Irrigation Department has published Tender For Boulder Pitching In Slope Of River Side At Bokta Barwar Bund From Km 7.825 To Km 9.300 On Right Bank Of River Rapti In District Gorakhpur. Submission Date for this Tender is 19-02-2024. Dam Work Tenders in gorakhpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in cutting for construction of Toe wallwith dresing upto profile including all lead, lift, cost of all material, labour, T&P etc complete as per direction of Engineer-in-charge. |
2 | Earth work in fillingon bund for making properslope with dresing to profile with cartage soil by power Transport including excavation, loadding, unloading, stacking, manual compaction, cost of all material, all lift shall be applicable labour, T&P etc complete as per direction of Engineer in-charge. |
3 | Supplying and laying of Mzp stone boulder (25 to 60)kg in mechanically woven double twisted Hexagonal shaped wire mesh gabion box/Crate of size (1.0x1.0x1.0) M., Mesh size (10x12)cm of 10 SWG G.I. wire in construction of Toe wall includingcost ofall Material, Carriage &Labour T&P etc.as per direction of engineer incharge. |
4 | Supplying and laying of 200 gsm Geo Textilesheet belowMzp. Stone boulder pitching with pegs including preparation of sub-grade withall cost of material, labour, carriage, T&P etc complete as per direction of engineer incharge. |
5 | Supplying and pitching ofMzp. Cut stone boulder(25 to 60)kg on slopeas per Drawing includingcost of all material, labour, carriage, T&P etc complete as per direction of engineer incharge. |
6 | Supplying and laying of O.B.B. filter material below rain shuits including cost ofall Material, Carriage &Labour T&P etc.as per direction of engineer incharge. |
7 | Supplying and laying P.C.C. 1:4:8 over O.B.B. filter material in rain shuit and brick work on top of bund including cost ofall Material, Carriage &Labour T&P etc.as per direction of engineer incharge. |
8 | 1st class brick work in 1:4 cement mortar including all cost of materials, labour, T&P etc complete as per direction of Engineer in-charge. |
9 | Cement plasterin 1:4 C.M. on brick work including all cost of materials, labour, T&P etc complete as per direction of Engineer in-charge. |
10 | Ist class brick on edge pitching (Dry) on top of bund/shankwithprepration of sub grade and filling joints from local sandincluding all cost of materials, labour, carriage, T&P etc. complete as per direction of Engineer-in-charge. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail