Bharat Sanchar Nigam Limited-BSNL has published Tender For Periodical Servicing, Repairing And Painting Of 400 To 63 Kva Transformer At Important Te/Bts Under Sambalpur Ba. Submission Date for this Tender is 12-04-2024. Transformer Supply Tenders in sambalpur Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Physical inspection offollowing ratingtrnasformer with accessories and taking corrective measures for replacement of old burnt out oil by new oil i/c replacement of all gaskit of transformer etc. as required. (a) 2x400 KVA at Telephone Bhawan Sambalpur |
2 | (b) 1x100 KVA atT E Titlagarh |
3 | (c) 1x160 KVA at T E Bhawanipatana |
4 | (d) 1x160 KVA atT E Bolangir |
5 | (e) 1x63 KVA at TE Kantabhanji |
6 | Dismantling of accessories like conservator tank, explosion vent, LT bushing cover, 4nos LT studs, 3nos HT bushings, transformer top cover and disconnection PVC insulated Al armd conductor etc for carry out the necessary repairing & filling of new transformer oilfor the following rating transformer etc complete as required (a) 2x400 KVA at Telephone Bhawan Sambalpur |
7 | (b) 1x100 KVA atT E Titlagarh |
8 | (c) 1x160 KVA at T E Bhawanipatana |
9 | (d) 1x160 KVA atT E Bolangir |
10 | (e) 1x63 KVA at TE Kantabhanji |
11 | Draining out of old burnt out transformer oil from thefollowing rating transfomer by connecting pvc flexible pipe in the draing plug and collecting the old transformer oil into the drum etc. as required. (a) 2x500 KVA at Telephone Bhawan Sambalpur |
12 | (b) 1x100 KVA atT E Titlagarh |
13 | (c) 1x160 KVA at T E Bhawanipatana |
14 | (d) 1x160 KVA atT E Bolangir |
15 | (e) 1x63 KVA at TE Kantabhanji |
16 | Filtration and de-hydration of existing Transformer oil at site, arranging of mobile filtration machine with necessary tools, tackles, testing instruments, qualified and trained supervisor and technicians, testing of BDV at site etc. as required. |
17 | Top up of superior grade transformer oil confirming to IS-335 -1993 with latest amendments, in the conservator tank up to the minimum level after filtration of the transformer oil as req. |
18 | Supplying and fixing of silica gel breather with dry silica gel for following rating transformerConservator tank including removing the old breather etc. as required. (a) 2x400 KVA at Telephone Bhawan Sambalpur |
19 | (b) 1x100 KVA atT E Titlagarh |
20 | (c) 1x160 KVA at T E Bhawanipatana |
21 | (d) 1x160 KVA atT E Bolangir |
22 | (e) 1x63 KVA at TE Kantabhanji |
23 | Replacement of damaged gaskit offollowing ratingtransformer by new gaskit ( top cover gaskit, LT/HT bushing gaskit, conservator tank gaskit , explosion vent gaskit etc ) i/c cleaning/rubbing the old/damaged gaskit from top cover gaskit, LT/HT bushing gaskit, conservator tank gaskit and fixing the new gaskit by putting the fixing gel etccomplete as required (a) 2x400 KVA at Telephone Bhawan Sambalpur |
24 | (b) 1x100 KVA atT E Titlagarh |
25 | (c) 1x160 KVA at T E Bhawanipatana |
26 | (d) 1x160 KVA atT E Bolangir |
27 | (e) 1x63 KVA at TE Kantabhanji |
28 | Making arrangement of Spray Painting offollowing rating transformer withtwo coats of enamel paint i/c to & fro transportation of spray painting machineetc. as required. (a) 2x400 KVA at Telephone Bhawan Sambalpur |
29 | (b) 1x100 KVA atT E Titlagarh |
30 | (c) 1x160 KVA at T E Bhawanipatana |
31 | (d) 1x160 KVA atT E Bolangir |
32 | (e) 1x63 KVA at TE Kantabhanji |
33 | Supplying and fixing of new 11KV HT bushings with porcelin insulator & brass alloy studs for 160 KVA Transformer Conservator tanketc. as required.(a) 2x400 KVA at Telephone Bhawan Sambalpur |
34 | (b) 1x100 KVA atT E Titlagarh |
35 | (c) 1x160 KVA at T E Bhawanipatana |
36 | (d) 1x160 KVA atT E Bolangir |
37 | (e) 1x63 KVA at TE Kantabhanji |
38 | Supplying and fixing of new LT bushings with porcelin insulator &brass alloy studs andforfollowing ratingTransformer Conservator tanketc. as required. (a) 2x400 KVA at Telephone Bhawan Sambalpur |
39 | (b) 1x100 KVA atT E Titlagarh |
40 | (c) 1x160 KVA at T E Bhawanipatana |
41 | (d) 1x160 KVA atT E Bolangir |
42 | (e) 1x63 KVA at TE Kantabhanji |
43 | Re-fixing of the existingaccessories like conservator tank, explosion vent, LT bushing cover, 4nos LT studs, 3nos HT bushings, transformer top cover after cleaning the rust/old gaskit and re-connection ofPVC insulated Al armd conductor in the LT bushing studs after repairing & filling of new transformer oil etcfor the following ratingtransformer complete as required(a) 2x400 KVA at Telephone Bhawan Sambalpur |
44 | (b) 1x100 KVA atT E Titlagarh |
45 | (c) 1x160 KVA at T E Bhawanipatana |
46 | (d) 1x160 KVA atT E Bolangir |
47 | (e) 1x63 KVA at TE Kantabhanji |
48 | Making arrangement for collection of oil sample in a suitable container before testing and after testing, sending the same to Govt. approved laboratory including deposit of required testing fees, obtaining and submission of test reports etc. complete as required. |
49 | Liasoning with supply authority fortaking shut down of 11KV line to carry out the repairing and maintenance works of the above ratingTransformer substationand re-energisation, checking the parameters, load testing etc. complete as required. |