Department Of Tourism has published Annual Maintenance Contract (Amc) Of Split Acs And Hvac System At Skicc.. Submission Date for this Tender is 31-01-2024. HVAC Tenders in srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | AMC of complete HVAC System and 29 no ofSplit Acesinstalled for central Air-Conditioning of interior of building of SKICC comprising of the following equipment. (The Job is excluding spares amd consumables). The Job includes preventive as well as breakdown maintenance and repairs of all mechanical, electrical/electronic equipment installed for the respective AC system. a) Two number of chiller plants (Make: KIRLOSKAR Model KWS 230.22) each comprising of two scew compressors. b) Two number of electric boiler plants of 250KW each. c) Water Circulating Pipe Lines including Gate/Shutoff Valves including descaling of water pipes at least once during contract period. d) Air Handling Units of different capacities 14 Nos and two Cooling Towers. e). All water circulating and cooling pumps and motors. f).29 Nos. of SplitAir Conditioners of different capacities installed at various site in SKICC having capacities 1 ton 2.0 ton. |
2 | Overhauling of Electric Boiler (includes cleaning/descaling of water storage, immersion heaters, arresting of leakages if any, repairs of electric circuit including internal cable connections, bus bars etc. and other allied Jobs as may arise during the process of overhauling. the Job includes material for arresting leakages, descaling chemical, internal damaged cables with thimbles, busbars, nut bolts, etc.. |
3 | Overhauling of one screw compressor of Chiller Plants (the Job includes dismantling of screw compressor with motor from the chiller plant for maintenance andrepairing of compressor and motor, draining of oil and gas and re installing compressor and motor back to its place on chiller plant after repairs and maintenance Job and commissioningthe compressor back. Spares excluded. |
4 | Scaffolding/fabrication of work bench for the above Job. |
5 | Nitrogen testing/flushing, creating of vacuum for gas charging for each compressor |
6 | Refrigerant Gas Charging-R22 |
7 | P/F of bearing set for screw compressor |
8 | Rubbing and Polishing of slide valves of screw compressor |
9 | Rubbing , Polishing and alignment of male/female screw ofscrew compressor |
10 | P/F of O-ring and gasket of screw compressor |
11 | MAINTENANCE/Repairs of pumps of various capacities (Complete Job including spares including lubrications, seals, impellers, bearings ). |
12 | 25HP |
13 | 20Hp |
14 | 15HP |
15 | 12.5/10 |
16 | 7.5HP |
17 | 5 HP |
18 | 3HP |
19 | Rewinding/repairs of 3phase induction motors. (Copper winding) with buy back of scrap copper. The Job includes dismantling, to and fro carriage from workshop and refitting of motor as well. |
20 | 25 HP 3 Phase |
21 | 20 HP 3 Phase |
22 | 15 HP 3 Phase |
23 | 12 HP 3 Phase |
24 | 10 HP 3 Phase |
25 | 7.5 HP 3 Phase |
26 | 5 HP 3 Phase |
27 | 3 HP 3 Phase |
28 | Main motor of screw compressor |
29 | Providing and fixing of 3 phase immersion heater as per sample |
30 | Providing and fixing oftemperature Controller for Boiler, |
31 | Providing and fixing of AHU filters as per sample |
32 | Providing and fixing of Pressure transducer |
33 | Providing and Fixing of Temperature Sensor |
34 | Providing and fixing of pressure switch |
35 | Wet Service for each split of Air Conditioners of different capacities installed at various site in SKICC having capacities 1 ton 2.0 ton. |
36 | P/filling of refrigerant gas for split ACs of different make 1.5-2.0 TON Acs |
37 | SITC of 1.5-2.0 TON compressor make Diaken /LG /Lloyd excluding gas filling |
38 | SITC ofmain PCB for indoor /out door units of 1.0-2.0 TON AC make Diaken /LG /Lloyd |
39 | Repairing of main PCB forindoor /out door units of 1.0-2.0 TON AC make Diaken /LG /Lloyd |
40 | P/F of swing motor for1.0-2.0 TON AC make Diaken /LG /Lloyd |
41 | P/filling of fan motor for1.0-2.0 TON AC make Diaken /LG /Lloyd |
42 | P/F of magnetic contactors for1.0-2.0 TON AC make Diaken /LG /Lloyd |
43 | P/F of Transformer for outdoor unit |
44 | P/F of control copper wire 4 core 2.5 sqmm |
45 | P/F of copper piping as per required size . |
46 | Insulation of copper pipes. |
47 | SITC of voltage stabilizer4 kiva for1.0-2.0 TON AC make V guard/Microtek/liv guard |
48 | Repairing of voltage stabilizers of various capacities for 1.0 to 2. ton AC |
49 | Providing of Remote for split Aces. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail