|
| 1 | Smart 4mp IP Surveillance Camera with mounting brackets |
| 2 | ANPR Camera with Mounting Brackets |
| 3 | ITMS Camera with Mounting Brackets |
| 4 | Double Arm Pole 9 meter |
| 5 | Camera Pole with camera mounting brackets |
| 6 | Videowall with controller 55 INCH 3X3 |
| 7 | Surveillance Management Centre |
| 8 | IP Storage (NAS) |
| 9 | Hard Disk 8TB |
| 10 | UPS and Battery for camera |
| 11 | KEB power supply and Necessary items (Deposit + Meter + Meter box + Fuse + MCB + HDPE pipe + 2 core armed cable 30mtr + Digging + Excavation charges, HDD/ Mouling Charges, Road Cutting and Packing Charges,Civil work, 10X2 Cable) |
| 12 | Earthing (GI Pipe, Copper strip and copper cable, Salt, Charcoal, Excavation) for Command Control Room |
| 13 | Excavation and install of camera poles centering and Barbending with PCC concerte and Construction of brick structure for enclosure box and Installation of pole |
| 14 | Lightning Arrester |
| 15 | IP 65 Enclosure Box with exhaust fan |
| 16 | Agregate Switch 24 port |
| 17 | POE Switch 8+2 GBPS |
| 18 | Power Supply Board |
| 19 | ITMS SERVER |
| 20 | ANPR Video Analytics (Permanent License) |
| 21 | Base License Video Management Software (Permanente License) |
| 22 | License for Triple Riding |
| 23 | License for Without Helmet |
| 24 | License for Mobile Riding |
| 25 | License for Lane discipline |
| 26 | License for Not wearing Seat Belt |
| 27 | License for Number Plate recognition |
| 28 | License for wrong way |
| 29 | Traffic Enforcement Software (E-Challan Software) |
| 30 | IO Ports (Bulk) |
| 31 | Electrical Work(Bulk) |
| 32 | Network Work(Bulk) |
| 33 | LAN Cable |
| 34 | Power Cable 2 Core 2.5 Sq mm |
| 35 | RJ 45 (Bulk) |
| 36 | Conduit Pipes (Bulk) |
| 37 | Fiber Connectivity charges per camera upto TMC 4 MBPS for 2 years |
| 38 | Camera Installation Charges |
| 39 | Annual Comprehensive Maintenance Contract, after completion of initial Warrantee of period of 2years. Chargesper Annum for entire Tender Package for the 3rd year |
| 40 | Annual Comprehensive Maintenance Contract, after completion of initial Warrantee of period of 2years. Chargesper Annum for entire Tender Package for the 4th year |
| 41 | Annual Comprehensive Maintenance Contract, after completion of initial Warrantee of period of 2years. Chargesper Annum for entire Tender Package for the 5th year |