|
| 1 | The annual work of belt jointing & associated work of CHP, BTPS, Obra |
| 2 | Removal of old & Damaged belt & shifting the same at the specified place near Tower No. 1 along with other scraps if any. |
| 3 | Transportation of New/Old & used belt from site store to conv. 11A/B & 12A/B site. |
| 4 | Transportation of New/Old & used belt from site store to site of Conv. No.4A/B, 8A/B, 9A/B, 10A/B,K-10, 15, 16 and Conv. 17 site, Boom Conveyor of old and new S/R, Intermediate Conv. of New S/R. |
| 5 | Belt jointing work along with removal of the rollers , rollers structures, splicing of the belt applying the vulcanizing materials by followingprocess: |
| 6 | By Hot vulcanizing process along with transportation of complete vulcanizing/vulcanizing structure. |
| 7 | By Cold vulcanizing process. |
| 8 | Laying of the belt on Con. Rollers either same collected belt on gravity take–up and other parts of Con. due to breakdown or adding /existing New/Old & used belt. |
| 9 | Clamping ofthe belt ,opening of the gear hold back bolts and coupling bolts, removal of the counter weight of gravity take-up box, lifting of the gravity takeup, After completion of the work fixing of coupling bolts & gear hold back bolts putting back counter weight in gravity takeup box and decoupling etc. Tensioning of the belt including all rigging works thereafter release of the belts tension after completion of the work and satisfactory trial run. |
| 10 | To carry out the work of repair of hole & patches on top & bottom side of existing conveyor belt by cold vulcanizing/Hot vulcanizing process. |
| 11 | Jointing work of belt pieces by proper splicing longitudinally by applying the vulcanizing material and proper cold vulcanizing process. |
| 12 | Belt jointing & Patching works with hot and cold vulcanizing of Coal Handling Plant ‘A’ TPS, Obra |
| 13 | Hot vulcanizing joint of conveyor belt |
| 14 | Conveyor belt jointing with cold vulcanizing process. |
| 15 | Laying of the belt on conveyor for belt joining |
| 16 | Clamping of belt, removal of thee counter weight of gravity take up, lifting of the gravity take up. After completion of the work fixing of the counter weight in gravity take up box and decoupling etc. Tensioning of the belt including all rigging works, there after release of the belt tensioning after completion of the work and satisfactory trial run. |
| 17 | Removal of old and damaged belt and shifting the same at the specified place. |
| 18 | Transportation of new /old and used belt from site store to conveyor where works to be carried out. |
| 19 | Repairing of conveyor belt having cuts /holes at difference places of ‘A’TPS Coal Handling Plant with cold vulcanizing technique at site. |
| 20 | Longitudinal joint of conveyor belt by using cold vulcanizing technique at site. |
| 21 | Work of rubber lagging of various types of drums/pulleys of Conv. system by grooved rubber sheet of 20mm thickness by using cold vulcanizing technique of CHP, BTPS |
| 22 | Work of rubber lagging of various types of drums/pulleys of Conv. system by grooved rubber sheet of 20mm thickness by using cold vulcanizing technique of CHP, BTPS |
| 23 | Work of rubber lagging of various types of drums/pulleys of Conv. system by grooved rubber sheet of 20mm thickness by using cold vulcanizing technique of CHP, BTPS |
| 24 | Work of Rubber lining of various types of drums / pulleys by using cold vulcanizing technique of ‘B’TPS |
| 25 | Clamping of the belt, open the gear hold back bolts & coupling bolts, removal of the counter weight of gravity take up box & lifting of the gravity take up box, after completion of the work, fixing of the bolts of the gear hold back, putting back counter weight take up box and all rigging works there after release of the belt tension after completion of the work and satisfactory trial run. |
| 26 | The Work Rubber lagging & lining of pulleys/Drum of different conveyors ofCoal Handling Plant (A) of CHD-III, BTPS, Obra Thermal Power Station. |
| 27 | Work of Rubber Lagging of various types of drums/pulleys of conveyor system of CHD-III ,A/BTPS, Obraby grooved rubber sheet of 20mm thickness using cold vulcanizing technique. |
| 28 | Work of Rubber lining of various types of drums/pulleys by using cold vulcanizing technique of conveyor system of CHD-III ,A/BTPS, Obra. |