Supply Of Materials For The Construction Of Godown At Patakanadoddi Mallat Gp Under Mgnreg Scheme - A77-Red Oxide, A76-Broken Granite Metal 10 Mm, A75-Broken Granite Metal 12.5 Mm, A74-Tools And Plants 2% On Material, A73-Hom Of Cutting And Grinding Machine, A72-Mechanic Class Ii / Mechanic Hmp Grade I / Eme Grade, A71-Add, A70-Hom Of Welding And Grinding Machine, A69-Corbon Electrodes, A68-Rms Gusset Plate, A67-Ms Pipes Of 80 Mm To 100 Mm Dia, Unit Cost As Per The Specification 1, A65-Formwork, Centering & Scaffolding For Chejjas, Canopy & Other Architectural Projections Of Minor Sections - 45%, A64-Formwork, Centering & Scaffolding For Beams & Lintels Of Building - 60%, A63-Formwork, Centering & Scaffolding For Columns & Piers - 70%, A62-Add Brush, Putty, Sand Paper At 2% On Cost Of Paint, Water Proofing Cement, A60-Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint, A59-Plastic Emulsion Paint, A58-Ms Sheet 20 Gauge, A57-Bottom Lock Nail, A56-Ms Handles, A55-Locking Arrangements, A54-Center Pully, A53-Ball Bearing For Rolling Shutters, A52-High Tension Coil, A51-Ms Side Shed Clamps, A50-Suspension Shaft, A49-Side Guides, A48-18 Gauge 75 Mm Ms Laths Of 2.8 M Length, A47-Add Brush At 1% On Cost Of Paint, A46-Enamel Metal Paint, A45-Add Handling, Loading And Unloading At 2% On Material, A44-Add Providing And Removing Scaffolding At 3% On Labor, A43-Painter Class I, Add Wire Brush Fine Steel Wool Putty Sand Paper At 3% Cost Of Painting, A41-Ready Mix Primer Paint ( Ready Mix Red Lead Paint ) , A40-Add Hom Of Welding And Grinding Machine 4% On Material, A39-Welder Grade I, A38-Fitter Class I, Mallat-1 Ms Flat, A36-M.S Rods, A35-Add Hom Of Welding And Grinding Machine 2% On Material, A34-Fabricator, A33-5.50 Mm Thick Plain Glass, A32-Chrominum Plated Screws, A31-Cleat Angles, A30-Alluminium Handles - 15 Mm, A29-Alluminium Tower Bolt - 20 Cm, A28-Pvc Edge Beading, A27-Rubber Beading For Shutters Beading, A26-Nylon Rollers, A25-Aluminium Window Frame Section 1.20 Mm Thick, A24-Binding Wire, A23-Tmt Bars Fe 500, A22-Add Sundries Charges At 2 % On Material, A21-Add Handling , Loading And Unloading At 1% On Material, A20-Casurina Poles 100 - 150 Mm, A19-Brick, A18-Add Watering Charges At 1 % On Labour, A17-Add Sundries Charges At 1 % On Labour, A16-Stone Chistler Class Ii, A15-Mason Class Ii ( With Tools ) , A14-Mason Class I ( With Tools ) , A13-Mixer ( Concrete Small Used In Culvert ) , A12-Boulders, A11-Bond Stone 20 X 20 X 45 Cm, A10-Size Stone 20 X 20 X 25 Cms, A9-Hom Of Vibrator 0.71 Days, A8-Plasticizer / Super Plasticizer, A7-Add Sundries Charges At 1 % On Material, A6-Add Watering Charges At 1 % On Material, A5-Mixer ( Concrete ) - 1 Cum Capacity, A4-Portland Cement, A3-Coarse Sand ( Zone Iii ) , A2-Broken Stone Aggregate 12 Mm To 10 Mm Size, A11-Broken Stone Aggregate 20 Mm Size