}

Tender For Construction Of 33 Kv Line Sasni Gate Aligarh, aligarh-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For Construction Of 33 Kv Line Sasni Gate Aligarh. Submission Date for this Tender is 11-03-2024. Bolts Tenders in aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42775284
Tender For Construction Of 33 Kv Line Sasni Gate Aligarh
Open Tender
Indian
Uttar Pradesh
aligarh
11-03-2024

Tender Details

Tender For Construction Of 33 Kv Line Sasni Gate Aligarh- 1 Safe Loading, Carriage And Then Safe Unloading Of The Following Material From Store Centres Under The Jurisdiction Of Esd Aligarh To Dump Site Proper Stacking. 2 St Pole 13 Mtr Long 3 Earthing Complete 4 Stay Complete 5 33 Kv Xlpe Cable 3X300 Sq.Mm. ( For Underground ) 6 Acsr Dog Conductor 7 33 Kv Pin Insulator With Pin 8 33Kv Disc Fitting 9 33Kv Disc Insulator 70Kn 10 33 Kv Pg Clamp 11 Gi Wire 6 Swg 12 Gi Wire 10 Swg 13 33 Kv Line Isolator 14 Supply Of Following Of Material : 15 Hdpe , Pn-6 Pipe ( 200Mm. Dia ) With Clamps Etc. 16 33 Kv Cable Jointing Kit 3X300sq.Mm. ( Outdoor ) 17 Stone Pad 18 33 Kv F- Bracket 19 33 Kv V Type Cross Arm 20 Top Channel Size 125X65x2240 Mm. 21 Dropper Channel Size 100X50x2028 Mm. 22 Tee Off Chennal Size 125X65x1300 Mm. 23 Cross Bracing Angle Ms Angle Iron ( 65X65x6, 4300Mm. ) 24 Cross Arm Holding Clamp 25 Gaurding Angle 26 Pole Clamp With Bolt & Nut 27 Barbed Wire 28 Danger Board With Clamp 29 Nut Bolt & Washer 30 Number Plate With Clamp 31 Alluminum Paint 32 Red Oxide Paint 33 Alluminum Binding Wire 34 I Bolt 35 Safe Dragging / Loading - Unloading From Dump Site To Pit Site And Fabrication & Erection Of Single Pole For 33 Kv Line On 13.0 Mtr S.T. Pole With Fitting Of Necessary Clamp & Other Acessories Like 1 No Channel Cross Arm / F-Braket, 3 No. Pin Insulatoras Per Norms. 36 Safe Dragging / Loading - Unloading From Dump Site To Pit Site And Fabrication & Erection Forsectional Double Pole For 33 Kv Line On 13.0 Mtr S.T. Pole With Fitting Of Necessary Clamp & Other Acessories Like 1 No Top Channel Of 125X65x6 Mm Size 3200 Mm, 6 No. Disc. Fitting , Bracing Angle 1 Set., Disc Insulator 6 No. And 3 No. Pin Insulator As Per Norms. 37 Safe Dragging / Loading - Unloading From Dump Site To Pit Site And Fabrication & Erection Forexposure Double Pole For 33 Kv Line On 13.0 Mtr S.T. Pole With Fitting Of Necessary Clamp & Other Acessories Like 3 No Top Channel Of 125X65x6 Mm Size 3200 Mm, Bracing Angle 1 Set., And 9 No. Pin Insulator As Per Norms. 38 Safe Dragging / Loading - Unloading From Dump Site To Pit Site And Fabrication & Erection Forfour Pole For 33 Kv Line On 13.0 Mtr S.T. Pole With Fitting Of Necessary Clamp & Other Acessories Like 4 No Top Channel Of 125X65x6 Mm Size 3200 Mm, 4 Set Bracing Angle, 8 No. Pin Insulator, 24 No. Disc Insulator, 06 No. Disc Fitting And 08 No. E-Braket As Per Norms. 39 Grouting Of 13 Mtr. St Pole By Digging Of Pit 1.83 Mtr Deep, Placing Stone Pad At Bottom 450X450 Size Foundation Is Provided With Help Of Steel Or Wooden Formers, Groutung With 1:4:8 Ratio Cement, Sand & First Class Brick Ballast 0.268 / 0.285 Cu Mtr For 9.0 Mtr Pcc Pole & 11 Mtr Stp, Plinthing 0.3 Mtr Above G / L And Proper Plastering. 40 Cradle Guarding Of 33 Kv Line At Road Crossing, 11 Kv Line Crossing, Canal / Telephone Line Crossing By Fixing Guarding Angle 65X65x6 Mm, 3500 Mm At Double Pole And 2600 Mm Long At Single Pole By Stringing And Sagging Of 3 No. G.I.Wire With Lacing And Tightening With Mounting. 41 Nozeling And Grouting Of Stay At Sectional Pole And Extra Stay Sets At Angle Locations ( All The Civil Material Will Be Arranged By The Contractor ) 42 Earthing Of Pole St Pole By 6 Swg Wire By Providing And Fixing Of 20 Mm Dia Earthing Rod 2.550 Mtr. Long As Per Norms Complete In All Respect. 43 Stringing, Sagging, Binding And Jumpering Of Acsr Dog Conductor. 3 Phase Of 33 Kv Line Including Fixing, Mounting Of P.G.Clamp Suitable For Dog Conductor At Sectional Point. 44 Digging Of Trench And Laying Of 3X300 Sq. Mm Xlpe Cable Underground Double Circuit In Hdpe Pipe :Laying Of Double Circuit 3X300 Sq .Mm Xlpe Cable ( 2X1530 Mtr. ) In Normal Soil By Digging Of Trench 1050 Mm Deep, 750 Mm Wide Including Supply Of Required Materials, As 1St Class Bricks, Stone Slabs And Fine Sand. Providing 150 Mm Fine Sand Cusion Beneath, And 150 Mm Sand Cusion Above The Cable. The Cable Shall Be Duly Protected By Bricks, Sand And Stone Slab. The Inter Axial Spacing Between Two Cables Should Be In Between 0.25 To 0.40 M. After Laying The Cable In Hdpe Pipe Refilling And Ramming Of The Left Out Soil, Closing The Trench And Leveling. 45 Installation Of 33 Kv 3X300 Sq. Mm Outdoor End Terminationsfor 33 Kv Xlpe Cable 46 Fixing Of Barbed Wire On The Pole Above 2750 Mm Ground Level. Barbed Wirewrapped For A Distance Of 0.9 Mtr. With Apitch Of 13.Mm At A Height. 47 Fixing Of Danger Board Of Size 250X200x2 Mm 3650 Mm Above Ground Level As Per Respo Norms. Respo Drawing No-55 48 Fixing Of Number Plate Of Size 250X200x2 Mm 3650 Mm Above Ground Level As Per Respo Norms. Respo Drawing No-55 49 Lineisolator Structurefabrication Of Isolator Structures 3.5Mtr In Height As Per Drawing No. Res 39 Digging Of Two Nos. Pits Of Size 1.075 X 0.9 X0.3 Mtr Providing Stone Pad At The Bottom Of The Pit And Grouting Pad At The Bottom Of The Pit And Grouting Of Two Legs Of The Isolator Structure In Cc ( Cement, Coarse Sand And Stone Grit Of 20 Mm Gauge ) Of Ratio 1:4:8 In Block Of 1.075 Mtx 0.3 Mtr Including Supply Of All T&P Complete In All Respect. The Work Includes Dragging, Shifting Upto 40 Mtr. Raising And Erecting The Two Legs With Runner Of Isolator In Proper Allingment Level And Plumb. Plinths Of The Isolator Structure Shall Be Properly Finished With Champering Of Edges. ( All The Material Will Be Supplied By The Contractor Like M.S Flat Etc. ) 50 Installation Of Line Isolators Assembling And Installation Of Line Isolator On The Isolator Structure , Adjusting Of Opening Mechanism In Proper Alignment So As To Ensured Smooth Operation Of The Same. In Case Of Line Isolator Proper Operation Of Earth Links Shall Also Be Ensured. The Work Includes Fabrication For Proper Fixing If Required. 51 Laying Of Cable & Hdpe Pipelaying Of Single Circuit 33 Kv 3X300 Sq Mm Xlpe Cable And Hdpe Pipe By Drilling Method Below Nhai Road / Railway Crossing. Twin Cables Be Laid Parallelly ( 2X760 Mtr ) At The Depth Of 3 Mtr From The Under Surface In Hdpe Pipe ( 200 Mm. Dia. ) Casing. 52 Noc Will Be Granted From Central / State Electrical Safety Department. ( Final Settlement Of The Payment Will Be On The Basis Of Quotation Of Expenditure Of Proovided By The Contractorin Boq Or Costof Expenditure Provided By Electrical Saftey Which Is Low ) . 53 Permission Of Nhai / Pwd / Railwayetc. For Road Crossing.. ( Final Settlement Of The Payment Will Be On The Basis Of Quotation Of Expenditure Provided By The Contractor In Boq Orcostof Expenditure Provided By Nhai Depaartment Whichever Is Low. ) 54 Permission Of Cutting And Chopping Of Tree From Forest Deppt. ( ( .Final Settlement Of The Payment Will Be On The Basis Of Quotation Of Expenditureprovided By The Contractorin Boq Or Quotation Of Expenditure Provided By Forest Department Which Is Low ) ) 55 Restoring The Road As It Is Before After Completion Of Work 56 Painting Of Poles Painting Of Poles With One Coat Of Red Oxide, Two Coats Of Enamel Paint Isi Mark.

Key Value

Document Fees
INR 5900 /-
EMD
INR 175000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:fo|qr uxjh; forj.k [k.M&izFke] vyhx<+ ds {ks=kUrxZr xq.koRRkkijd fo|qr vkiwfrZ gsrq 132 ds-oh- fo|qr midsUnz ckSusj ls 33 ds-oh- ykbu lkluh xsV dk fuekZ.k Municipal Corporation ¼fctusl Iyku½ en ds vUrxZr lseh VuZ&dh vk/kkj ij bZ&fufonk fof’k”Vhdj.k ds vuqlkj djk;k tkukA
Sl. No. Item Description
1Safe loading, carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of ESD Aligarh to dump site proper stacking.
2ST Pole 13 Mtr long
3Earthing complete
4Stay complete
533 KV XLPE Cable 3x300 sq.mm. (for underground)
6ACSR Dog Conductor
733 KV Pin Insulator with pin
833KV Disc Fitting
933KV Disc Insulator 70KN
1033 KV PG Clamp
11GI Wire 6 swg
12GI Wire 10 swg
1333 KV Line Isolator
14Supply of following of material :
15HDPE , PN-6 Pipe (200mm. Dia) with Clamps etc.
1633 KV cable Jointing Kit 3x300sq.mm. (outdoor)
17Stone Pad
1833 kV F- Bracket
1933 kV V Type Cross Arm
20Top Channel size 125x65x2240 mm.
21Dropper Channel size 100x50x2028 mm.
22Tee off Chennal size 125x65x1300 mm.
23Cross Bracing Angle MS Angle Iron (65x65x6, 4300mm.)
24Cross Arm Holding Clamp
25Gaurding Angle
26Pole Clamp with bolt & nut
27Barbed wire
28Danger Board with Clamp
29Nut Bolt & Washer
30Number Plate with clamp
31Alluminum Paint
32Red Oxide Paint
33Alluminum Binding Wire
34I Bolt
35Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection of Single Pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 1 no Channel Cross Arm/ F-Braket, 3 No. Pin insulatoras per norms.
36Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection forSectional Double pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 1 No Top channel of 125x65x6 mm size 3200 mm,6 No. Disc. Fitting , Bracing angle 1 set., Disc insulator 6 No. and 3 No. Pin insulator as per norms.
37Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection forExposure Double pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 3 No Top channel of 125x65x6 mm size 3200 mm,Bracing angle 1 set., and 9 No. Pin insulator as per norms.
38Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection forFour pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 4 No Top channel of 125x65x6 mm size 3200 mm,4 set Bracing angle, 8 No. Pin insulator, 24 No. Disc Insulator,06 No. Disc Fitting and 08 No. E-Braket as per norms.
39Grouting of 13 Mtr. ST Pole by digging of pit 1.83 Mtr deep, placing stone pad at bottom 450x450 size foundation is provided with help of steel or wooden formers, groutung with 1:4:8 Ratio cement, sand & first class brick ballast 0.268/0.285 cu mtr for 9.0 mtr PCC Pole & 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering.
40Cradle Guarding of 33 KV line at road crossing, 11 KV line crossing, canal/telephone line crossing by fixing Guarding Angle 65x65x6 mm, 3500 mm at double pole and 2600 mm long at single pole by stringing and sagging of 3 No. G.I.wire with lacing and tightening with mounting.
41Nozeling and grouting of stay at sectional pole and extra stay sets at angle locations (All the civil material will be arranged by the contractor )
42Earthing of Pole ST Pole by 6 SWG Wire by providing and fixing of 20 mm dia" earthing rod 2.550 Mtr. long as per norms complete in all respect.
43Stringing, sagging, binding and Jumpering of ACSR Dog conductor. 3 Phase of 33 KV Line including fixing, mounting of P.G.clamp suitable for Dog Conductor at sectional point.
44Digging of trench and laying of 3x300 sq. mm XLPE Cable underground Double Circuit in HDPE Pipe : Laying of Double circuit 3x300 sq .mm XLPE Cable (2x1530 Mtr.) in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required materials, as 1st class Bricks, Stone slabs and fine sand. Providing 150 mm fine sand cusion beneath, and 150 mm sand cusion above the cable. The cable shall be duly protected by Bricks, sand and stone slab. The inter axial spacing between two cables should be in between 0.25 to 0.40 M. After laying the cable in HDPE pipe refilling and ramming of the left out soil,closing the trench and leveling.
45Installation of 33 KV 3x300 sq. mm Outdoor End Terminationsfor 33 kV XLPE Cable
46Fixing of barbed wire on the pole above 2750 mm ground level. Barbed wirewrapped for a distance of 0.9 mtr. with apitch of 13.mm at a height.
47Fixing of Danger board of size 250x200x2 mm 3650 mm above ground level as per Respo norms. RESPO Drawing No-55
48Fixing of Number plate of size 250x200x2 mm 3650 mm above ground level as per Respo norms. RESPO Drawing No-55
49LineIsolator Structure Fabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 mtX 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with runner of isolator in proper allingment level and plumb. Plinths of the Isolator structure shall be properly finished with champering of edges.(All the material will be supplied by the Contractor like M.S Flat etc.)
50Installation of Line Isolators Assembling and installation of Line isolator on the Isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
51Laying of cable & HDPE Pipe Laying of Single circuit 33 KV 3x300 Sq mm XLPE cable and HDPE Pipe by drilling method below NHAI Road / Railway crossing. Twin cables be laid parallelly (2x760 Mtr) at the depth of 3 mtr from the under surface in HDPE pipe (200 mm. dia.) casing.
52NOC will be granted from Central/ state Electrical safety department.( Final settlement of the payment will be on the basis of Quotation of expenditure of proovided by the contractorin BOQ or costof expenditure provided by electrical saftey which is low).
53Permission of NHAI/PWD/RAILWAYetc. for road crossing..( Final settlement of the payment will be on the basis of Quotation of expenditure provided by the contractor in BOQ orcostof expenditure provided by NHAI Depaartment whichever is low.)
54permission of cutting and chopping of tree from forest deppt. ((.Final settlement of the payment will be on the basis of Quotation of expenditureprovided by the contractorin BOQ or Quotation of expenditure provided by FOREST department which is low))
55Restoring the road as it is before after completion of work
56Painting of poles Painting of poles with one coat of red oxide, two coats of enamel paint ISI mark.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail