|
| 1 | For HYDRO CHLORIC ACID (30% CONCENTRATION) TECHNICAL GRADE |
| 2 | CHHABRA THERMAL POWER PROJECT (CTPP O&M), CHHABRA |
| 3 | KOTA SUPER THERMAL POWER STATION (KSTPS), KOTA |
| 4 | RAMGARH THERMAL POWER PROJECT (RGTPP), RAMGARH-JAISALMER |
| 5 | KALISINDH THERMAL POWER PROJECT (KaTPP), JHALAWAR |
| 6 | CHHABRA SUPER CRITICAL THERMAL POWER PROJECT (CSCTPP), CHHABRA |
| 7 | SURATGARH SUPER THERMAL POWER STATION (SSTPS O&M), SURTGARH |
| 8 | SURATGARH SUPER CRITICAL THERMAL POWER PROJECT (SSCTPP), SURTGARH |
| 9 | DHOLPUR COMBINED CYCLE POWER PROJECT (DCCPP), DHOLPUR |
| 10 | For CAUSTIC SODA LYE (100% Concentration ) |
| 11 | CHHABRA THERMAL POWER PROJECT (CTPP O&M), CHHABRA |
| 12 | KOTA SUPER THERMAL POWER STATION (KSTPS), KOTA |
| 13 | RAMGARH THERMAL POWER PROJECT (RGTPP), RAMGARH-JAISALMER |
| 14 | KALISINDH THERMAL POWER PROJECT (KaTPP), JHALAWAR |
| 15 | CHHABRA SUPER CRITICAL THERMAL POWER PROJECT (CSCTPP), CHHABRA |
| 16 | SURATGARH SUPER THERMAL POWER STATION (SSTPS O&M), SURTGARH |
| 17 | SURATGARH SUPER CRITICAL THERMAL POWER PROJECT (SSCTPP), SURTGARH |
| 18 | DHOLPUR COMBINED CYCLE POWER PROJECT (DCCPP), DHOLPUR |
| 19 | Note :- The quantity mentioned at Col No. 3 for Soda Lye is based on 100% concentration basis. Since invoices for supply of caustic soda lye shall be generated on 100% concentration basis therefore freight & insurance including loading & unloading charges per MT at respective site shall only be paid on 100% concentration basis & no additional payment shall be made on account of supplied quantity on 47.5 % i.e. quoted freight & insurance shall be fixed payable against documentry evidence but material ( Caustic Soda Lye ) shall only be supplied on 47.5 % concentration basis as per requirement of technical specification to respective sites. The quantities on Both concentration (47.5% & 100%) are separately mentioned in Technical specification. |
| 20 | Liquid Chlorine (Min 99.8% Chlorine by volume) (Technical Grade) |
| 21 | CHHABRA THERMAL POWER PROJECT (CTPP O&M), CHHABRA |
| 22 | KOTA SUPER THERMAL POWER STATION (KSTPS), KOTA |
| 23 | RAMGARH THERMAL POWER PROJECT (RGTPP), RAMGARH-JAISALMER |
| 24 | KALISINDH THERMAL POWER PROJECT (KaTPP), JHALAWAR |
| 25 | CHHABRA SUPER CRITICAL THERMAL POWER PROJECT (CSCTPP), CHHABRA |
| 26 | SURATGARH SUPER THERMAL POWER STATION (SSTPS O&M), SURTGARH |
| 27 | SURATGARH SUPER CRITICAL THERMAL POWER PROJECT (SSCTPP), SURTGARH |
| 28 | DHOLPUR COMBINED CYCLE POWER PROJECT (DCCPP), DHOLPUR |