}

Calibration Of Electrical Items On Orv Sindhu Sadhana => Limited, visakhapatnam-Andhra Pradesh

Hindustan Shipyard Limited has published Calibration Of Electrical Items On Orv Sindhu Sadhana => Limited. Submission Date for this Tender is 09-02-2024. Electrical Products Tenders in visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41561321
Corrigendum : Calibration Of Electrical Items On Orv Sindhu Sadhana => Limited
Limitted
Indian
Andhra Pradesh
visakhapatnam
09-02-2024

Tender Details

Calibration Of Electrical Items On Orv Sindhu Sadhana -All Cold Room Temperature Digital Control Meter In Galley To Be Calibratedscope Of The Work Involves Calibration, Trial & Testing 2 All Cold Room Temperature Digital Control Meter In Galley.Renew If Found Defective ( Procure, Supply And Fitment ) . Make: Artech Temperature Controller. 3 Scientific Cold Store Temperature Control To Be Calibrated.Scope Of The Work Involves Calibration, Trial & Testing 4 Scientific Cold Store Temperature Control.Renew If Found Defective ( Procure, Supply And Fitment ) . 5 Hot Water Boilermake : Euro Boilergarioni Naval, Model : Npr 407, Burner Type : Riello, Model : Rl 50Boiler To Be Cleaned, Burner Motor To Be Overhauled With New Bearing, Solenoid, Ignition Transformer, Electrode, Comb. Controller & Air Gate Valve To Be Checked For Its Proper Operation. If Any Of The Above Is Found Defective, Same Need To Be Renewed With New Spare. Boiler Should Be Made Operational Along With Safeties. 6 Components / Items / Spares / Materials: For Executing Of The Above Mentioned Job, Contractor Has To Procure, Supply All Items And Fitted In Its Place. Contractor Has To Quote Lumpsum Cost For Required Components / Items / Spares / Material Mentioned At Sl.No.5 For Above Scope Of Work. The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For This Line Item For Satisfactory Completion Of The Specified Sow. Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Sl. No. 6 Against Third Party / Oem Invoice. 7 Heat Recovery System Temperature Controllermake: Clorius, Model: Er2000scope Of The Work Involves Calibration, Trial & Testing 8 Heat Recovery System Temperature Controllermake: Clorius, Model: Er2000renew If Found Defective ( Procure, Supply And Fitment ) . 9 Installation Of Buzzer Systemscope Of Work Involves Installation & Testing Of 2 Way Buzzer With Light System & Cable ( Marine Grade ) From Winch Control Room To I ) Ctd Area ( Approx. 50M. ) Ii ) Aft A-Frame ( Approx. 100M. ) 10 Components / Items / Spares / