| 1 | Disconnecting and isolating the transformer from the network, draining out of transformer oil in drums, removal of accessories as conservator, breather, radiator, bushings etc |
| 2 | Opening of top cover (gasket) and taking out of core and winding of transformer by crane or winch (to be arranged by the concerned agency) |
| 3 | Cleaning of bushings of transformer withconcentrated Hydrochloric acid or ammonia whichever is applicable |
| 4 | Cleaning of transformer body including core & winding with hot transformer oil of suitable diaelectric strength to be supplied by agency (without causing damage to windings and insulation paper) |
| 5 | Descaling and cleaning of all ducts, conservator oil meter, valve, explosion vent |
| 6 | Cleaning of all marshalling box and tightening of all the connections |
| 7 | Painting of transformer with 2 coat polymer paint (both from outside & inside) |
| 8 | Replacement of complete gasket and corksheet of suitable thikness and type as peer sample |
| 9 | Putting of core & winding in the transformer with proper alignment by crane or winch (arrangement to be done by the concerned agency) |
| 10 | Filling of the transformer with transformer oil and connection of all accessories including conservator, breather, radiator, bushing etc and connection of transformer to the network |
| 11 | Onsite testing, commissioning, checking, charging and other incidental costs for 3MVA Transformer |
| 12 | Replacement of leaky corksheet of suitable size as per sample |
| 13 | Supply and providing of HT Studs of suitable size and shape as per sample with required insulator |
| 14 | Supply and providing of LT Studs of suitable size and shape as per sample with required insulator |
| 15 | Providng and fixing of Copper patti |
| 16 | Supply and providing and fixing of Rubber Bush as per sample |
| 17 | Replacement of defective Brass nuts & washers as per size for HT & LT side |
| 18 | Replacement of diaphgram of explosive vent |
| 19 | Providing and fixing of Drain Valve |
| 20 | Testing and charging of Transformer |
| 21 | Supervision and incidental overhead expenses @15% of estimated amount for 4 Distribution Transformer |
| 22 | Total impact of GST for the purpose of CTC |