Indian Institute Of Technology-IITB has published Tender For 4 Years Comprehensive Amc For Operation And Maintenance Of 5 Nos. Central Ac Plant At Iit Madras For The Year 2024-28. Submission Date for this Tender is 27-03-2024. HVAC Tenders in Chennai Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 14-Mar-2024 | Date Extension Corrigendum | Date | 22-03-2024 |
2 | 21-Mar-2024 | Corrigendum-2 | Other | 22-03-2024 |
3 | 22-Mar-2024 | Corrigendum Date Extension | Date | 27-03-2024 |
Sl. No. | Item Description |
1 | PART-A-OPERATION CONTRACT OF THE CENTRAL PLANT |
2 | CENTRAL LIBRARY+SAC+CRC PLANT |
3 | Operationof AC plant of 4 x 110 TR air cooled chiller and allied equipments in IIT Madras campus with 3 BMS operators(1 in each shift for 3 shifts) as per the timing and other terms and conditions in enclosed specification vide annexure A |
4 | I year |
5 | II year |
6 | III year |
7 | IV year |
8 | BIOTECHNOLOGY-II PLANT |
9 | Operation contract of AC plant of 3 x 140 TR water cooled chiller and allied equipments in IIT Madras campus with 3 BMS operators( 1 in each shift for 3 shifts) as per the timing and other terms and conditions in enclosed specification vide annexure B. |
10 | I year |
11 | II year |
12 | III year |
13 | IV year |
14 | ACADEMIC COMPLEX-1 |
15 | Operation contract of AC plant of 2 x 300 TR water cooled chiller and 1 x 50 TR air cooled chiller and allied equipments in IIT Madras campus with 3 BMS operators( 1 in each shift for 3 shifts) as per the timing and other terms and conditions in enclosed specification vide annexure C |
16 | I year |
17 | II year |
18 | III year |
19 | IV year |
20 | ACADEMIC COMPLEX-2 |
21 | Operation contract of AC plant of 2 x 300 TR water cooled chiller and 2 x 120.0 TR air cooled chiller and allied equipments in IIT Madras campus with 3 BMS operators( 1 in each shift for 3 shifts) as per the timing and other terms and conditions in enclosed specification vide annexure D |
22 | I year |
23 | II year |
24 | III year |
25 | IV year |
26 | COMPUTER SCIENCE BLOCK & ESB-II |
27 | Operation contract of AC plant of 3 x 150 TR water cooled chiller and allied equipments in IIT Madras campus with 3 BMS operators( 1 in each shift for 3 shifts) as per the timing and other terms and conditions in enclosed specification vide annexure E |
28 | I year |
29 | II year |
30 | III year |
31 | IV year |
32 | IC SR & NCCRD BUILDING |
33 | Operation contract of AC plant of 2 x 50.0 TR aircooled chiller and allied equipments each at ICSR & NCCRD Building in IIT Madras campus with 3 BMS operators(1 in each shift for Day shift alone for 2 locations) as per the timing and other terms and conditions in enclosed specification vide annexure F |
34 | I year |
35 | II year |
36 | III year |
37 | IV year |
38 | PART-B-MAINTENANCE OF AIR COOLED AND WATER COOLED CHILLERS PLANTS |
39 | Comprehensive Annualmaintenance ( Routine & Preventive) and break down maintenance of high side & Low side of the Air Conditioning plant comprising of all the machinery & equipments installed in the building for Four years period as per the scope of work. |
40 | 4 x 110.0 TR AIRCOOLED CHILLER PLANT AT CENTRAL LIBRARY+SAC+CRC PLANT |
41 | AMC for 1st year |
42 | AMC for 2nd year |
43 | AMC for 3rd year |
44 | AMC for 4th year |
45 | Comprehensive Annualmaintenance ( Routine & Preventive) and break down maintenance of high side & Low side of the Air Conditioning plant comprising of all the machinery & equipments installed in the building for Four years period as per the scope of work. |
46 | 2 x 50.0 TR AIRCOOLED CHILLER PLANT EACH AT IC SR & NCCRD BUILDING |
47 | AMC for 1st year |
48 | AMC for 2nd year |
49 | AMC for 3rd year |
50 | AMC for 4th year |
51 | Comprehensive Annualmaintenance ( Routine & Preventive) and break down maintenance of high side & Low side of the Air Conditioning plant comprising of all the machinery & equipments installed in the building for Four years period as per the scope of work. |
52 | 3 x140 TR WATER COOLED CHILLER PLANT AT BIOTECHNOLOGY-II BUILDING |
53 | AMC for 1st year |
54 | AMC for 2nd year |
55 | AMC for 3rd year |
56 | AMC for 4th year |
57 | Comprehensive Annualmaintenance ( Routine & Preventive) and break down maintenance of high side & Low side of the Air Conditioning plant comprising of all the machinery & equipments installed in the building for Four years period as per the scope of work. |
58 | 2 x 300.0 TR WATER COOLED + 1 x 50.0 TR AIR COOLED CHILLER PLANT AT NEW ACADEMIC COMPLEX -I BUILDING |
59 | AMC for 1st year |
60 | AMC for 2nd year |
61 | AMC for 3rd year |
62 | AMC for 4th year |
63 | Comprehensive Annualmaintenance ( Routine & Preventive) and break down maintenance of high side & Low side of the Air Conditioning plant comprising of all the machinery & equipments installed in the building for Four years period as per the scope of work. |
64 | 2 x 300.0 TR WATER COOLED + 2 x 75.0TR AIR COOLED CHILLER PLANT AT NEW ACADEMIC COMPLEX -II BUILDING |
65 | AMC for 1st year |
66 | AMC for 2nd year |
67 | AMC for 3rd year |
68 | AMC for 4th year |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail