}

Tender For Manual Rescue And Operation Rescue Of Swimming Pool, Dg Sets, Pump House, Ac Plants, Maintenance Of Ac Plants, Cooling Appliance At Mo (Mb) Ghatkopar And Repair / Replacement Of Summer Appliances And Fire Fighting System At Nchc Powai And, ghatkopar-Maharashtra

Military Engineer Services-MES has published Tender For Manual Rescue And Operation Rescue Of Swimming Pool, Dg Sets, Pump House, Ac Plants, Maintenance Of Ac Plants, Cooling Appliance At Mo (Mb) Ghatkopar And Repair / Replacement Of Summer Appliances And Fire Fighting System At Nchc Powai And. Submission Date for this Tender is 13-02-2024. Fire Fighting Consumable Tenders in ghatkopar Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

41670139
Tender For Manual Rescue And Operation Rescue Of Swimming Pool, Dg Sets, Pump House, Ac Plants, Maintenance Of Ac Plants, Cooling Appliance At Mo (Mb) Ghatkopar And Repair / Replacement Of Summer Appliances And Fire Fighting System At Nchc Powai And
Open Tender
Indian
Maharashtra
ghatkopar
13-02-2024

Tender Details

Manual Rescue And Operation Rescue Of Swimming Pool, Dg Sets, Pump House, Ac Plants, Maintenance Of Ac Plants, Cooling Appliance At Mo ( Mb ) Ghatkopar And Repair / Replacement Of Summer Appliances And Fire Fighting System At Nchc Powai And Ghatkopar Manual Rescue And Operation Rescue Of Swimming Pool, Dg Sets, Pump House, Ac Plants, Maintenance Of Ac Plants, Cooling Appliance At Mo ( Mb ) Ghatkopar And Repair / Replacement Of Summer Appliances And Fire Fighting System At Nchc Powai And Ghatkopar

Key Value

Document Fees
INR 1000 /-
EMD
INR 208100.0 /-
Tender Value
INR 1.33 Crore /-

BOQ Items

Name of Work: MANUAL RESCUE AND OPERATION RESCUE OF SWIMMING POOL, DG SETS, PUMP HOUSE, AC PLANTS & MAINTENANCE OF AC PLANTS & COOLING APPLIANCE AT MO (MB) GHATKOPAR AND REPAIR / REPLACEMENT OF SUMMER APPLIANCES AND FIRE FIGHTING SYSTEM AT NCHC POWAI AND GHATKOPAR UNDER GE (NW) BHANDUP
Sl. No. Item Description
1Mannual rescue & operation rescue and Maintenance of the following items in three shifts per day (each shift 08 hrs continuous duration) operated by one operator in each shift including periodical maintenance/repairs (daily check and cleaning, monthly, quarterly, half yearly maintenance) with all consumables parts (except for major assembly/items/jobs given in sch "A" part-II) of Central AC plant (a) Central AC plant of capacity 3 x 40 ton (DX system) comprising of compressors, motor, condensers, Chillers, AHU, refrigerant, piping, controls, pumps, water supply pipes and controls cooling towers, eletrical panels, instruments starters, strip heaters and repairs/replacement of control cabling/wiring including for the smooth and effiecient of AC plant to achieve desired inside conditions through out the given period. (Location SSK 47 MO MB Ghatkopar) (i) First Shift - 0600 hrs to 1400hrs (ii) Second Shift - 1400 hrs to 2200 hrs (iii) Third Shift - 2200 hrs to 0600 hrs
2Manual rescue & operation rescue and Maintenance of central AC plant of capacity 3 x 50 ton (2 x 50 TR in running and 1 x 50 TR in standby) in three shifts/day (including Sundays and holidays) per day each shift of 8 hrsoperated by one operator in each shift of central AC plantcomprising of compressors, motors, condensors, chillers,AHU, refrigerant, piping, controls, pumps, water supply pipes and controls cooling towers, eletrical panels, instruments starters, strip heaters complete all as specified and directed. Make: Voltas, Location Heavy Lift Shed (Vikramaditya)at MO (MB) Ghatkopar) (i) First Shift - 0600 hrs to 1400hrs (ii) Second Shift - 1400 hrs to 2200 hrs (iii) Third Shift - 2200 hrs to 0600 hrs
3Manual rescue & operation rescueand Maintenance of package type AC plant of capacity 3 x 11 ton (2 x 11TR in running and 1 x 11 TR in standby) in One shifts/day (Excluding sundays/Holidays)each shift of 8 hrsoperated by one operator from 0900 hrs to 0500 hrs each shift of central AC plantcomprising of compressors, motors, condensors, chillers,AHU, refrigerant, piping, controls, pumps, water supply pipes and controls cooling towers, eletrical panels, instruments starters, strip heaters complete all as specified and directed. Make: Voltas, Location :SPDC-08 (i)Shift - 0900 hrs to 1700hrs
4Material only three pole contractor with 2 NO + 2NC Auxilary contacts for AC circuits type ML-2 standard coil voltage 415/440 volts complete all as specified and directed. Make: L&T/Siemens/ABB
5-Ditto- all as per srl item No 4.00 here in before but ML 1.5 complete all as specified and directed. Make: L&T/Siemens/ABB
6Supply only bimetal overload relay type ML range 20-32A, 415Voltsdirectly operated complete all as specified and directed. Make: L&T/Siemens/ABB
7Supply only shaft seal assembly with complete accessories for SMC 4-65 to SMC-8-65 complete all as specified and directed. Make ACCEL or equivalent as approved by GE
8Taking down existing supply and return air diffusers of any sizes cleaning with blowers and water painting with two coats of synthetic enamel paint and refixing in positions complete all as specified and directed.
9Material for replacement of old safety valves of 1/2" 300 PSI operating pressure complete all as specified and directed. Make Brasomatic or equivalent as approved by GE
10Supply only pressure gauge 0 to 300 LBS/SQ inch complete all as specified and directed. Make Feibig/Adarsh
11Supply only bimetal overload relay type ML 1.5 range 10-15A, 415Voltsdirectly operated complete all as specified and directed.
12Supply only of gun metal,globe or gate valves,with iron wheel head,screwed both ends for iron pipes of 25 mm dia as specified and directed.
13Supply only of gun metal,globe or gate valves,with iron wheel head,screwed both ends for iron pipes of 50 mm dia as specified and directed.
14TakingdownAC Plantcompressor reciprocating open type Model No. 5H.40/60 Voltas Make by dismantling complete assembly for overhauling includingreplacement of unserviceable minor spares (rate included) including machining of crank shaft bearingpolishing, replacing of gasketspackingreassembly and rechargingof pumpeddown including replacement of major spares parts, refrigerant & topping up if required to maintain the required standingcharged pressureof compressor oil completetesting for smooth functioning etc. complete all as specified and directed.Location atS.S K47 ,Vikramaditya / Ghatkopar Note: Compressor major spare parts, compressor oil and refrigerantfor topping up will be paid separately under relevant items supply only.However labour element for replacing these major spares shall be deemed to be included in quoted rates. Make:Voltas
15Supply only following spares parts for compressor all as specified and directed
16Crankshaft 5H60
17Main bearing
18Connecting rod bearing half section
19Connecting rod
20Liner assembly
21Piston
22Piston Ring
23Oil ring
24Gudgeon Pin
25Oil pump assembly
26Suction Reeds
27Discharge reeds
28Suction valve plate
29Discharge valve plate
30Oil filter inner
31Suction strainer
32Loader rocker arm
33Loader power elements
34Shaft seal assembly
35Loader solenoid assembly
36Suction service valve
37Compressor safety valve
38Materialfor disconnectingcondensor for descalling & plugging them & providing of 15mm boretee out let for local circulation of mild acidsolution in the condenser (separate container & small pump set to circulatediluted acid solution to be used)PH value of solutionshall be4 and it should be checked frequently i.e every 1hour during the operation Scalgun WS solutionto beused for descalling purpose after2 to3hours of cleaning if PH value remainsless than7 flush with fresh wateradded with sodium carbonateTube to be cleaned with nylone brush after closingthe end covers circulate dilutedacid solution as specified above & PH value toe be maintainedas above by flushing the same with fresh water includingrecharging of stored refrigerant up to requiredpressure completeas specified & directedfor the AC plantsfollowing capacity:-
39a)3 x 40TR Capacity (Location -SSK 47 NSDGhatkopar )
40b)3 x 26TR Capacity(Location - NS -26Ghatkopar)
41c) 3 x 50 TR Capacity (Location - Vikramaditya Ghatkopar )
42d) 3 x 11 TR capacity ( Location ILMS)
43Preparation of old painted steel surface of AC Plant including scraping, cleaning and applying two coats of synthetic enamel paint of approved shed & colour over a coat of primer including markingand writing SM & MES No/ letters other details etc. complete all as specified and directed for AC plants of following capacities:-
44a)3 x 30TR Capacity (Location -SSK 47 NSDGhatkopar )
45b)3 x 20TR Capacity(Location - NS-26 Ghatkopar )
46b)3 x 50TR Capacity(Location - Vikramaditya Ghatkopar )
47Pumping down theexisting refrigerant fromthe condensor and carrying out theleak test of plant with the pressure of Nitrogen gasand monoitoring for 24hrsassesleakages by brazing & replacementof necessary gasketwhereverrequired including copper tubes of suitable size vacumizing of the plant by vaccum pump finallyreharging of existing refrigerant gas to the plant and topping up of refrigerant if requiredtomaintain the standard pressure etccomplete including testing of the plant for smooth functioning complete all as specified & directed( Note: Refrigerant required for topping up will be measured and paid separately under relevant items) Location : MO Ghatkopar
48Material for dismantling cooling tower by removing CT Fans, sprinklers, PVC filler and clean cooling tower body by removingscale , dust, dirt and refix PVC filler by cleaningwith dilutedHCL solution reassembling, connecting , cleaning externalsurface and applying two coats of approved synthetic enamel paint including writing SM number/ markingand testing etc. complete and refixingall as specified and directed for the following capacity cooling towers.
49a) Cooling towerof 100TR Capacity (Location- Vikramaditya Ghatkopar)
50b) Cooling tower of 56TR Capacity(Location - NS-26andNSDGhatkopar
51c) Cooling towerof 22TR Capacity (Location- ILMS Ghatkopar)
52Supply only thermostat of central AC plant of range5Degree centigrade to 25Degree centigrade etc. complete with all acessories all asspecifiedand directed
53Dittoall as per item No.20.00 but Sensor type . Make : Voltas
54Supply only repairs pilot solenoid valve from the liquid line suitable for AC Plantof variouscapacitiesetc. complete with all accessories all as specified and directed.
55Supply onlyin repairs pressure gauges HP/LP/OP from existing position of following capacitiesetc. complete with all accessories all as specified and directed.
56a) 0-30 Kg/ cm2
57b) 0-12.5Kg/ cm2
58c) 0 to 16kg.
59Removing the unserviceable water pressure gauges from water line& supply and fix new pressure gauge capable to measure pressure upto 7kg/ Sqcm etc. completewith all accessories all as specified and directed.
60All as per item No. 24 abovebut for pressure upto 10Kg/ Sqcm
61Suplly only ball valve of caststeel flange type of size 40mm bore from the liquid line after pumping down the refrigerent and test for leakages etc. complete all as specified and directed.
62Material for expansion valve of AC plant of capacity 25TR to 50TRincluding taking down unserviceable valve etc. complete all as specified and directed.
63Material for replacement of Power contactor type ML-1.5etc. Complete all as specified and directed .
64Material for replacement of Power contactor type 3TF46- 2etc. Complete all as specified and directed. Location :- SSK47 , Vikramaditya MO Ghatkopar
65Material for replacement of Thermal Timer range GT-100, 9 to 30Sec adjustable type voltage 215/ 450V etc. complete all as specified& directed.
66All as per item No.31 above but of range GT-200, 5to 18Sec etc. complete all as specified & directed (Make: L & T/ Siemens or equivalent)
67Supply only single phase preventortype ES-100etc. Complete all as specified& directed.(Make : L & T/ Minilac or equivalent)
68Supply onlyfollowingunserviceable / worn-out "V" compressor AHU etc. of fenneror equivalent ofDunlop/ Nerlon
69a) "V" Belt (B-76)
70b) "V" Belt (B-68)
71c) "V" Belt (B-108)
72d) "V" Belt (B-82)
73e) "V" Belt (B-32)
74Materialfor replacement of unserviceable HP cut out MP 5 etc. complete all as specified & directed.
75Ditto all as item No. 34 but Sensor type.
76Material for replacement of unserviceableLP cut out MP 1 etc. complete all as specified & directed.
77Ditto all as item No. 36 but Sensor type.
78Material for replacement of unserviceable oil pressurecut out controls for compressor etc. complete all as specified & directed.
79Ditto all as per Sr. No. 38 but Sensor type.
80Material for replacement of the defectiveindicator lamp LED type etc. complete all as specified & directed
81Material for replacement of following unserviceable / defective existing ampere meter digital type with CT ofsize 96 x 96mm etc. complete all as specified & directed.
82a) 0 to 50A
83b) 0 to 30A
84c) 0 to 20A
85Pumping down compressor model SMC -4- 65 to make : ACCEL to replace the shaft seal assembly and replace the same with new assembly and recharge the compressor all as specified and directed by Engineer- in -charge
86Removing defective unserviceable coil of loader solenoid valve from the system of compressor of make : ACCEL m -4-65/6-65 Including supplying and fixing new coil of loader suitable to the existing system all as specified and as directed.
87Supply only lubricating oil Freezol-36 or equivalent for top up of compressors of AC plants all as specified and directed
88Supply only refrigerent (R-32) gas for top up etc. complete all as specified and directed
89Ditto all as Item No. 45 but R410
90Material for disconnecting cooling coil section of AHU for descaling & Plugging them& providing 15mm bore tee out let for local circulation of mild acidsolution in the condenser (separate container & smallpumpset to circulate diluted acid solution to be used) PH value of solution shall be 4 and it should be checked frequentlyi.every 1hour during the operation Scalgun WS solutionto be used for descaling purposeafter 2 to 3hours of cleaningif ph valueremains less than 7flush with nylon brush after closing the end covers circulatedilutedacidsolution as specified above & PH value to be maintained as above by flushing the samewith fresh water incl recharging of stored refrigerant up to required pressure etc. complete all as specified & directed for the cooling coil section of AHU plants of following capacity:- Notes: i) The solution should be warmed up to 35oC by immersion of heater ii) It should be ensured during the entire process of cleaning the PH value of insulating water shall be 7 iii)Rate quoted against the items deemed to be included solution for decaling, rubber gasket washer, nuts, bolts, etc. as applicable)
91a) AHU of1 x 22.5TR Capacity (Location- NS-26 Ghatkopar)
92b) AHU of1 x 60TR Capacity (Location- SSK47 Ghatkopar)
93c) AHU of1 x 100TR Capacity (Location- VikramadityaGhatkopar)
94Supply only AHU pre air filter 10 micron 80% efficiency as permodel size
95a)600X 608 X 50 mm SSK 47AC PLANT GHATKOPAR
96b)610X 610 X 45 mm VikramaditiyaGHATKOPAR
97Supply only unserviceablemicro-Processors with display-L-5.5K47-Ghatkopar
98Supply only in unserviceable liquid line, Drier filter 1/2" size, Make Danfoss Location, Ghatkopar
99Materialonly for replacement of the defective cable, 3core, 2.5Sqmm Location -SSK 47 Ghatkopar
100Material only for replacement of the defective AHU duct canvas2.5feet square Location: NSD Ghatkopar
101Pumping down compressor model 5H-40/60 Make :Voltas for replacing the shaft seal assembly and replacing the shaft seal assembly and replacing the same with new assembly and recharging the compressor all as specified and directed .
102Supply, Installation, testing and commissioning of Twin cell FRP cooling tower 40 TR, suitable flow rate each for plant capacity rejection capacity with FRP water basin PVC fillings with integral louvers and drift eliminators complete with hot water basin either fitted with spray nozzles or having self rotating sprinklers, statically & dynamically balanced axial flow type fandirect driven or driven through reduction gear box with TEFC induction motor , suction screen, make up quick filling arrangement, over flow and drain connections and suitable inspection ladder, access arrangement for cooling lower all accessories, basin fittings, fan, fan motor suitable for 415 + 10 % Volt supporting structure, anti vibration mountings etc. complete all as directed. Location: ILMS Ghatkopar 1] Hot water inlet temperature - 36 deg C 2] Cold water outlet temperature - 32 deg C 3) Wet bulb temperature - 28.4 deg C 4] Flow Rate - 300 USGPM (150X2)Make: Mihir/Pharapur/Advance
103Dismantling of existing defective unserviceable compressor of any capacity from window or split AC, Refrigerators, water coolers etccomplete all as specified and directed.
104Supply only new hermetically sealed compresor in existing window type AC, 1.5 Ton capacity including initial filling of refrigerant gas to the required pressure, brazing, electric/piping connection etc complete all as specified and directed.
105- ditto- all as per item No. 56 above but for split type AC 1.5 Ton capacity.
106all as per item No.56 above but for Refrigerator exceeding165 Ltr and upto 310 LtrCapacity.
107-ditto- all as per item No.56 above but for Water Cooler 40/80 Litres capacity.
108-ditto- all as per item No.56 above but for Water Cooler 80/120 Litres capacity and 60/120 Litres capacity. Note : (i)The quoted rates shall also be deeed to include to undertake Guarantee of one year from certified dated of completion by the contractor for free replacement of compressorand/or rectification of the same (including charging of gas) all as directed by the GE in case any defects are noticed (during Guarantee Period of 01 year) due to any reasons whatsoever may be.
109Taking out window type air conditioner of capacity upto2 TRof any make/typeafter disconnecting of electric supply and removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, fan motor, blades & blowerand including servicing,overhauling and charging of refrigerantand testing including fixing back in its original location complete all as specified and directed.
110Taking out split type air conditioner (both indoor and outdoor units) of capacity upto 2 TRof any make/type after disconnecting refrigerant pipes, drain pipe and electric connection and removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacingthe spares like relay, capacitors, thermostat, fan motor, blades & blowerand including servicing, overhauling and connecting of refrigerant pipe,drain pipe and charging of refrigerant and testing including fixing back in its original location complete all as specified and directed. NOTE : (i) Spares will be measured and paid separately as supply only. (ii) Refrigerant gas will be measured and paid separately as supply only.
111Supply onlyblower fan motor for 1.0/1.5 TR capacity window type air conditionercomplete all as specified and directed.
112Supply only of fan blades ofmotor for water cooler upto 120 Ltr capacity including testing etc complete all as specified and directed
113Supply only blower fan blade for 1.5/2.0TR window type air conditionercomplete all as specified and directed.
114Supply only offan motor of water cooler up to120 Ltr capacity including testing etc complete all as specified and directed.
115Supply onlyblower drum of window type AC upto 2 ton capacity complete all as specified and directed.
116Supply only starting capacitor 80 to 100 MFD complete all as specified and directed.
117Supply only running capacitor of 36/45 MFD complete all as specified and directed.
118Supply only relay for window type ACupto 2 Ton capacity complete all as specified and directed.
119Supply only ofrelay for Water Cooler upto 120 Litre storage capacity, complete all as specified and directed.
120Supply only of relay for Refrigerator 165 to 310 LitreCapacity, complete all as specified and directed.
121Taking out existing unserviceable thermostat switch of water cooler and Supply onlynew thermostat switch for water cooler of any capacity including testing etc complete all as specified and directed.
122Taking out existing unserviceable thermostat switch of refrigerator and supply only new thermostat switch for refrigerator of any capacity including testing etc complete all as specified and directed.
123Supply only blower motor capacitor 4 MFD etc complete all as specified and directed. (Make : ASIAN/KEIL/EPCOS)
124All as per item No. 75 above but 6 MFD capacitor. (Make: ASIAN/KEIL/ EPCOS)
125Taking out existing unserviceable over load relay andSupply onlynew over load relay in water cooler upto 120 ltrs capacity etc complete all as specified and directed.
126Supply only copper tubing in replacement of3/8" dia for suction line and for liquid discharge line duly insulated with suitable insulation material for split AC including necessary soldering, flaring work, jointing, testing etc, making hole in wall for passing though pipe and making good to the disturbed surface to match with the adjoining surfaces etc complete all as specified and directed.
127Supply only PVC Nylon braided pipe 20 mm bore heavy duty including fittings to drain out condensed water of split AC including cutting of floor /wall & making good after laying of pipe to match the existing surface etc complete all as specified and directed.
128Supply onlyin repair, push cock / lift cock 15mm bore of brass, chromium plated, ISI marked for water cooler of any capacity etc complete all as specified and directed.
129Supply only PVC pipe 25 mm bore with and including fittings and necessary saddles fixed on wall etc for outlet drain etc complete all as specified and directed.
130Removing existing unserviceable electronic circuit control board of split AC unit upto 2 ton capacity and supply only new electronic PCB & display board kit in the indoor unit including testing etc complete all as specified and directed.
131Supply only filter media sedimentfor water cooler complete all as specified and directed.
132Supply only Carbon filter for water cooler complete all as specified and directed.
133Supply only remote sensorhandset suitable for split AC upto 2.0 ton capacity etc complete all as specified and directed.
134Material for cleaning the surface of water cooler/refrigerator/Ac and mark the SM/MES No. with black paint of minimum letter height 25 mm all as specified and directed by Engr in charge.
135Supply and fixing in repair Scroll Compressormake Denfoss 26 TR capacityfrom the unit after disconnecting electrical wiring & piping connecting nut & bolts etc refixing & installed ofscroll compressor 26 TR Capacity and connecting pipe line for existing pipe brazing & electric connecting etc andtesting for smooth functioning etc, complete all as specified and directed. Location: NS-26 AC plant at MO MB Ghatkopar
136Manual rescue & operation rescueand routine maintenance of swimming pool and its pump sets alongwith electrical panel board and chloronomes plant including their periodical maintenance and repairs (excluding major assy/items/jobs as mentioned in Sch "A" Part II) all as specified in one shifts of 8 hours consisting of the following:- (a)Vertical type pressure filteration plant capacity 3500 Ltrs / hour with 1/2"thick nozzle, inlet, out let complete with filter media, GI Pipe sluice valve etc complete. (b)Pumping set monoblock centrifugal 5HP induction motor electric driven for pressure filter -2 Nos. (c ) Suction sweepr trolley mounted 2ft wide complete with centrifugal pump driven by electric motor 2HP 415V 50 cycles supply with DOL starter etc complete-2 Nos. (d) Water Softener - 01 No. (e)Alum dosing tank FRP material 8 gallons capacity with manual mixing arrangement inlet and outlet connection etc complete - 1 No (f)Air compressor 125 Cubic ft air per minute driven by 5HP induction electric motor 3 ph, 415 Volts 50Hz incl DOL starter etc complete - 1 No. (g)LT panel board suitable for 3 phase 415 Volts AC supply wall mounted and 100 Amps MCCB incoming
137Material only copper sulphate of super quality ISI Marked complete all as specified and directed.
138Material only aluminium potash of super quality ISI Marked complete all as specified and directed.
139Material only Soda Ash of super quality ISI Marked complete all as specisified and directed.
140Material only Altoch GPGarnual Calcium Based Chlorine usefull for Disinfection Of Drinking Water treatment. These highly concentrated solid calcium hypochlorite products deliver upto 68% available chlorine. conforms to BS EN 900:2007 (Chemicals used for treatment of water intended for human consumption - calcium hypochlorit
141Material only stable bleaching powder (calcium hypochloride with chlorine content not less than 30%) as per IS: 15738 : 2007 and 1065 : 1989.
142Testing of water Supply and obtain the following the research and tested through NABL accredited Lab including submitting of test certificate to Engineer – in Charge complete all as specified. Details of tests to be carried out (i)Turbidity (NTU), (ii) PH, (iii) Total Hardness CaCO3 (mg/l), (iv) Sulphate (SO4) (mg/l), (v) Iron (Fe) (mg/l), (vi) Magnesium (Mg) (mg/l), (vii) E-coli or thermo tolerant coliform bacteria Note: The rate quoted deemed to include the cost of collecting sample of water in four different locations from MO (MB) Ghatkopar and the test to be carried out in the first and seventh month of the contract.
143Overhauling of monoblock pump set by removing and dismantling of pump from connected suction/ delivery pipes and electric connections etc. and taking to workshop and replacing (labour element only) unserviceable spares such as gland packing set, gun metal bushes, bearing, water seal packing set, gun metal bushes , bearing, water seal packingetc. cleaning of impeller, greasing etc. reassembling and refixing in original position including packing, and necessary nut & boltetc. including minor parts and reconnection, recommissioningand testing for smooth functioningoffollowing capacity pumps. (Note:- Major spares such as gunmetal bushes, gland packing, bearing to be replaced will be measured & paid as supply only under respective items)
144a) 10 HP Capacity
145Rewinding ofunserviceable electric motor 3 phase 50 Hz 415volt offollowing capacity pump set complete of Motor of capacity10 HP complete all as specified and directed. a) Disconnecting& removing the electric motor from installed position including, loading, unloading and transporting to approved workshop b) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wireofexisting gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. completefor class "F" insulation c) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continously to check the RPM etc. to the satisfactory performance etc. complete. NOTE: Any damage caused during handling will be made good without any extracost to department
146Supply only sluice valve of size 100 mm long type with cast iron body bonnet wedge stuffing box gland thrust plate hand wheel of grey cast iron spindle of stainless steel nut body seal ring and wedge facing ring lead tin, bronze bolt nut of high carbon steel bounate gasket of compressed fibre glands packing of jute having flanged & drill type nominal pressure rating, PN 1.6 i.e 10 kgs/Sqcm unit conforming to IS -14846-2000 including material & labour for jointing flanged joint with rubber fibre jointing ring bolt nut & washer etc including necessary earth work. complete all as specified and directed Make : Kirloskar/Leader/L&T (Audco)/Zoloto
147Manual rescue & operation rescue of the following items in three shifts per day (each shift 08 hrs continuous duration) operated by one operator in each shift including periodical maintenance/repairs (daily check and cleaning, monthly, quarterly, half yearly maintenance) with all consumables parts (except for major assembly/items/jobs given in sch "A" part-II) of Pump sets. Fire Pump House Vikramaditya store House : (i) Fire Main Pump Set 75 HP three phase 415 V, Make :- Kirloskar -01 No (ii)Fire pump set 72 HP Diesel engine operated, Make :- Kirloskar -01 No (iii)Fire jockey pump set 7.5 HP , Make :- Kirloskar -01 No (iv)Fire priming/booster pump set 7.5 HP , Make :- Kirloskar -02 Nos (v)LT controll pannel and water pressure switch Staff employed : FGM - 01 No (i) First Shift - 0600 hrs to 1400hrs (ii) Second Shift - 1400 hrs to 2200 hrs (iii) Third Shift - 2200 hrs to 0600 hrs
148Manual rescue & operation rescue of the following items in three shifts per day (each shift 08 hrs continuous duration) operated by one operator in each shift including periodical maintenance/repairs (daily check and cleaning, monthly, quarterly, half yearly maintenance) with all consumables parts (except for major assembly/items/jobs given in sch "A" part-II) of Pump sets. (a) (i)Pumping set mono block 10 HP - 03 Nos.(ii) Electric LT panel (iii) Fire Pump set -25 HP-01 No. Location - Moora pump House at NSD Ghatkopar. (i) First Shift - 0600 hrs to 1400hrs (ii) Second Shift - 1400 hrs to 2200 hrs (iii) Third Shift - 2200 hrs to 0600 hrs
149Taking down unserviceablemono blockmotor pump setof capacity 3 phase 10 HP disconnecting the all necessary electrical connections and dismantlng the pump side and replacing the worn out winding and connected items like bearings, bush and coupling and rubber coupling etc; and rewinding with super enameled copper wire of suitable guage including varnishing, reassembling and re-coupling with pump set, testing and painting with synthetic enameled paint after preparing the existing surface complete all as specified.
150Taking down unserviceablemono blockmotor pump setof capacity 3 phase 5 HP disconnecting the all necessary electrical connections and dismantlng the pump side and replacing the worn out winding and connected items like bearings, bush and coupling and rubber coupling etc; and rewinding with super enameled copper wire of suitable guage including varnishing, reassembling and re-coupling with pump set, testing and painting with synthetic enameled paint after preparing the existing surface complete all as specified.
151Overhauling of monoblock pump set by removing and dismantling of pump from connected suction/ delivery pipes and electric connections etc. and taking to workshop and replacing (labour element only) unserviceable spares such as gland packing set, gun metal bushes, bearing, water seal packing set, gun metal bushes , bearing, water seal packingetc. cleaning of impeller, greasing etc. reassembling and refixing in original position including packing, and necessary nut & boltetc. including minor parts and reconnection, recommissioningand testing for smooth functioningoffollowing capacity pumps.
152a) 25 HP Capacity
153Rewinding ofunserviceable electric motor 3 phase 50 Hz 415volt offollowing capacity pump set complete comprises as under :- a) Disconnecting& removing the electric motor from installed position including, loading, unloading and transporting to approved workshop b) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wireofexisting gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. completefor class "F" insulation c) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continously to check the RPM etc to the satisfactory performance etc. complete. NOTE: Any damage caused during handling and transportation will be made good without any extracost to department
154i) Motor of capacity 2-5HP
155ii) Motor of capacity 7.5HP
156iii) Motor of capacity 10 HP
157iv) Motor of capacity 25 HP
158Materialforfollowing spares for monoblock pump set all as specified and directed
159a) Gun metal bushes for upto 25 HP capacity
160b) Gland packing set for upto 25 HPcapacity
161c) Bearing for upto 25 HP capacity
162Material only for Scrapping & removal of old painted surface & bring out to uniformity and apply one coat of synthetic enamel paint all as specified and directed by Engr in charge.
