channel 100x50x2240mm |
103 | Clamps with nut bolt |
104 | extra support angle for cable support |
105 | clamp for extra angle |
106 | Number Plate with clamps. |
107 | Danger Board with Clamps. |
108 | Barbed wire. |
109 | Allumunium Paint. |
110 | Bolts, Nuts, & Washers. |
111 | Red Oxide Paint. |
112 | Stay complete (with Stay clamp and stay wire) |
113 | Earthing complete |
114 | PART - B- WORK Shifting & loading of following materials on private truck at store centre Padrauna & carriage up to 33/11 KV Sub-StationPadrauna Distt-Gorakhpur & Un-loading of the same with proper stacking (Distance about 0 to 100 Mtr.) |
115 | ST Pole 11Mtr. |
116 | 11 KV ‘XLPE’ Power cable. |
117 | ACSR Dog conductor |
118 | 33 KV Control panel for Single Transformer |
119 | 33 KV VCB, 750MVAwith Structure |
120 | 33KV C.T.400/200/1A |
121 | 33 kV PT |
122 | 33 KV Line Isolator |
123 | 33 KV Lightening Arrester |
124 | 33 KV Post Insulator |
125 | 33 KV fuse set with structure |
126 | 11 KV Switchgear Incoming 600/300/5A, 350 MVA |
127 | 11 KV Switchgear Outgoing 200/100/5A |
128 | 33 KVBus Isolator |
129 | 11 KV Bus coupler |
130 | Repairing of plinth and foundation for 10 MVA transformer as per requirement. Dismantling of T/F all fitting& connection, Rail pieces and T/F shifting to another place by crane. |
131 | Installation and mounting of VCB with complete connection of 33 KV VCB |
132 | Dismantling of Bus bar Jumpers,different earthings of existing 5 MVA T/F.etc. complete work and restringing of all connection. |
133 | Transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required.(delta type) |
134 | Laying of 11 KV “XLPE” cable 3 x 300/185 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class bricks around and top of the cable. |
135 | Neutral earthing of 10 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials.(delta type) |
136 | Grouting of M.S. Channel 3.2 mtr. long for neutral earthing support of 10 MVA transformer with help of G.I. strip 50 x 6 mm and copper flexible bond etc. |
137 | Grouting of M.S. channel 3.2 mtr longfor cable stand and welding of M.S. flatat equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of jumpers. |
138 | Jointing charges of 11 KV “XLPE” C/J kit 3x300/185 mm2 indoor/outdoor. |
139 | Dismantling of existing pale fencing and resetting after completion of trnasformer work. |
140 | Mounting, Installation and complete connection and earthing of 33 KV C.T. |
141 | Installation of 33 KV PT, wiring and earthing with complete work. |
142 | Installation of 33 KV control panel, wiring with complete earthing and respectively conection with battery and battery charger in control room. |
143 | Installation of 33 KV fuse setwiring and earthing with complete work. |
144 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
145 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
146 | Testing and commisssioning of 33/11 KV switchgear panel in all respect. |
147 | Installation of 33 KV Post insulatorwiring and earthing with complete work. |
148 | Mounting, Installation and complete connection and earthing of 33 KV C.T. |
149 | 2 x 2.5 mm2 |
150 | 4 x 2.5 mm2 |
151 | Indoor equipment earthing |
152 | Erection of Double pole structure on 11 mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 2028 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) . |
153 | Painting of erected structure in switchyard. |
154 | Work No-3 Part-A(Materials Provided by contractor) |
155 | 3x300 mm² XLPE Cable C/J Kit indoor |
156 | 3x300 mm² XLPE Cable C/J Kit outdoor |
157 | 3x185 mm² XLPE Cable C/J Kit indoor |
158 | 3x185 mm² XLPE Cable C/J Kit outdoor |
159 | Battery charger with 24 Volt battery with cabinet (As per Instruction of Supervision Authority) |
160 | Armoured copper control cable 2 x 2.5 mm2 |
161 | Armoured copper control cable 4 x 2.5 mm2 |
162 | 33 KV. Top channel for cable stand & neutral earthing |
163 | 33 KV PG clamp for Dog for jumpering of Busbar connection |
164 | PART - B- WORK Shifting & loading of following materials on private truck at store centre Padrauna & carriage up to 33/11 KV Sub-Station Gopalgarh Distt-Kushinagar & Un-loading of the same with proper stacking (Distance about 0 to 50 km) |
165 | 11 KV ‘XLPE’ Power cable. |
166 | ACSR Dog conductor |
167 | 33 KV Control panel for Double Transformer |
168 | 33KV C.T.400/200/1A |
169 | 33 KV VCB, 750MVA with Structure |
170 | 33 kV PT |
171 | 11 KV Bus coupler |
172 | 33 KV Bus Isolator |
173 | 33 KV Lightening Arrester |
174 | 33 KV Post Insulator |
175 | 33 KV fuse set with structure |
176 | 11 KV Switchgear Incoming 600/300/5A, 350 MVA |
177 | 11 KV Switchgear Outgoing 200/100/5A |
178 | Repairing of plinth and foundation for 10 MVA transformer as per requirement. Dismantling of T/F all fitting& connection, Rail pieces and T/F shifting to another place by crane. |
179 | Installation and mounting of VCB with complete connection of 33 KV VCB |
180 | Dismantling of Bus bar Jumpers,different earthings of existing 5 MVA T/F.etc. complete work and restringing of all connection. |
181 | Transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required.(delta type) |
182 | Laying of 11 KV “XLPE” cable 3 x 300 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class bricks around and top of the cable. |
183 | Mounting, Installation and complete connection and earthing of 33 KV C.T. |
184 | Neutral earthing of 10 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials.(delta type) |
185 | Grouting of M.S. Channel 3.2 mtr. long for neutral earthing support of 10 MVA transformer with help of G.I. strip 50 x 6 mm and copper flexible bond etc. |
186 | Grouting of M.S. channel 3.2 mtr longfor cable stand and welding of M.S. flatat equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of jumpers. |
187 | Jointing charges of 11 KV “XLPE” C/J kit 3x300/185 mm2 indoor/outdoor. |
188 | Dismantling of existing pale fencing and resetting after completion of trnasformer work. |
189 | Installation of 33 KV PT, wiring and earthing with complete work. |
190 | Installation of 33 KV control panel, wiring with complete earthing and respectively conection with battery and battery charger in control room. |
191 | Installation of 33 KV fuse setwiring and earthing with complete work. |
192 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
193 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
194 | Testing and commisssioning of 33/11 KV switchgear panel in all respect. |
195 | Installation of 33 KV Post insulatorwiring and earthing with complete work. |
196 | Laying from switchyard to control room for 33 KV panel, CT and 10 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete . |
197 | 2 x 2.5 mm2 |
198 | 4 x 2.5 mm2 |
199 | Indoor equipment earthing |
200 | Painting oferected structure in switchyard. |
201 | Work No-4 Part-A(Materials Provided by contractor) |
202 | 3x300 mm² XLPE Cable C/J Kit indoor |
203 | 3x300 mm² XLPE Cable C/J Kit outdoor |
204 | 3x185 mm² XLPE Cable C/J Kit indoor |
205 | 3x185 mm² XLPE Cable C/J Kit outdoor |
206 | Battery charger with 24 Volt battery with cabinet (As per Instruction of Supervision Authority) |
207 | 33 KV. Top channel for cable stand & neutral earthing |
208 | 33 KV PG clamp for Dog for jumpering of Busbar connection |
209 | Armoured copper control cable 2 x 2.5 mm2 |
210 | Armoured copper control cable 4 x 2.5 mm2 |
211 | 11 KV DP Material |
212 | S.T. Pole 11 M long. |
213 | M.S Angle cross bracing |
214 | Top Channel 100x50x2240mm |
215 | Clamps with nut bolt |
216 | extra support angle for cable support |
217 | clamp for extra angle |
218 | Number Plate with clamps. |
219 | Danger Board with Clamps. |
220 | Barbed wire. |
221 | Allumunium Paint. |
222 | Bolts, Nuts, & Washers. |
223 | Red Oxide Paint. |
224 | Stay complete (with Stay clamp and stay wire) |
225 | Earthing complete |
226 | PART - B- WORK Shifting & loading of following materials on private truck at store centre Padrauna & carriage up to 33/11 KV Sub-Station Khadda Distt-Kushinagar & Un-loading of the same with proper stacking (Distance about 0 to 50 km) |
227 | 11 KV ‘XLPE’ Power cable. |
228 | ACSR Dog conductor |
229 | 33 KV Control panel for Single Transformer |
230 | 33 KV VCB, 750MVA |
231 | 33 kV PT |
232 | 33 KV Line Isolator |
233 | 33 KV Lightening Arrester |
234 | ST pole 11 M |
235 | 33 KV Post Insulator |
236 | 33 KV fuse set with structure |
237 | 11 KV Switchgear Incoming 600/300/5A, 350 MVA |
238 | 11 KV Switchgear Outgoing 200/100/5A |
239 | 33 KVBus Isolator |
240 | 11 KV Bus coupler |
241 | Repairing of plinth and foundation for 10 MVA transformer as per requirement. Dismantling of T/F all fitting& connection, Rail pieces and T/F shifting to another place by crane. |
242 | Installation and mounting of VCB with complete connection of 33 KV VCB |
243 | Dismantling of Bus bar Jumpers,different earthings of existing 5 MVA T/F.etc. complete work and restringing of all connection. |
244 | Transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required.(delta type) |
245 | Laying of 11 KV “XLPE” cable 3 x 300/185 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class bricks around and top of the cable. |
246 | Neutral earthing of 10 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials.(delta type) |
247 | Grouting of M.S. Channel 3.2 mtr. long for neutral earthing support of 10 MVA transformer with help of G.I. strip 50 x 6 mm and copper flexible bond etc. |
248 | Grouting of M.S. channel 3.2 mtr longfor cable stand and welding of M.S. flatat equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of jumpers. |
249 | Jointing charges of 11 KV “XLPE” C/J kit 3x300/185 mm2 indoor/outdoor. |
250 | Dismantling of existing pale fencing and resetting after completion of trnasformer work. |
251 | Installation of 33 KV PT, wiring and earthing with complete work. |
252 | Installation of 33 KV control panel, wiring with complete earthing and respectively conection with battery and battery charger in control room. |
253 | Installation of 33 KV fuse setwiring and earthing with complete work. |
254 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
255 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
256 | Testing and commisssioning of 33/11 KV switchgear panel in all respect. |
257 | Installation of 33 KV Post insulatorwiring and earthing with complete work. |
258 | Erection of Double pole structure on 11 mtr ST Pole for Composite line (11 KVone side overhead and one side cable rising) including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for(M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 2028 mm with clamps, danger board with clamp,Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) . |
259 | Laying from switchyard to control room for 33 KV panel, CT and 10 MVA T/F by digging trench in switchyard including cost of sand and 1st class bricks with covering and making connection complete . |
260 | 2 x 2.5 mm2 |
261 | 4 x 2.5 mm2 |
262 | Erection of Double pole structure on 11 mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 2028 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) . |
263 | Painting oferected structure in switchyard. |