Schedule Of Rates & Quantum Of Work For ( 1 ) Shifting Of 11 Kv Line Of New Stndard Public School Bagaha Salon ( 2 ) Shifting Of Lt Line Of Sri Masroor Ahamad Village Paggamber Pur Paschim Salon ( 3 ) G / S To M / S Sri Satish Chandra, Owna Sadara Salon Of Lmv-1 Categories ( 4 ) G / S To M / S Sri Sujeet Kumar Chaudhary Parshadepur Salon Of Lmv-2 Categories ( 5 ) G / S To Stw No. 210 S.G. Suchi Salon Of Lmv-8 Catories ( 6 ) G / S To Stw No. 208 S.G. Kachnawa Deeh, Salon Of Lmv-8 Catories, In The Geographical Area Of Edd-Salonraebareliunder Deposit Scheme, In Jurisdiction Of Edd-Salon Raebareli.- 1 CORTAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONGWITH LOADING UNLOADING AND PROPER STACKING:- 2 8.5 Mtr long PCC Pole. 3 11 Mtr long ST Pole. 4 16/25/63 KVA T/F,as required. 5 8.5 Mtr long PCC Pole. 01 Nos & Loose line material including ACSR/RABBIT/ABC /XLPE CABLE/ weasel Conductor, Pin Insulators, Disc Insulatos, Top Channel, Stay Set, Disc Fitting 45/70 KN (T&C), Stay Clamp, 11KV F Clamp, V type Cross Arm, Disc Insulators, Stay Wire, SS Base Angle, Earthing Rod, Holding Clamp, T-Off Channel, G.I. Wire 6 SWG, Dropper Channel, Holding Clamp, F Clmp, LT Shackel Insulators, PVC Armed Cable (2X4mm). Cable Box O/Dand other remaining items. 6 Loose line material including ACSR/RABBIT/ABC /XLPE CABLE/ weasel Conductor, Pin Insulators, Disc Insulatos, Top Channel, Stay Set, Disc Fitting 45/70 KN (T&C), Stay Clamp, 11KV F Clamp, V type Cross Arm, Disc Insulators, Stay Wire, SS Base Angle, Earthing Rod, Holding Clamp, T-Off Channel, G.I. Wire 6 SWG, Dropper Channel, Holding Clamp, F Clmp, LT Shackel Insulators, PVC Armed Cable (2X4mm). 3200 mtr. , S.S. Base Angle and other remaining items. 7 ERRECTION & LABOUR CHARGES:- 8 Dismantling of Scrape material including dragging and carriage from site to ESC Tripula Raebarell 9 Errection of PCC Pole including dragging with Fitting of all accessories as per RESPO Norms. 10 Grouting of PCC Pole with grouting materials including digging of Pole to pit side as per RESPO Norms. 11 Errection of ST Pole including dragging with Fitting of all accessories as per RESPO Norms. 12 Grouting of ST Pole with grouting materials including digging of Pole including fitting of all related accessories as per RESPO Norms. 13 Errection/Re-errection of double pole by PCC Pole, then grouting of Polewith grouting materials including fitting of all accessories items, as per RESPO Norms. 14 Mounting of 16/25 /63 KVA Transformer on Double Pole with fitting of all required accessories as per RESPO norms, as required. 15 work for Installtion/Fixing of 11 KVO/D Cable Box 16 Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms 17 Laying , stringing & sagging of HT LT Lineby DOG/AAAC/ ACSRweasal / RABBITconductor including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required. 18 Diging of XLPE Cableto Trunch 2*3 Feet 60 Mtr.deep for underground by XLPE Cable vide as per ISS including providing bricks, sand, stone slab the inter exel spacing bettween to cable shoulde be in beettween 0.25 m to 0.40 m as required at site as per RESPO Norms. 19 Laying , stringing & sagging of 3x185 mm sq. 11 KV XLPE Cable Main+Stand by Line overhead Double Cercuit Line (90MtrX2) 20 Earthing of Pole as per RESPO norms. 21 Earthing of T/F body & neutral as per RESPO norms. 22 Fabrication of Line materials like V type X-arm/Top Channel/T off Channel/M.S. Channel/ M.S. Angle/Gaurding Angle and other misc work, as required, 23 Work for Installation/fixing of M.S.T-Off Channel.(125X65X1300 mm), Material Provided by Contractor 24 Work for Installation/fixing of Stone Pad 300X300X75 ,Material Provided by Contractor 25 Work for tightening of Nuts & Bolt, Material Provided by Contractor 26 Work for Installation/fixing of Top Channel,Material Provided by Contractor 27 Work for Installation/fixing of DropperChannel 100x50x2028mm,Material Provided by Contractor 28 Work for Installation/fixing of Danger Boardand Painting Number Mark with Clamp,Material Provided by Contractor (6+6) 29 Work for Installation/fixing of Clamp with Nut & Bolts,Material Provided by Contractor 30 Work for fixing of G.I. Wire 6/8 swg,Material Provided by Contractor 31 Work for fixing of G.I. Pipe 6 inch Dia,Material Provided by Contractor 32 Work for Installation/fixing of PG Clamp, Material Provided by Contractor 33 Work for Installation/fixing of stay l Insulators, Material Provided by Contractor 34 Work for Installation/fixing of Shackel l Insulators, Material Provided by Contractor 35 Work for Installation/fixing of G.I. Barbed Wire, Material Provided by Contractor