163Repairs & Maintenanceof 75 HP fire service main pumpmulti stage pump of horizontal split casing running at 1450 RPM coupled with 72 HP diesel engine including servicing byreplacing unserviceable items of gland packing , bearing and charging lubricants for smooth running including servicing of 72 HP diesel engine by replacing filters, lubricant oil including defective parts like coupling , oil air filters, servicing of radiator, replacement exhaust gasket, replacement of diesel supply and return pipes from tankto engine, battery leads and checking of charging circuit complete including base frame and pipe lines upto inside pump room of approved colour after preparation of existing surface complete all as specified and directed.
164Manual rescue & operation rescue & maintenance of NSV pump housein two shifts per day (each shift 08 hrs continuous duration) operated by one operator in each shift including periodical maintenance/repairs (daily check and cleaning, monthly, quarterly, half yearly maintenance) with all consumables parts and the operator is also responsible to maintain DG Set of Capacity 500 KVA located at NS-09 Power House. (except for major assembly/items/jobs given in sch "A" part-II) (a) Staff employed : FGM -01 No Location :NS 09 MO MB Ghatkopar (i) First Shift - 0600 hrs to 1400hrs (ii) Second Shift - 1400 hrs to 2200 hrs (b) i)Pumping set mono block 15 HP - 02 Nos.(. Location - NSV) Note-: The operator is also responsible for B Check of all DG Setsand minor repairs carried out in pumpset & DG sets.
165Taking down unserviceablemono blockmotor pump setof capacity 3 phase 15 HP disconnecting the all necessary electrical connections and dismantling the pump side andthe worn out winding for rewinding and connected items like bearings, bush and coupling and rubber coupling etc; and rewinding with super enameled copper wire of suitable guage including varnishing, reassembling and re-coupling with pump set, testing and painting with synthetic enameled paint after preparing the existing surface complete all as specified. Note-: Labour rates shall not be included & the same will paid seperately in item No. 1.
166Material only for carrying out "B" check for 500KVA DG set & periodical servicing all as per manufacturers instructions. Note : Rate quote shall be deemed to be inclusive of sparesbut excluding engine oil.
167Material only for carrying out "B" check for 250KVA DG set trolley mounted all as per manufacturers instructions. Note : Rate quote shall be deemed to be inclusive of sparesbut excluding engine oil.
168Material only for carrying out "B" check for 125 KVA DG set all as per manufacturers instructions. Note : Rate quote shall be deemed to be inclusive of sparesbut excluding engine oil.
169Material only for carrying out "B" check for62.5 KVA DG set all as per manufacturers instructions. Note : Rate quote shall be deemed to be inclusive of sparesbut excluding engine oil.
170Material only Engine Oil 15W 40 for 500/250/125/62.5 KVA DG set complete all as specified and directed.
171Material only of engine filter of 500 KVA DG Set complete all as specified and directed
172Material only engine filter of250 KVA DG Set complete all as specified and directed
173Material only of engine filter of 125KVA DG Set complete all as specified and directed
174Material only of engine filter of 62.5KVA DG Set complete all as specified and directed
175Material only of Oil filter of 500 KVA DG Set complete all as specified and directed
176Material only of Oil filter of 250 KVA DG Set complete all as specified and directed
177Material only of Oil filter of 125 KVA DG Set complete all as specified and directed
178Material only of Oil filter of 62.5 KVA DG Set complete all as specified and directed
179Material only of air filter of 500 KVA DG Set complete all as specified and directed
180Material only of air filter of 250 KVA DG Set complete all as specified and directed
181. Material only of air filter of 125 KVA DG Set complete all as specified and directed
182Materialt only of air filter of 62.5 KVA DG Set complete all as specified and directed
183Material only coolent for 500/250/125/62.5 KVA DG SetS complete all as specifiedand directed
184Fixing only in replacement of batteries of 12 V,180 AH Capacity for DG Set complete all as specified and directed.
185Annual maintenance of water coolers of bluestar make installed at Naval Depot Area ghatkopar to check water quality, opreventiveand breakdown maintenance, lubrication, , power supply, repair and replacement of filter candles time to time and the water cooler under contract will be serviced for times during the contract time as per standard checklist ,compressor will be checked for its proper functioningAll breakdown calls will be attended to during the contract period,The Blower motor will be checked,the driver set of the blower section wll be inspected but tension adjusted and belts changed,Any defects in the electrical item and control wiring will be attended during contract period.cost of spare parts/consumables required shall be borne as per type of contract and shall be applicable to all activities specified under contract etc complete all as specified and directed.
186Dismantling of existing defective unserviceable compressor of any capacity from window or split AC, Refrigerators, water coolers etccomplete all as specified and directed.
187Supply & Fix new hermetically sealed compresor in splittype AC, 1.5/2.0 Ton capacity including initial filling of refrigerant gas to the required pressure, brazing, electric/piping connection etc complete all as specified and directed.
188-dittoo- all as per item No.131 above but for Water Cooler Blue star make 80 Litres capacity.
189-dittoo- all as per item No.131 above but for Water Cooler Blue Star Make 80/120 Litres capacity and 60/120 Litres capacity. Note : (i) The Contractor shall submit original purchase voucher alongwith manufacturer"s test certificate and Guarantee Card etc. (ii) The quoted rates shall also be deeed to include to undertake Guarantee of one year from certified dated of completion by the contractor for free replacement of compressorand/or rectification of the same (including charging of gas) all as directed by the GE in case any defects are noticed (during Guarantee Period of 01 year) due to any reasons whatsoever may be.
190Taking out split type air conditioner (both indoor and outdoor units) of capacity upto 2 TRof any make/type after disconnecting refrigerant pipes, drain pipe and electric connection and removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacingthe spares like relay, capacitors, thermostat, fan motor, blades & blowerand including servicing, overhauling and connecting of refrigerant pipe,drain pipe and charging of refrigerant and testing including fixing back in its original location complete all as specified and directed.NOTE : (i) Spares will be measured and paid separately as supply only. (ii) Refrigerant gas will be measured and paid separately as supply only.
191Replacement of fan blades ofmotor for water cooler upto 120 Ltr capacity including testing etc complete all as specified and directed
192Replacement of fan motor of water cooler up to120 Ltr capacity including testing etc complete all as specified and directed.
193Supply only running capacitor of 36/45 MFD complete all as specified and directed.
194Supply only refrigerent (R-32) gas for top up etc. complete all as specified and directed
195Supply only refrigerent R-410 gas for top up etc complete all as specified and directed
196Replacement ofrelay for Water Cooler of Bluestar Make 120 Litre storage capacity, complete all as specified and directed.
197Taking out existing unserviceable thermostat switch of water cooler and Supply & fix new thermostat switch for water cooler of any capacity including testing etc complete all as specified and directed.
198Taking out existing unserviceable thermostat switch of refrigerator and supply & fix new thermostat switch for refrigerator of any capacity including testing etc complete all as specified and directed.
199Supply and fix in repairs blower motor capacitor 4 MFD etc complete all as specified and directed.
200All as per item No. 15 above but 6 MFD capacitor.
201Taking out existing unserviceable over load relay and supply & fixnew over load relay in water cooler upto 120 ltrs capacity etc complete all as specified and directed.
202Taking down carefully split type AC upto 2 Ton capacity & refixing inner & outer unit at new location alongwith existing frame work, bracket, refrigerant tubing, cable, stablizer etc and making good existing surface to match with the adjoining surfaces etc complete all as specified and directed.
203Supply, fixing, clamping and jointing copper tubing in replacement of3/8" dia for suction line and for liquid discharge line duly insulated with suitable insulation material for split AC including necessary soldering, flaring work, jointing, testing etc, making hole in wall for passing though pipe and making good to the disturbed surface to match with the adjoining surfaces etc complete all as specified and directed.
204Supply & Lay PVC Nylon braided pipe 20 mm bore heavy duty including fittings to drain out condensed water of split AC including cutting of floor /wall & making good after laying of pipe to match the existing surface etc complete all as specified and directed.
205Supply& fix in repair, push cock / lift cock 15mm bore of brass, chromium plated, ISI marked for water cooler of any capacity etc complete all as specified and directed.
206Supply and fix water tray made out of GI sheet 2 mm thick for water coolerany capacity with out let system connection provided with and including PVC nylon braided pipe of 20 mm dia upto 3 mtr length and also connecting to drain pipe etc complete all as specified and directed.
207Removing existing unserviceable electronic circuit control board of split AC unit upto 2 ton capacity and supply and fixing new electronic PCB & display board kit in the indoor unit including testing etc complete all as specified and directed.
208Supply and fixing filter media sedimentfor water cooler complete all as specified and directed.
209Supply and fixing Carbon filter for water cooler complete all as specified and directed.
210Supply only remote sensorhandset suitable for split AC upto 2.0 ton capacity etc complete all as specified and directed.
211Supply and fix in repair remote sensorplate suitable for split AC upto 2.0 ton capacity etc complete all as specified and directed.
212Supply and fix in repairs multipurpose door lock with duplicate key of water cooler of any make & capacity etc complete all as specified and directed.
213Attending day to day storage electric gysers 25/50 ltr storage capacity complaints by disconnecting of electric connection and water supply connection and refixing after repair and rectification of defects of gyser i.e. to replace burnt wires to change indicator lamp,top plug nuts/bolts/gaskets/safety release valve /anchor fastners etc and making gyser ready for reuse.Any small items are deemed to be included in the rate quoted for this item. Note-: The inner shell ,outer cover thermostst switch gyser assembly ,elements bottom cover SS Pipe set(02 Nos) of hot and cold water supply,if replaced shall be measured and paid separately complete all as specified and directed.
214Supply and fixing in replacement water heating element upto 3KW in round/angular etc of any shape fittedin existing gysers 25/50 ltrs complete all as specified and directed
215Supply and fixing in replacement Thermostate assembly manually adjustment type setting range 35 to 100 degree cent for fixing upto 50 ltrs capacity complete all as specified and directed.
216Supply and fix SS Pipe connector set of 02 Nos i.e. cold and hot water supply for gyser complete all as specified and directed.
217Supply and fix in replacement Temperature auto cut with indication lamps unit complete all as specified and directed.
218Material and labour to carry out testing of entire Fire alarm system at each store for functionality test and preventive maintenance of the Panel including following works to be carried out st site:- (1) Checking of Voltage supply to all cards, battery health checking,lamp test of Panel. (2) Checking of History log of Alarm and trouble. Clearing of temp files from Graphics panel. (3) Checking of network communication and cable checking for proper signal transmission. (4) Checking of detector, hooter, MCP, Weather proof hooter, Weather proof MCP Isolator, network repeater and it communication. Graphics system checking for proper functionality and maintaining the log book for the test carried out. (5) Test shall consist of Visual inspection and functionality test complete all as specified and directed. Note- The rates of Scaffholding, Overhead crane etc as per site requirementshalldeemed to be included in the contractor"s quoted rates.
219Material labour for Monthly periodecal maintainanceservice & also on calls basis to attend breakdown/fault of existing fire alarm locatyed at various sheds of total 20 Nos . Note:- 1)Qutoted rates includes transportation, labour rates. 2)Materials will be measured & paid seperately. 3) Job shall be completed by OEM/fire alarm mfg system authorised rep/engineer. 4) Visit will consist of one engineer and 2 technicians. 5)Spare parts/Component will be paid separately complete all as specified and directed. 6) loose fire wiring o br sacured included above quoted rates Total Nos of Store houses-20 Nos Note: Store houses height will be upto 10 meter.
220Supplyinstallation testing & commissioning of AMPS-24E for Fire alarm panel, It shall be fully compatible with the existing Fire panel of Notifier make with following specification - 240 VAC 50/60 Hz input, 2.25 A maximum • One 5 VDC @ 1.0 A - nonpower-limited output - TB6 One 24VDC @ 1.0 A - nonpower- limited output - TB6 Power-limited if 5V output is not used. Maximum Ripple Voltage (24 VDC & 5VDC): 250 mVrms • One 24 VDC @ 4.5 A - filtered, nonpower-limited source - TB2 Maximum output:4.2 A when 5V output (TB6) is used. 3.5 A when 24V output (TB6) is used. 3.2 A when both outputs on TB6 are used.Maximum Ripple Voltage: 250 mVrms complete all as specified and directed Make Notifier
221Supply, Installation, Testing and commissioning of CPU Card for Microprocessor based Multi-loop, True Peer-to-Peer Networkable Addressable Fire Alarm Control Panel with minimum 600 characters LCD display, 4000 event plus 1000 alarm log history events. It should be compatible to panel equipped with sufficient numbers of. Card shall have loop capacity of minimum 150 analog addressable devices. It should support the panel to work in degrade mode. Four access levels, inbuilt flash EPROM complete all as specified and directed Make Notifier.
222Supply, installation, testing and commissioning of loop card of 150 point for NFS 3030 Fire alarm panel. It should be programmable by laptop at site. The card should be compatible to the existing system and device in the network. Its functionality should not adversely affect the installed system and shall be complete as specified and directed. Make : Notifier
223Supply installation testing and commissioning Addressable Multi-criteria Photo-Thermal Detector ( Heat & Smoke detector) with sensitivity range of0.5 to 4.0% obs/ft.The intelligent multi criteria detection device shall include the ability to combine the signal of the thermal sensor with the signal of the photoelectric signal in an effort to react hastily in the event of a fire situation. It shall also include the inherent ability to distinguish between a fire condition and a false alarm condition by examining the characteristics of the thermal and smoke sensing chambers and comparing them to a database of actual fire and deceptive phenomena. The detector shall have twin bi-color LED for 360 deg viewing. Addressingshall be with user friendly rotary decimal switches. Designed to meet UL268, 7th Edition complete all as specified and directed Make Notifier
224Supply,installation,testing and commisioning of Network control Annuciator -2 NCA-2 Panel.Its functinality should not adversely affect the installed system and shall be complete all as specified and directed.Make-Notifier
225Supply installtion testing and commisioning of Network control module (NCM-F).It should be programmable by laptop at site. The card should be compatible to the existing system and device in the network.Its fuctionality should not adversely affect the installed system and shall be complete all as specified and directed.Make-Notifier.
226Supply installation testing and commissioning of Intrinsically safe Photoelectric Smoke Detector with Zener barrier Beam Master detector with Transmitter and receiver and all necessary accessories sensitivity range of 0.5 to 3.7% obs/ft. The detector shall have multi co-operative sensing technology for faster response & avoid false alarms. The detector shall have twin bi-colour LED for 360 deg viewing. Addressing shall be with user friendly rotary decimal switches complete all as specified and directed.
227Supply installation testing and commissioning Addressable Manual Call Point (Pull down / Break Glass Type). The device shall have an LED which shall blink in normal state & get steady on activation to monitor the health status of the device complete all as specified and directed Make: Notifier
228Supply installation testing and commissioning Addressable Sounder cum Strobe rated at 75 dBA @ 3m for Audible annunciation and 75cd flashing at 1 Hz for visual indication all as directed and specified
229Supply and fixing Fiber optics patch cord,it should be compatible to the existing system.
230Supply and fix Isolators module complete all as specified and directed.
231supply and fix Cast iron water end type Butterfly valves (standard lever operated type for 150 mm dia. and below and gear operated type for 200 mm and above dia.) butterfly valves as per BS 5155/ IS 13095 (PN 10) having nylon coated CI disc, nitrile rubber seat complete with matching flanges, gaskets, galvanised fasteners. a) 150 mm nominal dia
232Supply and fix Forged brass screwed ends full bore ball valves (min PN 10 rating) with suitable fittings of screwed end type complete 25NB complete all as specified and directed
233Supply and fix Reinforced rubber lined fire hose as per IS standard with stainless steel couplings as per IS: 903, 7.5m long for internal hydrants complete all as specified and directed.
234supply and fix Swinging type first aid fire hose reel drum comprising of reinforced rubber tubing of 20 mm dia and following lengths conforming to IS :444 Type II, MS drum with fixing bracket conforming to IS:884 & with 5 mm dia gun metal shut off nozzle conforming to IS:8090 and 25NB forged brass valve. (30 meters Hose length) complete all as specified and directed.
235Supply and fix 63 mm x 15 mm stainless steel branch pipe and nozzle as per IS:903 to be connected to hose coupling.
236Supply and fix Weather proof outdoor lockable hose cabinet made of 14 SWG CRCA MS Sheet with 2 doors and 4 mm thick glazed glass with water proof rubber beading. it shall be in red outside and white inside with two coats of enamel paint over a coat of primer. "HOSE CABINET NO.." shall be painted on the inner face of the glass in 50 mm size block letter. Cost shall include the cost of break glass box containing the key of the cabinet. Size 600(H) x750(L) x 250(D) mmcomplete all as specified and directed.
237Supply & fixing gun metal Fire internal Hydrant single landing valve with 80 mm N.B. flanged inlet, brass spindle controlled 63 mm dia female instantaneous outlet type. G.M. coupling, blank cap, chain, twist release type lug & all accessories conforming to IS:5290. Including fixing with anchor fastener and flanged tapping from wet riser and providing pressure gauge with gun metal ball valve complete as required.
238Supply and fix in repairs Foot valve cast iron body both ends flanged suitable for 150 mm bore MS pipe connection all as specified and directed Make Kirloskar/Kartar/BIR/AUDCO
239Supply and fix in repairs Foot valve cast iron body both ends flanged suitable for 100mm bore MS pipe connection all as specified and directed Make Kirloskar/Kartar/BIR/AUDCO
240Dismantling of Monoblock pump of under mentioned capacities from connected suction/ delivery pipes and electric connections etc, taking to workshop. overhauling of the same and replacing unserviceablespares/parts/components, cleaning of impeller, greasing, reassembling, bringing back from workshop to the site, refixing in original position includingproviding packing, necessary nuts & boltsetc, and reconnecting, recommissioningand testing for smooth functioning. Location :NCHC Hospital (Note: Cost of all the elements (material cost as well as labour cost) for making the pumps completely functional except supply only of the spares/components/parts included in item No 1 to 2 shall be deemed to be included in the quoted rates).
2411(a) 3 HP Capacity
2421(b) 7.5 HP Capacity
243Supply only following spares /components/parts for monoblock pump set all as specified and directed :-
2442(a) Gun metal bushes for 3 HP capacity
2452(b) Gun metal bushes for 7.5HP capacity
2462(c) Bearing for 3 HP capacity
2472(d) Bearing for 7.5HP capacity
2482(e) Water seal packing for 3 HP Capacity
249Rewinding ofunserviceable electric motor 3 phase, 50 Hz, 415 Volt offollowing capacity pump set complete comprises as under :- (a) Disconnecting & removing the electric motor from installed position including loading, unloading and transporting to approved workshop. (b) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wire of existing gauge including provision of all insulating material such as insulation paper, sleeves, tape, varnish etc. complete for class "F" insulation. (c) Transporting the motor back to the location, reinstalling in original position including making alignment, electrical & water connection, commissioning and testing for 8hours continuously to check the RPM etc. to the satisfactory performance etc. Location :NCHC Hospital
2503(a) Motor of capacity3 HP
2513(b) Motor of capacity 7.5HP (AHU Blower )
252M & L for disconnectingcondenser for descalling, plugging them & providing 15mm boretee outlet for local circulation of mild acidsolution in the condenser (separate container & small pump set to circulatediluted acid solution shall be used)PH value of solutionshall be4 and it shall be checked frequently i.e every 1hour during the operation, Scalgun WS solution shall beused for descalling purpose after2 to3hours of cleaning if PH value remainsless than 7, flush with fresh wateradded with sodium carbonateTube, to clean with nylon brush, after closingthe end covers circulate dilutedacid solution as specified above & PH value to maintainedas above by flushing the same with fresh water including recharging of stored refrigerant upto requiredpressure completeall as specified & directed for 2 x 11 TRcapacity of AC plants :- (Location-NCHC Hospital)
253Pumping down theexisting refrigerant fromthe condenser, carrying out theleak test of plant with the pressure of Nitrogen gasand monitoring for 24hrs,assessleakages by brazing & replacement of necessary gasketswherever required including copper tubes of suitable sizes, vacumizing of the plant by vaccum pump, finallyrecharging of existing refrigerant gas to the plant and topping up of refrigerant if requiredtomaintain the standard pressure etccomplete including testing of the plant for smooth functioning complete all as specified & directed. Note: Refrigerant required for topping up will be measured and paid as supply only separately under relevant item.However, cost of all the other elements as specified above including replacement of gaskets, copper tubes etc for making the condensor functional shall be deemed to be included in the quoted rate of above item. Location : NCHC Hospital
254M & L for dismantling cooling tower of undermentioned capacity by removing CT Fans, sprinklers, PVC filler, cleaning cooling tower body by removing scale, dust, dirt, refixing PVC filler after cleaningwith dilutedHCL solution, reassembling, connecting,cleaning externalsurfaces and applying two coats of approved synthetic enamel paint including writing SM number/ markingand testing etc. complete all as specified and directed :-
255Cooling tower 2 x 11TR Capacity (Location- NCHC Hospital)
256S & F in repairs Sensor type thermostat of central AC plant of range5 Degree centigrade to 25Degree centigrade complete with all accessories, asspecifiedand directed,Make : ANERGY / SIEMENS / HONEYWELL / JOHNSON
257Removing the unserviceable water pressure gauges from water line& supply and fix new pressure gauge capable to measure pressure upto 7kg/ Sqcm etc. completewith all accessories, as specified and directed, Make : FIEBIGH / H.GURU / BAKER MERCER.
258-ditto- all as per item No. 192 abovebut for pressure upto 10Kg/ Sqcm
259S & F in repairs for expansion valve of AC plant of capacity 15 TR to 25 TR, complete all as specified and directed, (Location-NCHC Hospital
260M & L for replacement of Power contactor type ML-1.5,complete all as specified and directed, Make : L & T, Siemens
261M & L for replacement of Power contactor type ML- 2, complete all as specified and directed, Make : L & T, Siemens
262M & L for replacement of Thermal Timer range GT-100, 9 to 30Sec adjustable type voltage 215/ 450V, complete all as specified& directed, (Make : L & T/ Siemens)
263Supply and fix in replacement single phase preventertype ES-100, complete all as specified& directed, (Make : L & T/ Minilac)
264S & F in replacement of unserviceable / worn-out"V" Belt (B-85) of compressor,AHU etc. of Make : Dunlop/ Nerlon :-
265Material & Labour for replacement of unserviceable Sensor typeHP cut out, complete all as specified & directed, Make : PENN / INDOFOSS / RANCO / DANFOSS / JOHNSON.
266M&L replacement of unserviceable LP cut out, Sensor type, complete all as specified & directed, Make :PENN / INDOFOSS / RANCO / DANFOSS / JOHNSON.
267Material & Labour for replacement of the defectiveindicator lamp LED type, complete all as specified & directed, Make : SIEMENS / CONCORED / C&S / L&T.
268M&L for replacemetn of existing unserviceable/defective multifunctionalmeter, digital type of size 96 x 96mm with and includingCT, complete all as specified and directed, Make : L&T (RISHAB) / TRINITY / C&S / L&T.
269M & L for replacement existing unserviceable / defective ampere meter with new digital type, 0-30 Ampers of size 96 x 96mm with and including CT, complete all as specified & directed, Make : AE / ENERCON / SECURE / L&T
270Supply only refrigerant (R-407C) gas for topping-up complete all as specified and directed, Make: MAFRON / FREON.
271Removing old unserviceable globe valve and S & Fnew CI globe valve with nuts, bolts, washer, new gaskets etc. of 50 mm bore sizes complete all as specified & directed, Make: ADVANCE / AUDCO / SANT / BIR.
272S & F in repairs liquid line, Drier filter 1/2" size, Make DANFOSS / EMERSON / CASTLE,Location: NCHC Hospital
273M & L for Cleaning complete DX type cooling coil ofAHU with chemical solution caustic soda to remove impurities completely, dust and foreign materials with nylon brush and cleaning cooling coil with fresh water, complete all as specified & directed for the cooling coil section of AHU of 2 x11TR Capacity (Location :- NCHC Hospital
274S & F in repairs unserviceable hermetically sealed compressor reciprocating type 5.5 TR working on R-22, 3Phase , 415V including brazing and electric/ piping connection etc. complete all as specified & directed, Make : COPLAN / EMERSON / BLUE STAR. Location :-NCHC Hospital
275Supply and fix in repairs, MCCB, TP, 25 to 100 Amps, 415 Volt, 50 Hz, breaking capacity 16 KA, fixed type, Complete all as specified and directed.
276Supply and fix in repairs MCCB, TP, 125 Amps, 415 Volt, 50 Hz, breaking capacity 16 KA, fixed type, Complete all as specified and directed.
277M & L in replacement of Earthing complete with GI earth plate electrode 600x600x6mm thick buried directly in ground (earth pit not less than 2.25 M deep below ground level) with top edge of the plate not less than 1.5 M below normal ground level, connected to galvanized iron strip 32 x 6 mmby means of GI bolts nuts, check nuts and washers etcall as shown in electrical plate No. 3 of SSR part 01 1996 including earth work PCC pit with cover, funnel with watering pipe, wire mesh and GI protection pipe light grade all as specified and directed.
278Dismantling of existing defective unserviceable compressor of any capacity from window or split AC, Refrigerators, water coolers etccomplete all as specified and directed.
279Supply & Fix new hermetically sealed compressor in existing window type AC, 1.5 Ton capacity including initial filling of refrigerant gas to the required pressure, brazing, electric/piping connection etc complete all as specified and directed.
280All as per item No. 214 above but for split type AC 1.5 Ton capacity
281All as per item No. 214 above but for split type AC 2 Ton capacity.
282All as per item No 214 above but for refrigerator 165 ltrs to 310 ltr Capacity.
283All as per item No. 214 abovebut Water Coolers 40 / 80 Ltrs Capacity.
284Taking out window type air conditioner of capacity upto 2 TRof any make/typeafter disconnecting of electric supply and removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, fan motor, blades & blowerand including servicing,overhauling and charging of refrigerantand testing including fixing back in its original location complete all as specified and directed.
285Taking out split type air conditioner (both indoor and outdoor units) of capacity upto 2 TRof any make/type after disconnecting refrigerant pipes, drain pipe and electric connection and removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacingthe spares like relay, capacitors, thermostat, fan motor, blades & blowerand including servicing, overhauling and connecting of refrigerant pipe,drain pipe and charging of refrigerant and testing including fixing back in its original location complete all as specified and directed. NOTE for items no 35 & 36(i) Spares will be measured and paid separately as supply only. (ii) Refrigerant gas will be measured and paid separately as supply only."
286Replacement of corroded body base tray & connected portion of window type AC upto 2 Ton capacity (base tray made out of M S Sheet 18 BG and other portionwith MS sheet 20 BG) including motor mounting frame, nuts/bolts of suitable size and spray painting with two coats of synthetic enamel paint over one coat of primer including replacement of damaged insulation etc complete all as specified and directed. Note : For replacement of the body, cost of dismantling of compressor etc including reassembling and gas charging etc as required at site shall also be deemed to be included in the quoted rates.
287Supply onlyblower fan motor for 1.5 TR capacity window type air conditionercomplete all as specified and directed.
288Supply only blower fan blade for 1.5 TR window type air conditionercomplete all as specified and directed.
289Supply onlyblower drum of window type AC upto 1.5 ton capacity complete all as specified and directed.
290S&F in repairs of blower fan motor for 1.5 TR capacity window type air conditionercomplete all as specified and directed.
291S&F in repairs of blower fan blade for 1.5 TR window type air conditionercomplete all as specified and directed.
292S&F in repairs ofblower drum of window type AC upto 1.5 ton capacity complete all as specified and directed.
293Supply only relay for window type ACupto 1.5 Ton capacity complete all as specified and directed.
294Supply only over load protector in window type AC upto 1.5 ton capacity complete all as specified and directed.
295Supply only selector switch push button type for window type AC upto 1.5 Ton capacity complete all as specified and directed.
296All as per item No. 230 above but selector switch rotary type.
297Supply onlyblower fan motor upto 2.0 TR capacity spilt type air conditionercomplete all as specified and directed.
298Supply onlyblower drum of split type AC upto 2.0 ton capacity complete all as specified and directed.
299Supply only outdoor motor upto 2.0 TR split type air conditionercomplete all as specified and directed.
300Supply only outdoor fan blade upto 2.0 TR split type air conditionercomplete all as specified and directed.
301S&F in repairs ofblower fan motor upto 2.0 TR capacity spilt type air conditionercomplete all as specified and directed.
302S&F in repairs of blower drum of split type AC upto 2.0 ton capacity complete all as specified and directed.
303S&F in repairs of outdoor motor upto 2.0 TR split type air conditionercomplete all as specified and directed.
304S&F in repairs of outdoor fan blade upto 2.0 TR split type air conditionercomplete all as specified and directed.
305Supply only thermostat switch for window type/split type AC upto 2 Ton capacity complete all as specified and directed.
306S&F in repairs ofthermostat switch for window type/split type AC upto 2 Ton capacity complete all as specified and directed.
307S&F in replacement air filter pad suitable for any type AC 1.5/2.0 ton capacity complete all as specified and directed.
308S&F in replacement condensing coil assembly suitable upto 2.0 Ton capacity window/split AC complete all as specified and directed.
309S&F in replacement cooling coil assembly suitable upto 2.0 Ton capacity window/split AC complete all as specified and directed.
310Replacement of PVC cover grill of window type AC upto 1.5 ton capacitycomplete all as specified and directed.
311Replacement of existing damaged outer cover of window type AC with 20 SWG aluminium anodised sheet including moulding, screwing etc complete all as specified and directed.
312Taking out corroded body & frame of water cooler of 80 Litres storage capacity and replacement with new angle iron frame of size 40 x 40 x 6mm and cooler body with MS/CRCA sheet of 20 gauge, painting with two coats of synthetic enamel paint over a coat or red oxide primer by spray painting, including reassembleing & refixing of all parts etc complete all as specified and directed .
313Taking out corroded body & frame of Refrigerator of 165 LitresCapacity & replacing refrigerator body with MS/CRCA sheet 20 gauge duly painted with 2 coats of synthetic enamel paint over a cot of red oxide primer by spray painting including reassembling and refixing all the parts etc complete all as specified and directed.
314All as per item No. 248 above but for Refrigerator more than 165 Litres but upto 310 LtrCapacity
315Replacement of fan motor of water cooler up to150 Ltr capacity including testing etc complete all as specified and directed.
316Replacement of fan blades ofmotor for water cooler upto 150 Ltr capacity including testing etc complete all as specified and directed
317Supply only starting capacitor 60 to 80 MFD complete all as specified and directed.
318Supply only starting capacitor 80 to 100 MFD complete all as specified and directed.
319Supply only starting capacitor 100 to 120 MFD complete all as specified and directed.
320Supply only running capacitor of 55 MFD complete all as specified and directed.
321S&F in repairs of starting capacitor 60 to 80 MFD complete all as specified and directed.
322S&F in repairs of starting capacitor 80 to 100 MFD complete all as specified and directed.
323S&F in repairs of starting capacitor 100 to 120 MFD complete all as specified and directed.
324S&F in repairs of running capacitor of 55 MFD complete all as specified and directed.
325Replacement ofrelay for Water Cooler of 60 to 150 Litre storage capacity.
326Replacement of relay for Refrigerator 165 to 310 LitreCapacity.
327Taking out existing unserviceable thermostat switch of water cooler and Supply & fix new thermostat switch for water cooler of any capacity including testing etc complete all as specified and directed.(Make:INDOFOSS/RANUTRAL)
328Taking out existing unserviceable thermostat switch of refrigerator and supply & fix new thermostat switch for refrigerator of any capacity including testing etc complete all as specified and directed. (Make : INDOFOSS/RANUTRAL)
329Supply and fix in repairs blower motor capacitor 4 MFD etc complete all as specified and directed. (Make : ASIAN/KEIL/EPCOS)
330All as per item No. 264 above but 6 MFD capacitor. (Make: ASIAN/KEIL/ EPCOS)
331Taking out existing unserviceable over load relay and supply & fixnew over load relay in water cooler upto 150 ltrs capacity etc complete all as specified and directed.
332Taking out existing unserviceable door gasket and supply & fixnew doorgasket for refrigerator upto 310 ltrs capacity etc complete all as specified and directed.
333S & F in repairs sheet metal enclosure in repair with 3 pin 20 Amp earth plug & socket, also with and including single pole MCB of 20 Amps etc complete all as specified and directed.
334Taking down existing unserviceable cable on wall/ceiling and supply and lay 1100 Volt grade PVC insulated 3 core 4 Sqmm stranded copper conductor cable suitable for indoor unit to outdoor unit complete all as specified and directed.
335Supply, fixing, clamping and jointing copper tubing in replacement of3/8" dia for suction line and for liquid discharge line duly insulated with suitable insulation material for split AC including necessary soldering, flaring work, jointing, testing etc, making hole in wall for passing though pipe and making good to the disturbed surface to match with the adjoining surfaces etc complete all as specified and directed.
336Supply & lay PVC pipe 20 mm dia heavy duty including fittings to drain out condensed water of split AC including cutting of floor /wall & making good after laying of pipe to match the existing surface etc complete all as specified and directed.
337Supply& fix push cock / lift cock 15mm bore of brass, chromium plated, ISI marked in repair for water cooler of any capacity etc complete all as specified and directed.
338Supply and fix water tray made out of GI sheet 2 mm thick for water coolerany capacity with out let system connection provided with and including PVC pipe connecting to drain pipe etc complete all as specified and directed.
339Removing existing unserviceable electronic circuit control board of split AC unit upto 2 ton capacity and supply and fixing new electronic PCB & display board kit in the indoor unit including testing etc complete all as specified and directed.
340Supply only remote sensor handset suitable for split AC upto 2.0 ton capacity etc complete all as specified and directed.
341Supply and fix in repair remote sensorplate suitable for split AC upto 2.0 ton capacity etc complete all as specified and directed.
342S & F in repairs 15mm bore gun metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipes etc complete all as specified and directed.
343S & F in repairs 15mm bore ball brass valve high pressure with polythene float & fly nut screwed for iron pipes etc complete all as specified and directed.
344Supply only refrigerant (R-22) gas as per requirement complete all as specified and directed.
345Supplying, installing, testing and commissioning castiron body, ISI marked,BUTTERFLY VALVE as per IS 13095, ISI Marked with necessary fittings as perspecification. Details : The Butterfly valve shall suitable for waterworks and tested to minimum of 20 kg/cm2 pressure. The body shall of cast iron conforming to IS:210 in circular shape and of high strength to take the minimum water pressure of 10kg/cm2 . The disk shall be heavy duty cast iron with anticorrosive epoxy or nickel coating Make- Audco/Kirloskar/Honeywell Note : i) The valve seat shall be of high grade elastomer or nitrile rubber. The valve in closed position shall have complete contact between the seat and the disc thoughout the perimeter. the elastomer rubber shallhave a long life & shall not give away on continuous water pressue. The shaft shall be on EN 8 grade carbon steel. ii) the valve shall be fitted between two flanges on upper side of pipe flanges. The valve edge rubber shall be projected outside such that they are wedged within the pipe flanges toprevent leakages.iii) The valves shall be suppied with manual gear operated openin/closing system by lever.
346a)150mm dia
347b)100 mm dia
348c)80 mm dia
349d)65 mm dia
350Supply and fixing in repair of Y stainer with necessary fittings, flanges, nut bolts etc as per specification. The "Y" type strainer shall have cast iron body confirming to IS 210 FG 200 Perforaed sheet shall be of brass or strain less steel 304. The Screen open area shall be minimum Four times cross sectional area at inlet. The Strainer shall be suitable for MIN. flow of 300 LPM at10kg/cm2 sq pressure. The flanges shall be to IS 1538. The nut bolt sand washers shall be galvanised confirming too IS 1367. The pressure loss shall not be more than 0.5 kg/cm2 sq. The Hydraulic Testing shall done at21kg/cm sq for the duration of Two hours of the following sizes
351a)150mm dia
352b)100 mm dia
353Supply &fixingin repair presure gauge glycerine filled with 15mm inlet connection dial size 100 mm of pressure range 0.21Kg/cm sq. with 15mm isolation valve with G.I. nipple all as specified
354Supply and fixing in repairpressure switches with adjustable pressure range from 1 to 10 bar with 15mm isolation valve with GI Nipple all as specified.
355Supply and fixing in repair approved quartezoid bulb 15mm dia sprinkler pendent type , IS 15106 chrome plated crossette plate, with temperature rating 68 degree with universal deflector as approved by T.A.C complete with all necessary connections complete all as specified and directed.
356All as per item No284but with temperature rating 79 degree
357Supply and fixing in repairs bronze Orifice with 12mm thick disc with tag on plate mentioning dia of orifice for sprinkler system to control the pressure including rubber gasket packing, bolts, nuts washers all complete as per specified and directed
358S&F ball valve with brass spindle of 25mm dia complete all as specified
359S&F ball valve with brass spindle of 50 mm dia complete all as specified
360Supply and Fix in repairs outside hose box cabinet made out of 18 gauge MH sheet of size as per site reqirement but not less than 800mm X 600nun X 250mm with double leafed glazed shutters (glazed with 4mm thick transperent fiber sheet) and door frame made out of 16 guage MS sheet painted fire red outside and brilliant white inside and concealed in wall complete all as specied and directed for housing two number RRL hose each 15m long, one number branch pipe with nozzle , first aid hose and single outlet hydrantvalve etc and must have the legend " FIRE HOSE" painted prominently in graphic style and all as specified and directed
361Supply and Fix in repairs internal hose box cabinet made out of 18 gauge MH sheet of size as per site reqirement but not less than 800 mm x 600mm x 250mmwith double leafed glazed shutters (glazed with 4mm thick transperent fiber sheet) and door frame made out of 16 guage MS sheet painted fire red outside and brilliant white insidefixed on wall completeall as specied and directed for housing two number RRL hose each 15m long, one number branch pipe with nozzle , first aid hose and single outlet hydrantvalve etc and must have the legend " FIRE HOSE" painted prominently in graphic style and all as specified and directedall as specied and directed.
362Supply and Fix in repairs fire fighting RRL hose pipe of 63mm, ISI marked, IS 636(type A),15m long fitted with male and female stainless steel coupling ISI marked, IS 903 complete all as specied and directed.
363Supply and Fix in repairs stainless steel branch pipe with nozzle suitable for 63 mm dia RRL hose pipe, ISI marked, complete all as specied and directed.
364Supply and Fix in repairs stainless steel fire hydrant adapter suitable for fire hydrant landing valve63 mm dia ISI marked with suitable chain that connects valve and adapter, complete all as specied and directed
365Supply and Fix in repairs stainless steel Shut on/offnozzle of size 20mm with complete all as specied and directed
366Supply and Fix in repairs fire hydrant landing valve GM single outlet hydrant morris pattern oblique type 63 mm size confirming to IS 5290 with PVC blank cap and MS or GI chain in an approved manner.
367Supply and Fix in repairs two way fire brigade inlet, ISI marked, IS 5290, with non return valve, of gun metal size 63mm dia and including all fixing accessories complete all as specified and directed.
368Supply and Fix in repairs four way brigade inlet, ISI marked, IS 5290,with non return valve of gun metal size 63mm dia and including all fixing accesorries complete all as specified and directed.
369Repair and maintenance ofof Diesel driven fire pump set, 100 HP horizontal end suction, centrifugal type with CI casing , stainless steel impeller and stainless steel shaft mounted on heavy duty bearings suitable for continuous operation of 440 V , 3 phase, 50 Hz AC supply 90 m Head. 2280 LPM discharge, disassemble and check machine assembly , Clean up the carbon deposits in the combustion chamber,exhaust pipe and muffler, Measure the quantum of wear and tear in the cylinder and change the piston ring and cylinder liner, Check the concurrence between the connecting rod bearing and the crankshaft main bearing, replace the bearing, check the axial concurrence of the camshaft and crankshaft, and acclimate , Check the miserliness of the stopcock seat and grind, Clean the cylinder block, oil painting visage and oil painting strainer, Clean the dirt on the heat exchanger and machine water tank, and check the function of the thermostat. ,Remove the pump, clean and change the oil painting; remove the dirt, Perform a pressure test of 1.5 times the rated outlet pressure of the channel affair system,complete paint the machine assembly, complete all as specified and directed.
370M & L for repair, testing & commissioing of electric motor driven fire pump set, horizontal Split case type capable of delivering 2280 LPM of water at head 90 metre head with pump casing of cast iron of grade FG 2000 conforming to IS including impellar, sleeve, wearing ring of gun metal stainless steel impeller, stainless steel shaft, flexible coupling, coupling guard base frame, mechnical sealed bearing squirrel cage AC induction motor, 1480 RPM, continuous duty, 415 V +/- 10% ,50 HZ ,3 Phase, AC having 75 HP rating, painted with two coats paint over a coat of primer and Material & Labour for rewinding ofelectric motor 3 phase, 50 Hz, 415 Volts 75 HP comprising of undermentioned activities for motors of the following capacities complete all as specified and directed :- (i) Disconnecting and removing electric motor from installed position, loading and unloading into motor vehicle and transporting to nearest workshop; (ii) Dismantling existing burnt winding from motor,cleaning of rotor and rewinding complete withsuper enamelled copperwinding wire of existing gauge including insulation material as required; iii) Bringing back electric motor duly rewinded including loading and unloading, transporting from workshop to site of work including making necessary electric connections, commissioning and testing in actual working condition for 8 hrs continuously to check RPM, Ampere, load and overall performance ; (iv) Replacement of worn out ball bearings - 02 Nos. for each motor as per existing size and make,complete all as specified and as directed.
371Repair and maintenance of electric motor driven jockey fire pump set, vertical capable of delivering 180 LPM of water at head 70 metre head with pump casing of cast iron o including impellar, sleeve, mechnical sealed bearing to 1500 RPM, continuous duty, 415 V +/- 10% ,50 HZ ,3 Phase, AC having 7.5 HP rating painted with two coats paint over a coat of primer andMaterial & Labour for rewinding ofelectric motor 3 phase, 50 Hz, 415 Volts 7.5 HP comprising of undermentioned activities for motors of the following capacities complete all as specified and directed :- (i) Disconnecting and removing electric motor from installed position, loading and unloading into motor vehicle and transporting to nearest workshop; (ii) Dismantling existing burnt winding from motor,cleaning of rotor and rewinding complete withsuper enamelled copperwinding wire of existing gauge including insulation material as required; iii) Bringing back electric motor duly rewinded including loading and unloading, transporting from workshop to site of work including making necessary electric connections, commissioning and testing in actual working condition for 8 hrs continuously to check RPM, Ampere, load and overall performance ; (iv) Replacement of worn out ball bearings - 02 Nos. for each motor as per existing size and make,complete all as specified and as directed.
372Repair and maintenance of fire servicebooster pump multi stage having 900 LPM at 36 mtrs head ,horizontal split casing running at 2900 RPM coupled withAC induction motor including servicing by replacing unserviceable items of gland packing, bearings, gaskets, nuts, bolts and charging lubricants for smooth runningincluding painting of pumpset, base frame and pipe lines upto inside pumproom of approved colour after preparation of existing surfaceand Material & Labour for rewinding ofelectric motor 3 phase, 50 Hz, 415 Volts 7.5 HP comprising of undermentioned activities for motors of the following capacities complete all as specified and directed :- (i) Disconnecting and removing electric motor from installed position, loading and unloading into motor vehicle and transporting to nearest workshop; (ii) Dismantling existing burnt winding from motor,cleaning of rotor and rewinding complete withsuper enamelled copperwinding wire of existing gauge including insulation material as required; iii) Bringing back electric motor duly rewinded including loading and unloading, transporting from workshop to site of work including making necessary electric connections, commissioning and testing in actual working condition for 8 hrs continuously to check RPM, Ampere, load and overall performance ; (iv) Replacement of worn out ball bearings - 02 Nos. for each motor as per existing size and make,complete all as specified and as directed.
373M & L for repair, testing & commissioning of Motor Control Centre (MCC) cum control panel for auto operation of all pumps in fire pump house. Repair shall be carried out as per motor rating of pumps & as per control logic for operation of pumps in auto mode complete all as specified and directed.
374Material and labour for replacement of un serviceable timer of starter, range 9 to 30 sec adjustable type voltage 415 V all as specified and directed by Engr-in- Charge.
375Material and labour for repalcement of un serviceable single phase preventer , 415 V 50Hz including electric connection all as specified and directed by Engineer-in-Charge.Make Minilec.
376S&F in repair MPCB (motor protection circuit breaker), 3 Phase, 415 Volts, 50 Hz, contractor type - MO 50 suitable of 75/100 HP pumps complete all as specifed and directed Make- L&T/Schneider/Siemens
377S&Fin repair soft starterModel No CSXi-030-41, 3 Phase 60 Amp with auxiliary 30 VDCfor withstanding current 5000A RMS 575 V AC Maximum in panels with proper wiring complete all as specified and directed. Make L&TModel No CSXi-030-41 or ABB/Schneider
378Supply and fix in repair barrel type HRC Fuse 2 to 32 Amps complete all as specifed
379Supply and fix in repair barrel type HRC Fuse 40 to 63 Amps complete all as specifed
380Supply and fix in repair maintenance free SMF type lead acid battery duly charged 12 Volts, 24 Ah complete all as specifed. Make- Exide/Amron
381Supply and fixin repairs Foot valve cast iron body both ends flanged suitable for 150mm bore CI pipeconnection all as specified and directed Make -Kirloskar/Kartar/SIR/AUDICO
382S&F in repairy analogue addressable multisensor detector (Photo + Thermal) with base with galvanised steel, back box and all mounting accessories complete as specifed and directedMake- GE Edwards Model: SIGA-PHS+SB or equivalent siemens/ system sensor/Safex
383S&F in repair analogue addressable heat detector, with galvanised steel back box all mounting accessories complete as specifed and directedMake- GE Edwards Model: SIGA-PHS+SB or equivalent siemens/ system sensor/Safex
384S&F in repair addressable Dual Action Manual Pull staions inside for providing MS box of suitable size for concealing the manual call point in the wall and with mounting accessoriesall as specified Make- GE Edwards Model: SIGA-270 or equivalent siemens/ system sensor/Safex
385S&F in repair addressable Monitor Modules in a suitable gavanised steel junction box with mounting accessoriesall as specified Make- GE Edwards Model: SIGA-CT1 or equivalent siemens/ system sensor/Safex
386S&F in repair addressable controlModulefor Hooter in a suitable gavanised steel junction box with mounting accessoriesall as specified Make- GE Edwards Model: SIGA-CR or equivalent siemens/ system sensor/Safex
387S&F in repair Electronic Hooterinclude provide MS box suitable size for concealing the hooter in the wall mounting accessories all as specified Make- GE Edwards Model: R HD or equivalent siemens/ system sensor/Safex
388Manual rescue and operation rescue of Electric supply installations round the clock inthree shifts each shift 8 hrs (Shifts : 1st shift : 0600 to 1400 hrs, 2nd shift : 1400 to 2200 hrs, 3rd shift : 2200 to 0600 hrs)including Sunday & holiday by employing one skilled Electrician (having knowledge of HT VCB, Transformers, APFC & LT Panels) in each shift at Main Receiving Station at MO (MB) Ghatkopar including operating HT & LT panels, carrying out break down maintenance in transformer, HT,LT Panels cables etc, daily cleaning and upkeep of surrounding area of installation and Maintaning record of daily Break Down & maintenace, Monitoring & Recording of parameters such as Voltage, Current, PF etc Powerfactor atMRS, at MO (MB) Ghatkopar all as specified and as directed by Engineer-in-Charge. Note: (a) All the T&P required for the Manual rescue & Operation rescue of installations shall be provided by the contractor and cost of the same is inclusive of quoted rate (b) Materials required for upkeep of installations such asrooms, dusty cloth for cleaning of plants, buckets, etc shall bealways available at the installations for use and shall be deemed to be included in the quoted rates. (c) The Contractor should prepare duty chart on monthly basis and shall be got approved by Engineer-in-Charge. (d) Attendance register shall be submitted to Engineer-in-Charge on Daily basis. (e) In case any operator is missing or absent from duty, a penalty of Rs 2000/- per technician shall be recovered from contractor and Engineer-in-Charge decision shall be final and binding on this account. (f) To provide uniform, tools & plants, safety means like glove etc to the employees and also alternative employee (reliever) for Manual rescue and operation rescue of Installation so that the other employees can avail the facility of weekly leave etc. (g)To keep the installation & allied area in clean and tidy condition during the operation period. (h)To carryout the routine maintenance, minor repairs, oiling, greasing and to rectify the minor defects to keep the plants / Installation in serviceable condition all as directed by the GE and Engineer-in-Charge.However, the major repairs, replacements, overhauling, topping-up oil etc are not included in the scope of the above items. (j)To keep necessary documentation duly signed by all the concerned. (k) To hand over the entire substaion E/M machenaries in serviceable condition at the time of completion. (l)To keep first aid kit in all duty sub station.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail