Tender For Providing Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Vaphai Of 8 Assam Rifles (Now 42 Ar), Champhai-Mizoram

Assam Rifles-AR has published Tender For Providing Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Vaphai Of 8 Assam Rifles (Now 42 Ar). Submission Date for this Tender is 04-04-2024. Military Rifles Tenders in Champhai Mizoram. Bidders can get complete Tender details and download the document.




Tender Notice

42986615
Corrigendum : Tender For Providing Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Vaphai Of 8 Assam Rifles (Now 42 Ar)
Open Tender
Indian
Mizoram
Champhai
04-04-2024

Tender Details

Tender For providing Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Vaphai Of 8 Assam Rifles (Now 42 Ar)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 02-Apr-2024 Clarification Other 04-04-2024

Key Value

Document Fees
INR 1500 /-
EMD
INR 1392000.0 /-
Tender Value
INR 6.95 Crore /-

BOQ Items

Name of Work : Provn of improvement & enhancement of old existing temporary shelters and ancillaries including infrastructural development work for COB Vaphel
Sl. No. Item Description
1SCHEDULE ‘A Part-I’
2Supply & Constr of 01 x PUF Shelter (18.3m x6.1m) for 20 men SM Bk at COB Vaphai and 01 x PUF Shelter (18.3m x6.1m) for 20 men SM Bk at COB Farkawn (Specication and drawing complete all as specified for NIT). Drawing NoDGAR/COB/04 Sheet No 01/10attached.
3SCHEDULE ‘A Part-II’
4Supply & Constr of 01 x Single Offrs/JCOs PUF Shelter (10.64m x6.1m) living accn incl toilet, sanitary and water supply fittings at COB Vaphai and 02 x Single Offrs/JCOs PUF Shelter (10.64m x6.1m) living accn incl toilet, sanitary and water supply fittings at COB Farkawn (Specication and drawing complete all as specified for NIT). Drawing No DGAR/COB/03 Sheet No 01/10 attached.
5SCHEDULE ‘A Part-III"
6Supply & Constr of 01 x PUF Shelter (18.30m x 6.10m) for Kote at COB Vaphai and 01 x PUF Shelter (18.30m x 6.10m) for Kote at COB Farkwan (Specication and drawing complete all as specified for NIT). Drawing NoDGAR/COB/01 sheet No 01/09 attached.
7SCHEDULE ‘A Part-IV
8Supply & Constr of PUF Shelter (18.30m x 6.10m) for Store at Farkwan(Specication and drawing complete all as specified for NIT). Drawing NoDGAR/COB/01 sheet No 01/09 attached.
9SCHEDULE ‘A Part-V
10Supply & Constr of 01 x PUF Shelter (8m height) for Sentry post/GdRoom at COB Vaphai and03 x PUF Shelter (8m height) for Sentry post/GdRoom at COB Farkawn (Specication and drawing completed all as specified for NIT). Drawing No 01 Sheet No 03/11 attached.
11SCHEDULE ‘A Part-VI
12Supply & Constr of 01 x PUF Shelter (18.30m x 6.1m) for Signal Centre/MI Room/Coy Office at COB Vaphai and 01 x PUF Shelter (18.30m x 6.1m) for Signal Centre/MI Room/Coy Office at COB Farkawn (Specication and drawing complete all as specified for NIT). Drawing No DGAR/COB/04 Sheet No 02 to 07 attached.
13SCHEDULE ‘A Part VII
14Supply & Constr of 01x PUF shelter (7.20m x2.20m qty 2 Nos) 6 men Toilet Block-II at Vaphai and 03 x PUF shelter (7.20m x2.20m qty 2 Nos) 6 men Toilet Block-II at Farkawn (Specication and drawing complete all as specified for NIT). Drawing No DGAR/COB/06 and DGAR/COB/05 Sheet No 07/08 and 05 to 06 attached.
15SCHEDULE ‘A Part VIII’(Security Fencing of 410 Mtr at Vaphai and 410 Mtr at Farkawn perimeter) (Total 820 Mtr perimeter)
16Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. all kind of soil.
17Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size)
18Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, plinth,posts etc.
19Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. 65X65X6 mm angle iron post for both Iron pillar and strut post.
20Fencing with welded steel wire fabric fencing with posts of specified material and standard design of size 75 mmx 75mm using 4 mm dia GI wire
21Extra for providing and fixing FI Sup for barbed wire of 40x 6 mm flat iron section
22Painting with aluminium paint of approved brand and manufacture to give an even shade Two or more coats on new work on chain link fencing
23Providing and fixing concertina coil fencing with punched tape concertina coil 600mm dia 10 metre openable length (total length 90m) having 50 Nos founds per 6 metre length, upto 3m height of wall with existing angle iron "Y" shaped placed 2.4m or 3.00m apart and with 9 horizontal R.B.T reinforced barbed wire, stud tied with G.I clips to retain horizontal including necessary bolts or G.I barbed wire tied to angle iron all complete as per direction of Engineer
24Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. 16.18.1 With G.I. barbed wire
25Painting with aluminium paint of approved brand and manufacture to give an even shade Two or more coats on new work on chain link fencing
26SCHEDULE ‘A Part IX’(Block Top Bitumen Internal Road of 270 m at Vaphai and 270 m at Farkawn) (Total 540 m)
27Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge
28Prepparation and consolidation of sub grade with power power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm deep dressing to camber and consolidating with road roler including making goods undulation etc and re rolling the sub grade and disposal of surplus earth with lead upto 50 meters
29Supplying and laying stone aggregate of 90 to 45 mm size of WBM with moroum as binding material including 13.2mm size stone screening sorting, watering spreading to template, compacting stone aggregate in uniformed thickness and consolodiation with power road roller of 8 to 10 tonne capacity in two layer with proper gradient and camber etc complete(150mm thick )
30Supplying and laying stone aggregate of 63 to 45 mm size of WBM with moroum as binding material including 11.2mm size stone screening sorting, watering spreading to template, compacting stone aggregate in uniformed thickness and consolodiation with power roa droller of 8 to 10 tonne capacity in two layer to proper grade and camber etc. Complete
31Providing and applying tack coat using hot straight bitumen of VG-10 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specification on wbm @0.75 kg/sqm
322.5 cm premise carpet surface with 2.25 cum and 1.12 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively 100 Sqmand 52 Kg and 56 Kg of hot bitumen per cum of stone chippings of 13.2 mm size and 11.2 mm size respectively,including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 ton capacity etc. Complete with paving asphalt 30/40 VG 10 heated and then mixed with solvent at the rate of 70 gm per kg of asphalt
33Providing and laying seal coat of premissed fine aggregate (passing2.36mm and retained on 180 micron seive) with bitumen using 128 Kg of bitumen of graded 80-100(vg-10) bitumen per cum of fine aggregate per 100 sqm of road surface incl rolling and finishing with road roller in complete.
34SCHEDULE ‘A Part X’ (R.R Masonry Retaining 60 RM wall with Drain for PFT structures as development works at COB Vaphai and R.R Masonry Retaining 60 RM wall with Drain for PFT structures as development works at COB Farkawn) (Total 120 RM)
35Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
36Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:4:8(1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) all work upto plinth level.
37Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1cement : 6 coarse sand)
38Random rubble masonry with hard stone in Superstructure above plinth level and upto floor five level,including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) above plinth level with :Cement mortar 1:6 (1cement : 6 coarse sand)
39Providing and laying of cement concrete in cooping of R.R masonry retaining walls of specified grade excluding the cost of centering and shuttering with mix of1:2:4(1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) upto floor five level.
40Raised and cut pointing in stone work in white cement mortar mix of 1:3 (1 cement: 3 fine sand)
41Supplying and stacking at site 20 mm size stone aggregate
42Providing and fixing unplasticised Rigid PVC sewer pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm diameter.
43Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:2:4(1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) all work upto plinth level.
44Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:3:6(1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) all work upto plinth level.
45SCHEDULE "A Part XI’ (Development Works incl Main Drain of 60 m at COB Vaphai and Development Works incl Main Drain of 60 m at COB Farkawn) Total 120 M
46Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m disposal soil to be levelled and neatly dressed . All kind of soil.
47Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind of soil
48Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size)
49Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1cement : 6 coarse sand)
5112 mm cement plaster of mix 1:4 (1 cement: 4 fine sand)
52SCHEDULE ‘A Part XII’(PCC Footpath with Chequired Tiles of 160 m at Vaphai and 160 m at Farkawn) (Total 320m)
53Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m disposal soil to be levelled and neatly dressed . All kind of soil.
54Supplying and laying stone aggregate of 90 to 45 mm size of WBM with moroum as binding material including 13.2mm size stone screening sorting, watering spreading to template, compacting stone aggregate in uniformed thickness and consolodiation with power road roller of 8 to 10 tonne capacity in two layer with proper gradient and camber etc complete(150mm thick)
55Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:2:4(1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) all work upto plinth level.
56Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
57Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).
58SCHEDULE ‘A Part XIII’(Earth work in excavation in over areas at Vaphai and Farkawn)
59Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of exca vated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail