}

Tender For Fixing Of Rate Contract For Maintenance/Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-I Jpdcl Parade Jammu For The Financial Year 2024-25, jammu-Jammu And Kashmir

Power Development Department has published Tender For Fixing Of Rate Contract For Maintenance/Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-I Jpdcl Parade Jammu For The Financial Year 2024-25. Submission Date for this Tender is 21-02-2024. Bolts Tenders in jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

41927543
Tender For Fixing Of Rate Contract For Maintenance/Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-I Jpdcl Parade Jammu For The Financial Year 2024-25
Open Tender
Indian
Jammu And Kashmir
jammu
21-02-2024

Tender Details

Fixing Of Rate Contract For Maintenance / Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-I Jpdcl Parade Jammu For The Financial Year 2024-25- 1 Fixing Of Rate Contract For Maintainance / Emergent Works Of Distribution Network In The Jurisdiction Of Electric Division-Ijpdcl Parade Jammu. For The Financial Year 2024-25. 2 Erection Ofpcc 8 Mtr Pole 3 Erection Ofpcc 9 Mtr Pole 4 Erection Ofpcc 11 Mtr Pole 5 Erection Ofst 8 Mtr Pole 6 Erection Ofst 9 Mtr Pole 7 Erection Ofst 11 Mtr Pole 8 Erection Ofst 13 Mtr Pole 9 Dismantling Of Pcc Pole 8 Mtr Long 10 Dismantling Of Pcc Pole 9 Mtr Long 11 Dismantling Of Pcc Pole 11 Mtr Long 12 Dismantling Ofst Pole 8 Mtr Long 13 Dismantling Ofst Pole 9 Mtr Long 14 Dismantling Of St Pole 11 Mtr Long 15 Dismantling Ofst Pole 13 Mtr Long 16 Unloading Of Pcc 8 Mtr Pole 17 Unloading Of Pcc 9 Mtr Pole 18 Unloading Of Pcc 11 Mtr Pole 19 Unloading Of St 8 Mtr Pole 20 Unloading Of St 9 Mtr Pole 21 Unloading Of St 11 Mtr Pole 22 Unloading Of St 13 Mtr Pole 23 Loading Of Pcc 8 Mtr Pole 24 Loading Of Pcc 9 Mtr Pole 25 Loading Of Pcc 11 Mtr Pole 26 Loading Of St 8 Mtr Pole 27 Loading Of St 9 Mtr Pole 28 Loading Of St 11 Mtr Pole 29 Loading Of St 13 Mtr Pole 30 Average Carriage Of Pcc 8 Mtr Pole Upto 100 Mtr 31 Average Carriage Of Pcc 8 Mtr Pole Upto 100 - 200 Mtr 32 Average Carriage Of Pcc 9 Mtr Pole Upto 100 Mtr 33 Average Carriage Of Pcc 9 Mtr Pole Upto 100 - 200 Mtr 34 Average Carriage Of Pcc 11 Mtr Pole Upto 100 Mtr 35 Average Carriage Of Pcc 11 Mtr Pole Upto 100 - 200 Mtr 36 Average Carriage Of St 8 Mtr Pole Upto 100 Mtr 37 Average Carriage Of St 8 Mtr Pole Upto 100 - 200 Mtr 38 Average Carriage Of St 9 Mtr Pole Upto 100 Mtr 39 Average Carriage Of St 9 Mtr Pole Upto 100 - 200 Mtr 40 Average Carriage Of St 11 Mtr Pole Upto 100 Mtr 41 Average Carriage Of St 11 Mtr Pole Upto 100 - 200 Mtr 42 Average Carriage Of St 13 Mtr Pole Upto 100Mtr 43 Average Carriage Of St 13 Mtr Pole Upto 100 - 200 Mtr 44 Installation Of Link Set 45 Installation Of Do Set 46 Installation Of Hg Set 47 Installation Of Go Set 48 Installation Of La Set 49 Average Carriage Of 25 Kva Upto 100 Mtr 50 Average Carriage Of 63 Kva Upto 100 Mtr 51 Average Carriage Of 100 Kva Upto 100 Mtr 52 Average Carriage Of 25 Kva 100 - 200 Mtr 53 Average Carriage Of 63 Kva 100 - 200 Mtr 54 Average Carriage Of 100 Kva 100 - 200 Mtr 55 Average Carriage Of 250 Kvaupto 100 Mtr 56 Average Carriage Of 300 Kvaupto 100 Mtr 57 Average Carriage Of 400 Kvaupto 100 Mtr 58 Average Carriage Of 500 Kvaupto 100 Mtr 59 Average Carriage Of 630 Kvaupto 100 Mtr 60 Average Carriage Of 250 Kva 100 - 200 Mtr 61 Average Carriage Of 300 Kva 100 - 200 Mtr 62 Average Carriage Of 400 Kva 100 - 200 Mtr 63 Average Carriage Of 500 Kva 100 - 200 Mtr 64 Average Carriage Of 630 Kva 100 - 200 Mtr 65 Loading Of 25 Kva Transformer 66 Loading Of 63 Kva Transformer 67 Loading Of 100 Kva Transformer 68 Loading Of 250 Kva Transformer 69 Loading Of 300 Kva Transformer 70 Loading Of 400 Kva Transformer 71 Loading Of 500 Kva Transformer 72 Loading Of 630 Kva Transformer 73 Unloading Of 25 Kva Transformer 74 Unloading Of 63 Kva Transformer 75 Unloading Of 100 Kva Transformer 76 Unloading Of 250 Kva Transformer 77 Unloading Of 300 Kva Transformer 78 Unloading Of 400 Kva Transformer 79 Unloading Of 500 Kva Transformer 80 Unloading Of 630 Kva Transformer 81 Mounting Of 25Kva Transformer 82 Mounting Of 63Kva Transformer 83 Mounting Of 100Kva Transformer 84 Mounting Of 250Kva Transformer 85 Mounting Of 300Kva Transformer 86 Mounting Of 400 Kva Transformer 87 Mounting Of 500 Kva Transformer 88 Mounting Of 630 Kva Transformer 89 Erection Of Guys In Ht Line 90 Erection Of Guys In Lt Line 91 Earthing Of Substation Complete ( Poles, Transformer, Ct / Pt, La ) 92 Dismantling Of Link Set 93 Dismantling Of Do Set 94 Dismantling Of G O Set 95 Dismantling Ofhg Set 96 Dismantling Of La Set 97 Dismantling Of Go Set 98 Erection Of Jumper Setht Side 99 Erection Of Jumper Set Lt Side 100 Dismantling Of Jumper Setht Side 101 Dismantling Of Jumper Set Lt Side 102 Dismounting Of 25 Kva Transformer 103 Dismounting Of 63Kva Transformer 104 Dismounting Of 100Kva Transformer 105 Dismounting Of 250Kva Transformer 106 Dismounting Of 300Kva Transformer 107 Dismounting Of 400Kva Transformer 108 Dismounting Of 500Kva Transformer 109 Dismounting Of 630Kva Transformer 110 Erection Of Acsrsquirel Conductor 111 Erection Of Acsrweasel Conductor 112 Erection Of Acsrrabbit Conductor 113 Erection Of Acsrdog Conductor 114 Dismentling Of Acsrsquirrel Conductor 115 Dismentling Of Acsrweasel Conductor 116 Dismentling Of Acsrrabbit Conductor 117 Dismentling Of Acsrdog Conductor 118 Tightening Of Loose Conductor Squirrel / Weasel 119 Tightening Of Loose Conductor Rabbit / Dog 120 Route Clearance For Making Path For Corridor Of 5 Mtr. / Km 121 Cement Bottoming Of Pcc / St Poles Of All Sizes ( Material For Cement Bottoming Is To Be Provided By Contractor ) 122 Fixing Of Lt Circuit Component Of Substation ( Lt Cables, Thimbles, Busbar, Shackle Insulators ) With Fuse Set / Mccbwith Box 123 Dismantling Of Lt Circuit Component Of Substation ( Lt Cables, Thimbles, Busbar, Shackle Insulators ) With Fuse Set / Mccbwith Box 124 Branch Cutting 125 Unloading T & Pitems I.Eline Materials Substations / Ht / Lt Lines 126 Loading T & Pitems I.Eline Materials Substations / Ht / Lt Lines 127 Average Carriage Oft & Pitems I.Eline Materials Substations / Ht / Lt Linesupto 100 Mtr 128 Average Carriage Of T & Pitems I.Eline Materials Substations / Ht / Lt Lines 100 - 200 Mtr 129 Survey / Route Alignment 130 Drilling Of Holes / Each 131 Fixing / Installation Of 11 Kv Disc Insulators With Fittings 132 Dismentling Of 11 Kv Disc Insulators With Fittings 133 Fixing Of U-Clamps And Shackle Insulators 134 Dismentling Of U-Clamps And Shackle Insulators 135 Fixing Of 11 Kv Pin Insulators With Pins 136 Dismentling Of 11 Kv Pin Insulators With Pins 137 Fixing Of Top Clamps For Pin Insulators 138 Dismentling Fixing Of Top Clamps For Pin Insulators 139 Fixing Of Braces 140 Dismentling Fixing Of Braces 141 Fixing Of Danger Plates 142 Dismantling Of Danger Plates 143 Fixing Of Anti Climbing Devicesplates 144 Dismentling Fixing Of Anti Climbing Devicesplates 145 Painting Of Steel Tubular Poles Including Cross Arms Clamps Etc. ( Upto 9 Mtr. ) 146 Painting Of Steel Tubular Poles Including Cross Arms Clamps Etc. ( Above 9 Mtr. ) 147 Painting Of Cross Arms And Clamps Of Pcc / Wooden Poles. 148 Providing Of Earthing ( Spiral / Pipe / Rod Type ) Including Fixing To The Pole And Cross Arm Etc. 149 Fixing Of Spacers For Lv Lines ( For 5 Wire System ) 150 Fixing Of Spacers For Lv Lines ( For 4 Wire System ) 151 Fixing Of Spacers For Lv Lines ( For 3 Wire System ) 152 Fixing Of Pre Fabricated Bracket And Cross Arm Bed For Placement Of Transformer ( For Transformers Upto Includiung 250 Kva ) 153 Fixing Ofms Channels 4.5 / 3 Feet Long Along With Braces 154 Fixing Ofm S Angle Iron 9 Feet Long Crossarm 155 Fixing Ofms Angle Iron 5 / 4.5 / 3 Feet Long Crossarm 156 Unloading Of Ct / Pt Unit 157 Average Carriage Of Ct / Pt Unit Upto 100 Mtr 158 Average Carriage Of Ct / Pt Upto 100 - 200 Mtr 159 Erection Of Ct / Pt Unit Along With Trivector Meter 160 Erection Of Ctpt Unit 161 Testing And Commissioning Of Ct / Pt Unit 162 Fixing Of Suspension / Anchoring Clamps 163 Laying Of Ht Ab Cable 35 Mmsq 164 Laying Of Ht Ab Cable 50 Mmsq 165 Laying Of Ht Ab Cable 70 Mmsq 166 Laying Of Ht Ab Cable 95 Mmsq 167 Laying Of Ht Ab Cable 120 Mmsq 168 Laying Of Ht Ab Cable 185 Mmsq 169 Laying Of Ht Ab Cable 300 Mmsq 170 Laying Of Ht Ab Cable 400 Mmsq 171 Laying Of Ht Xlpe Cable 35 Mmsq 172 Laying Of Ht Xlpe Cable 50 Mmsq 173 Laying Of Ht Xlpe Cable 70 Mmsq 174 Laying Of Ht Xlpe Cable 95 Mmsq 175 Laying Of Ht Xlpe Cable 120 Mmsq 176 Laying Of Ht Xlpe Cable 185Mmsq 177 Laying Of Ht Xlpe Cable 300 Mmsq 178 Laying Of Ht Xlpe Cable 400 Mmsq 179 Laying Of Lt Ab Cable 35 Mmsq 180 Laying Of Lt Ab Cable 50 Mmsq 181 Laying Oflt Ab Cable 70 Mmsq 182 Laying Oflt Ab Cable 95 Mmsq 183 Laying Oflt Ab Cable 120 Mmsq 184 Laying Of Lt Ab Cable 185 Mmsq 185 Laying Of Lt Ab Cable 300 Mmsq 186 Laying Of Lt Ab Cable 400 Mmsq 187 Laying Of Lt Xlpe Cable 35 Mmsq 188 Laying Of Lt Xlpe Cable 50 Mmsq 189 Laying Oflt Xlpe Cable 70 Mmsq 190 Laying Oflt Xlpe Cable 95 Mmsq 191 Laying Oflt Xlpe Cable 120 Mmsq 192 Laying Of Lt Xlpe Cable 185 Mmsq 193 Laying Of Lt Xlpe Cable 300 Mmsq 194 Laying Of Lt Xlpe Cable 400 Mmsq 195 Dismantling Of Ht Ab Cable 35 Mmsq 196 Dismantling Of Ht Ab Cable 50 Mmsq 197 Dismantling Of Ht Ab Cable 70 Mmsq 198 Dismantling Of Ht Ab Cable 95 Mmsq 199 Dismantling Of Ht Ab Cable 120 Mmsq 200 Dismantling Of Ht Ab Cable 185Mmsq 201 Dismantling Of Ht Ab Cable 300 Mmsq 202 Dismantling Of Ht Ab Cable 400 Mmsq 203 Dismantling Of Ht Xlpe Cable 35 Mmsq 204 Dismantling Of Ht Xlpe Cable 50 Mmsq 205 Dismantling Of Ht Xlpe Cable 70 Mmsq 206 Dismantling Of Ht Xlpe Cable 95 Mmsq 207 Dismantling Of Ht Xlpe Cable 120 Mmsq 208 Dismantling Of Ht Xlpe Cable 185Mmsq 209 Dismantling Of Ht Xlpe Cable 300 Mmsq 210 Dismantling Of Ht Xlpe Cable 400 Mmsq 211 Dismantling Of Lt Ab Cable 35 Mmsq 212 Dismantling Of Lt Ab Cable 50 Mmsq 213 Dismantling Oflt Ab / Cable 70 Mmsq 214 Dismantling Oflt Ab Cable 95 Mmsq 215 Dismantling Oflt Ab Cable 120 Mmsq 216 Dismantling Of Lt Ab Cable 185 Mmsq 217 Dismantling Of Lt Ab Cable 300 Mmsq 218 Dismantling Of Lt Ab Cable 400 Mmsq 219 Dismantling Of Lt Xlpe Cable 35 Mmsq 220 Dismantling Of Lt Xlpe Cable 50 Mmsq 221 Dismantling Oflt Xlpe Cable 70 Mmsq 222 Dismantling Oflt Xlpe Cable 95 Mmsq 223 Dismantling Oflt Xlpe Cable 120 Mmsq 224 Dismantling Of Lt Xlpe Cable 185 Mmsq 225 Dismantling Of Lt Xlpe Cable 300 Mmsq 226 Dismantling Of Lt Xlpe Cable 400 Mmsq 227 Fixing Of Heat Shrinkable Outdoor Kit For Ab / Xlpe Cables Ofht Lines 228 Fixing Of Straight Through Cable Jointing Kit For Ab / Xlpe Cables Oflt Lines 229 Dismantling Of Pin Insulators 230 Dismantling Ofms Channels 4.5 / 3 Feet Long Along With Braces 231 Dismantling Ofm S Angle Iron 9 Feet Long 232 Dismantlingofms Angle Iron 5 / 4.5 / 3 Feet Long 233 Construction Of Cemented Platform ( 8X8x6 Feet ) For 630 / 400 Kva Substation Along With Mesh Fencing Of 6 Feet Height ( If Material To Be Provided By Department For This Item ) 234 Construction Of Cemented Platform ( 8X8x6 Feet ) For 630 / 400 Kva Substation Along With Mesh Fencing Of 6 Feet Height ( If Material To Be Provided By Contractor For This Item ) 235 Fixing Of Ipc 120 / 50Mm 236 Service Connection ( Domestic / Commercial ) 237 Laying Of Lt Pvc Single Core Cable 95 Mmsq 238 Laying Of Lt Pvc Single Core Cable 185 Mmsq 239 Laying Of Lt Pvc Single Core Cable 300 Mmsq 240 Laying Of Lt Pvc Single Core Cable 400 Mmsq 241 Laying Of Lt Pvc Single Core Cable 630 Mmsq 242 Fixing Of Al. Thimbles Of Different Sizes 95 Mmsq 243 Fixing Of Al. Thimbles Of Different Sizes 185 Mmsq 244 Fixing Of Al. Thimbles Of Different Sizes 300 Mmsq 245 Fixing Of Al. Thimbles Of Different Sizes 400 Mmsq 246 Fixing Of Al. Thimbles Of Different Sizes 630 Mmsq 247 Stone Pad ( 300 Mmx 300 Mm X 75 Mm ) 248 Fixing Of Aluminium Jointing Sleeves 249 Fixing Of Suspension / Tension Clamp With Eye Hook 250 Fixing Of Wedge Connectors / Pg Clamps 251 Fixing Of Gi Barbed Wire For Anti Climbing 252 Sundry Items Like Aluminium Lugs, Jumpers, Binding , Tape. 253 Fixing Of Lt Distribution Box For 63 / 100 Kva Dtr With Mccb For Incomer & SfuS For Outgoing Circuits 254 Fixing Of Lt Distribution Box For 200 / 250 / 300 / 400 Kva Dtr With Mccb For Incomer & SfuS For Outgoing Circuits 255 Laying Of 3 And A Half Corepvc 95 Mmsqlt Xlpe Cable / Ab Cable 256 Fixing Of Lt Distribution Box For 500 / 630 Kva Dtr With Mccb For Incomer & SfuS For Outgoing Circuits 257 Fixing Of Nuts & Bolts 258 Fixing Of 32 / 63 Amps Tpn Switch Disconnector Fuse Unit

Key Value

Document Fees
INR 1000 /-
EMD
INR 30000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail