| 1 | Earthwork in excavation of foundation in all kinds of soil within 50 mtrs initial lead and 1.5 mtrs initial lift including levelling and dressing the bed etc. complete |
| 2 | Filling F&P with sand well watered and rammed including cost, conveyance of all material and labour etc complete as per the direction of EIC. |
| 3 | P. C. C ( 1: 3:6)) tousing 40mm size hard granite metal including cost, conveyance of all material and labour etc complete as per the direction of EIC. |
| 4 | P. C. C ( 1: 3:6)) tousing 40mm size hard granite metal including cost, conveyance of all material and labour etc complete as per the direction of EIC. |
| 5 | R.C.C M-20 for Column Base |
| 6 | R.C.C M-20 for column upto plinth |
| 7 | R.C.C M-20 for Gradebeam |
| 8 | R.C.C M-20 for Column from Pl to Rl |
| 9 | R.C.C M-20 for Lintel bend |
| 10 | R.C.C M-20 for Chajja |
| 11 | R.C.C M-20 for Roof Beam |
| 12 | R.C.C M-20 for Slab |
| 13 | Rigid and smooth centering and shuttering for R.C.C. Grade beam |
| 14 | Rigid and smooth centering and shuttering for R.C.C. column |
| 15 | Rigid and smooth centering and shuttering for R.C.C. lintelband |
| 16 | Rigid and smooth centering and shuttering for R.C.C. Chhaja |
| 17 | Rigid and smooth centering and shuttering for R.C.C. Roofbeam,middle beam |
| 18 | Rigid and smooth centering and shuttering for R.C.C. Roof slab |
| 19 | Brick work with Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm sizehavingcrushingstrengthnotlessthan 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum. |
| 20 | Brick work with Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm sizehavingcrushingstrengthnotlessthan 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum. |
| 21 | Cutting , bending ,binding, of MS rod and laying in position, including cost, of binding wires , conveyance of all material and labour etc complete as per the direction of EIC |
| 22 | 12mm thick C.P with C M ( 1:6 ) over brick , including cost, conveyance of all material and labour etc complete as per the direction of EIC. |
| 23 | 16mm thick C.P with C M ( 1:6 ) over brick , including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 24 | 10 cm thick Cement Concrete (1:3:6)using 40mm size metalto recive A.S flooring including cost, conveyance of all material and labour etc complete as per the direction of EIC. |
| 25 | Fixingvitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast vetrifiedtiles.premium grade (600mmx600mm)including cost, conveyance of all material and labour etc complete as per the direction of EIC. |
| 26 | Fixing tiles in dados skirting and riser of steps on 12mm thick cement plaster 1:3 (1 cement : 3 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast vetrifiedtiles.premium grade (600mmx600mm)tiles. including cost, conveyance of all material and labour etc complete as per the direction of EIC. |
| 27 | Mild Steel doors,and windows including cost conveyance of all material etc complete as per the direaction of EIC |
| 28 | Painting 2coats over a coat of primer including cost of paints, labour& sundries etc complete |
| 29 | Painting 2 coats to walls with weather coat of approved shade including allcost, conveyance & royalty etc complete as per direction of the Engineer-in-charge. |
| 30 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade over a coat ofprimer Inculding cost of paint (For 10 Sqm.) |