|
| 1 | PART-A |
| 2 | Providing ,supplying ,installing & commissioning of NVR 20 CHANNEL 1 Year warranty For Patlipada Make: CP+, Hikvision, Dahua |
| 3 | Providing ,supplying ,installing & commissioning ofNVR 8 CHANNEL 1 Year warranty For Anjur bridge areaMake: CP+, Hikvision, Dahua |
| 4 | Providing ,supplying ,installing & commissioning of Bullet CAMERA 6mm 2mp Night Vision 1 Year warranty range: minimum 30 meter |
| 5 | SWITCH |
| 6 | Providing ,supplying ,installing & commissioning of POESWITCH:-16 PORT (Secury / Trueview) |
| 7 | Providing ,supplying ,installing & commissioning of POESWITCH:-08 PORT (Secury / Trueview) |
| 8 | Providing ,supplying ,installing & commissioning of POESWITCH:-04 PORT (Secury / Trueview) |
| 9 | Supplying and installing cat-6 cable with rodent proof and anti termite jacket suitable for networking as per specification No. WG-COC/NCFor Patlipada.Make: D-link |
| 10 | Supplying and installing cat-6 cable with rodent proof and anti termite jacket suitable for networking as per specification No. WG-COC/NCFor Anjur bridge areaMake: D-link |
| 11 | Providing ,supplying ,installing & commissioning ofSeagate 6 TB HDD 3 Year warranty (Storage: 30 days) For Patlipada |
| 12 | Providing ,supplying ,installing & commissioning ofSeagate 4 TB HDD 3 Year warranty(Storage: 30 days) For Anjur bridge area |
| 13 | Providing ,supplying ,installing & commissioning of4U RACK |
| 14 | Providing ,supplying ,installing & commissioning ofRJ 45CONNECTOR with cover |
| 15 | Providing ,supplying ,installing & commissioning ofHOUSING WITH STAND |
| 16 | Providing ,supplying ,installing & commissioning ofTV 32 INCH (Secury / Trueview) 1Year Warranty (Android TV) For PatlipadaMake: VW, TCL, Realme, Kodak, Sansui. |
| 17 | Providing ,supplying ,installing & commissioning of TV 21 INCH (Secury / Trueview) 1Year Warranty (Android TV) For Anjur bridge area.Make: VW, TCL, Realme, Kodak, Sansui. |
| 18 | Providing ,supplying ,installing & commissioning ofMetal Angle with Plate |
| 19 | Providing ,supplying ,installing & commissioning of PVC BOX |
| 20 | PART-B |
| 21 | Operation and Maintenance Charges of the whole water supply scheme on SCADA and generation of daily report of water quality parameters and electrical parameters with specific consumption in kWh/ml . The report shall be mailed daily to the head quarters for monitoring purpose. |
| 22 | During First year (Free) |
| 23 | During Second year (3% of total cost) |
| 24 | During Third year ( 5% of total cost) |
| 25 | During Fourth year ( 7% of total cost) |
| 26 | During Fifth year ( 7% of total cost) |
| 27 | During Sixth year ( 7% of total cost) |