Tender For Repair And Improvement Of Certain Ac Plant Rooms And Servicing Repairs Of Unserviceable Spares Of 60 Tr To 120 Tr Central Type And Other Connected Works Of Ac Plants At Naval Dockyard, Visakhapatnam Under Ge (I) Dm Visakhapatnam., visakhapatnam-Andhra Pradesh

Military Engineer Services-MES has published Tender For Repair And Improvement Of Certain Ac Plant Rooms And Servicing Repairs Of Unserviceable Spares Of 60 Tr To 120 Tr Central Type And Other Connected Works Of Ac Plants At Naval Dockyard, Visakhapatnam Under Ge (I) Dm Visakhapatnam.. Submission Date for this Tender is 16-04-2024. HVAC Tenders in visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42859097
Corrigendum : Tender For Repair And Improvement Of Certain Ac Plant Rooms And Servicing Repairs Of Unserviceable Spares Of 60 Tr To 120 Tr Central Type And Other Connected Works Of Ac Plants At Naval Dockyard, Visakhapatnam Under Ge (I) Dm Visakhapatnam.
Open Tender
Indian
Andhra Pradesh
visakhapatnam
16-04-2024

Tender Details

Repair And Improvement Of Certain Ac Plant Rooms And Servicing Repairs Of Unserviceable Spares Of 60 Tr To 120 Tr Central Type And Other Connected Works Of Ac Plants At Naval Dockyard, Visakhapatnam Under Ge ( I ) Dm Visakhapatnam.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-Mar-2024 CORRIGENDUM NO 1 BOQ 09-04-2024
2 09-Apr-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 16-04-2024

Key Value

Document Fees
INR 1000 /-
EMD
INR 128155.0 /-
Tender Value
INR 68.77 Lakhs /-

BOQ Items

Name of Work: REPAIR AND IMPROVEMENT OF CERTAIN AC PLANT ROOMS AND SERVICING REPAIRS OF UNSERVICEABLE SPARES OF 60 TR TO 120 TR CENTRAL TYPE AND OTHER CONNECTED WORKS OF AC PLANTS AT NAVAL DOCKYARD, VISAKHAPATNAM UNDER GE (I) DM VISAKHAPATNAM.
Sl. No. Item Description
1Preventive maintenance of central type AC plant by carrying out routinecheck of the Plant complete for smooth functioning all as per manufacturer"s instructions and as directedfor 39.0 TR x 03 Nos installed at SMU bldg including attending to under mentioned jobs to ensure its satisfactory performance:- Note: Quoted Rates are deemed to be for carrying out checks as under :- (i)Contractor has to deploy manpower at the worksite to attend the breakdown calls received from representatives during two shifts throughout the week including sundays & holidays and on emergencies in third shift shall be attended,preventive maintenance for the entire duration of contract.It is the contractors responsibilityto make the unit functional and sufficient stock of spares shall be maintained to rectify the breakdown within scheduled period. Cleaning, stacking,sorting,handling and upkeeping of maintenance shall be carried out by contractor. (ii)Checking the system for visual leaks at all flare fittings and arresting.
2(iii)Carrying out leak test with soap solution in case reports indicate frequent loss/recharging of refrigerant into the system whenever required (iv)Checking operation ,suction& discharge pressures.In case of any abnormality identifying and correcting the same (v)checking and setting of safety controls such as HP/LP cutouts,overload protections and thermostats etc. (vi)Cleaning of pre air filters and replacing the same if necessary (vii)Checking lubricating oil level at the sight glass if found below the normal level the problem shall be analyzed and rectified. (viii)Running of standby unit and observe for satisfactory performance. (ix)Checking the incoming voltage and running currents and take appropriate measures. (x)checking for any abnormal noise/vibration from moving parts such as compressors,motors,fans etc in case of any abnormality,investigating and correcting the same (x)checking and rectifying any water leaks and arresting them
3(xi)Checking the operation of controls and making them functional (xii)Checking and cleaning of fan,runner blades and replace if required (xiii)Cleaning cooling coils by cleaning agent (CFC free) (xiv)Checking the cooling tower water level (xv)Checking the water level in the makeup water tank. (xvi)Starting and checking the running condition of cooling tower fan (xvii)Starting the pump and checking the running condition including checking the NRVs and arresting the leaks (xviii)Cleaning condensate drain tray (xix)Checking the cooling tower nozzles for proper spray and replacing the same if necessary. (xx) Descaling the condenser and replacing the condenser end shield gaskets (xxi)Record of these shall be maintained and submitted monthly to engineer in charge
4Note :-The above quoted rate is inclusive ofall spare parts apart from below mentioned spare parts which will be paid seperately to make the unit completely functional, T&P manpower required in the site
5All as per item No. 1.00 above,but for 39 Tr x 3 Nos. at MI room
6All as per item No. 1.00 above,but for 39 Tr x 3 Nos. atAuditorium room
7All as per item No. 1.00 above,but for 50 Tr x 3 Nos. at Electrical dept
8All as per item No. 1.00 above,but for 50 Tr x 2 Nos. at Periscope bay
9All as per item No. 1.00 above,but for 50 Tr x 3 Nos. at Load Test bay
10All as per item No. 1.00 above,but for 120 Tr x 4 Nos. at 25A bldg
11All as per item No. 1.00 above,but for 60 Tr x 3 Nos. at 25D bldg
12All as per item No. 1.00 above,but for 100 Tr x 3 Nos. at 25E bldg
13All as per item No. 1.00 above,but for 75 Tr x 2 Nos. at 25E bldg
14Repairs, overhauling and servicing ofAC Plant compressor between 50 tr by stripping out both end covers, cylinder head, cylinders, connecting rod, crank shaft, oil pump, side covers, bush bearings etc.,and refrigerant taking the cylinder for reuse/replacement(if available) of unserviceable worn out parts in the compressor,leak testing with CO2 gas under constant pressure of 250 PSI after complete transfer of refrigerant gas from the entire system, rectification of leakagesincluding cutting and brazing the refrigeration pipes wherever required, , teflon washers of valves, copper tubing, flare nuts etc., neutralizing after the pressure hold good for at least 24 hours vacuumization of system, testing and commissioning of air conditioning plants,cleaning the system with CO2/Nitrogen gas for leak detection for minimum 24 Hrs, after flushing out the system, vacuumization and charging with refrigerant gas & compressor oil
15and testing the unit on no load and full load conditions all as specified and directed.The rate quoted is inclusive of repair/replacement of spare parts such as sensors,Bushing with collar standard,Shaft seal assembly,Bearing bushing,Gear Wheel,Single frame (unload -65),Rocker for unload mechanism,Bearing cup,Spring holder and spring,Cup washer,Crank shaft,Half section of bearing standard, Bush for piston pin,Castie nut,Split pin,pulley and pulley belt,pistonwith pin & rings,Cylinder liner ,Unloading ring with pin,Tension spiral,Suction valve ring plate,Valve spring,Suction valve retaining plate,Discharge valve seat,Discharge valve ring plate,Oil pressure regulating valve,Safety valve assembly,Set of gasket,Set of neoprene “O” Ring,Set of dowty rings,Set of sealing rings,Crank shaft,Connecting rod,Piston,Piston pin,Piston lock,Suction reed,Suction valve springs,Discharge valve
16springs,Discharge valve assembly,Valve plate,Spring lifter pin,Gasket set,bearings,Oil pump,Thrust washer,Shaft seal assembly with bush,Piston ring and oil ring,Cylinder line and replacement of suction reeds, discharge reeds, piston rings , oil rings and replacement of gasketsetc and any other items to make the unit functional.complete all as specified and directed. Note:- Supply only refrigerant gas, compressor oil for the compressors will be measured and paid under relevant items of Schedule ’A’ and rest of the spare parts required to make the unit functional is deemed to be inclusive of quoted rate.
17All as per item No. 11.00 above, but AC plant compressor between upto 30 TR
18All as per item No. 11.00 above, but AC plant compressor between upto 100 - 120 TR
19All as per item No. 11.00 above, but AC plant compressor between upto 75 TR
20Supply onlyR-407 c gas
21Material and labour for descaling the followingcondensers by using HCL acid with continuous circulation method using circulation pump, finally neutralizing with fresh water, opening both end covers of shell and tube condensers, cleaning of copper tubes manually by using nylon brushes, re-fixing the end covers with new neoprene rubber gaskets, commissioning after complete performance test of the system all as specified and directed. (a)Upto 50 TR
22(b)120 TR
23(c )100 TR
24(d)60 - 80 TR
25De-carbonizing/cleaning of LT 415/380 V, 3 phase bus bar, bus bar chambers of LT panelselectrical connections complete, LT ACB, MCCB,MCB,switch fuse unit arrangement,in-coming and out-going installed in plant room and cleaning the bus bar with CTC, applying, Backtol (red) solution to the bus bar insulators,checking all the connections,tightening the nuts, bolts, thimblesduly applied with petroleum jelly to nuts, bolts and thimbles of in-coming and out-going system complete including replacement of defective rusted bolts , nuts and spring washers with new cadmium coated ones all as specified and directed
26Note :- Items apart from supply only which are required in site are deemed to be included in the quoted rate.Material such as indication lamp, ammeter, voltmeter will be measured and paid separately as supply only.Any other items equired to make the unit functional is deemed to be included in the quoted rate.Contractor has to deploy manpower at the worksite to attend the breakdown calls received from representatives during two shifts throughout the week including sundays & holidays and on emergencies in third shift shall be attended,preventive maintenance for the entire duration of contract.It is the contractors responsibilityto make the unit functional and sufficient stock of spares shall be maintained to rectify the breakdown within scheduled period. Cleaning, stacking, sorting, handling and upkeeping of maintenance shall be carried out by contractor.
27Supply only MCCB of 250 Amps, 4 pole, 36 KA, AC supply50Hz, 415 V complete all as specified and directed. Make :- Indo Asian/Havells/L&T
28Supply onlyMCCB of 160 Amps, 4 pole, 36 KA, AC supply50Hz, 415 V complete all as specified and directed. Make :- Indo Asian/Havells/L&T
29Supply only MCCB of 100 Amps, 4 pole, 36 KA, AC supply50Hz, 415 V complete all as specified and directed. Make :- Indo Asian/Havells/L&T
30Supply onlyMCCB upto 63 Amps, 4 pole, 36 KA, AC supply50Hz, 415 V complete all as specified and directed. Make :-Indo Asian/Havells/L&T
31Supplyonly Power contactor 32 Amps, 3 pole, 415 V complete all as specified and directed. Make :-Indo Asian/Havells/L&T /ABB/Schneider
32Supply and fix rubber insulating mat in front of LT panel board of size 3 mm thick, 1 m width up tp 3.3 KV all as specified and directed Make :- RPG or equivalent as approved by GE.
33Supply only digital electronic Ammeter (0-100 amps range)withbuilt in selector switch suitable for LT 415 V panel flush pattern square type 96 mm x 96 mm with adopter completeall as specified and directed.
34Supply only digital electronic Volt meter (0-500 volts range) withbuilt in selector switch suitable for LT 415 V panel flush pattern square type 96 mm x 96 mm with adopter completeall as specified and directed
35Supply only indication lamps (LED type) red, yellow and blue in colours of 22.5 mm dia to monitor on LT panel board suitable for 240 V AC supply and taking down unserviceable indication lamps all as specified and directed.
36Material and labour for monthly cleaning of entire indoor substation buildings inside wall, ceiling, floor and outside wall, plinth protection with suitable brush/broom/wiper, removing wild vegitation around substation building complete all as sjpecified and directed.
37M&L for Earthing complete with copper plate 60×60cm x 3.15mm thick electrode and 20 × 3mm copper strip as earthing lead, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less"than 1.5 metres below normal ground level, connected to20×3mm copper strip by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion complete all as specified and directed.
38Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 20 x 3mm copper strip complete all as specified and directed.
39Supply onlyR-22 gas. Make:-Refron 22/Floron 22/Mafron 22
40Supply onlyR-134 A gas. Make:-Refron/Floron/Mafron
41Supply only compressor oil. Make:-Servo/N-68
42Supply only compressor oil. Make :- BSE -170
43Material and labourfor taking out the defective pressure cut-outs of any range and model and supply & fix new pressure cut-outs, connecting the pressure lines/control wiring, leak testing and commissioning all as specified and directed Make:-Indofoss/Danfoss/Ranco a)HP/LP pressure cut-out MP-15
44(b)Water pressure cut-out IPS-70
45(c)Oil pressure cut-out MP-55
46S&F for VVE-70 model expansion valve of Sporlon make with necessary modification, brazing, lead testing and commissioning including taking out old unsv expansion valve complete all as specified and directed.
47All as per item No. 35.00 above, but for VVE- 52
48Supply and fix in repairs pilot solenoid valve, 220V to the refrigerant system, reconnecting the refrigeration piping including leak testing, brazing to the pipe line, necessary copper tubing etc., wherever required all as specified and directed. Make :- Sporlon/Donfos
49All as per item No.37.00 above, but 110V
50Supply and fix pressure gauge for suction/discharge refrigerant lines and water lines of square/round type 2"/4" dial of following ranges for Package/Central type AC plants including taking down old unserviceable pressure gauge complete all as specified directed Make -Air Master/Febig/Scientific (a)0-150 PSIfor refrigerant line
51(b)0-300 PSIfor refrigerant line
52(c)0-12 Kg./cm2for water line
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail