Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Ofmaterial, Design, Erection, Testing, Commissioning For Shiftig Of 3-Phase Lt Line Near Maszid At Sidhpur, Uesd, Hpsebl, Sidhpur Under Ed Dharamshahala. ( Seop-67/2023-24).. Submission Date for this Tender is 11-03-2024. Bags Supply Tenders in kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | 11 KV HT Line & Undergound 11 KV HTLine |
2 | 11 kV XLPE Cable [Size: (3x240mm²) {additional 1% wastage)] (double run) |
3 | 11 kV Cable Outdoor Termination Kit [Size: 3x240mm²] |
4 | RCC cable cover (2 feet long) |
5 | RCC cable cover (2 feet long) |
6 | Sand Bag (50 Kg) |
7 | Route and Joint indicating stone |
8 | Inspection Chamber |
9 | GI Pipe earthing 40 mm x 2.5/3 m "B" class |
10 | Pipe HDPE Size 110 mm |
11 | Flat GI Size 25x6 mm |
12 | Cleat HDPE for Cable Support |
13 | G.I. Pipe 110 mm (2.50m long) DIA "B" CLASS |
14 | Flat GI Size 50x6 mm |
15 | Channel MS Size 75x40 mm |
16 | Warning Tape (Printed PE UG utility protection) |
17 | ST Pole13 Mtr. Long. |
18 | RCC Muff of 2000 mm length |
19 | Poviding AAAC Conductor 7/3.81 mm2 {additional 3% wastage)] |
20 | X-arm:[CI(100x50x6mm), L:1270mm |
21 | AI(50x50x6 mm),L-750mm x 2 Nos. |
22 | Pole Top Bracket MSCI 100x50x6 mm-300 mm) |
23 | 11 kV Pin Insulator (porcelain BS 12 KV, 10 KN) |
24 | 11 kV Disc Insulator (porcelain BS 12 KV, 90 KN) |
25 | Stay set complete in all respect |
26 | Stay wire (7/3.15 mm @ 7 kg) |
27 | Eye hook for earth wire |
28 | Half Clamp |
29 | Full Clamp |
30 | Nut & bolt of various size(galvenised/coated)with flat and spring washer) |
31 | Poviding Red Oxide |
32 | Poviding Aluminium Paint |
33 | Civil Works for restoration of site after excavation near chowk and surrounding area complete in all respect |
34 | Transportation Charges |
35 | Dismantling charges of existing Poles and Conductor & Erection Charges for one 13 Mtr pole and 1 HT Stay set& 100 mtr AAAC 7/3.81 complete in all respect |
36 | Erection Charges for Underground HT Cable complete in all respect |
37 | 3-Phase LT Line |
38 | Prov. ST pole 9 Mtrs Long |
39 | Prov. RCC muffconcerete filling |
40 | Prov. LT AB Cable 3x120+16+70 {additional 1% wastage) |
41 | Prov. Angle Iron (75x75x6){Length-1.50 Mtrs+0.02 Mtrs} |
42 | " Shackle insulator (16 KN) |
43 | " D-Iron (U-Clamp) |
44 | " Earth Knob |
45 | " LT Stay Set |
46 | " Stay wire (7/3.15mm) (6.0Kg per stay set) |
47 | " Nuts & Bolts of Various sizes |
48 | " Red Oxide |
49 | " Aluminium Paint |
50 | " Egg Insulator(LT) |
51 | " Eye Hook |
52 | Civil Works & Site Developmentfor installation of Polescomplete in all respect |
53 | Transportation Charges |
54 | Erection Charges for one 9 Mtr pole and LT Stay set & LT AB Cablecomplete in all respect |
55 | DismantallingChargescomplete in all respect |
56 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail