Nitno13itemno8 Strengthening Of Foundation Of 11 Kv Transformer Set No. 1 And 2 Installed At Shalimar Bagh Sps.Re-Invited., rithala-Delhi

Delhi Jal Board-DJB has published Nitno13itemno8 Strengthening Of Foundation Of 11 Kv Transformer Set No. 1 And 2 Installed At Shalimar Bagh Sps.Re-Invited.. Submission Date for this Tender is 15-03-2024. Transformer Supply Tenders in rithala Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

42788186
Nitno13itemno8 Strengthening Of Foundation Of 11 Kv Transformer Set No. 1 And 2 Installed At Shalimar Bagh Sps.Re-Invited.
Open Tender
Indian
Delhi
rithala
15-03-2024

Tender Details

Nitno13itemno8 Strengthening Of Foundation Of 11 Kv Transformer Set No. 1 And 2 Installed At Shalimar Bagh Sps.Re-Invited.

Key Value

Document Fees
INR 500 /-
EMD
INR 8200.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Strengthening the foundation of 11KV transformer set no.1&2 installed at Shalimar SPS.
Sl. No. Item Description
1Dismantling of all electric connection of both 11KV transformer from the HT panel and LT panel with all safety measures and as per direction of Engineer in charge. with the help of long boom crane and heavy labour.
2Dismantling of both 11KV transformer with the duct already installed for air circulation and foundation of transformer lift the transformer with the help of long boom crane and heavy manual labour.
3Hiring of long boom crane including cost of services of operating staff, cost of lubricating Oil, diesel and other consumable items excluding GST.
4Supply of C type MS channel of size 150 X 75 X 5.7mm of total length 24 meter long or as per site requirement.
5Breaking of RCC by power hammer & removing of foundation MS channel by manual labor through hammering. This job includes the removing of melba outside the pump house by manual labor.
6Fixing the MS channel and making new foundation of RCC filling of Cement & concert mixture heaving CC ratio of 1:2:4 for grip of foundation with MS channel in RCC structure.
7Installation of both 11KV transformer joining the duct for air circulation with transformer with the help of long boom crane and heavy manual labour with all safety measures.
8Making all the electric connection with HT and LT panel with all safety measures and as per direction of Engineer in charge. with the help of long boom crane and heavy labour.
9Testing and commissioning charges of complete pump set on no load & full load for minimum 48 hours.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail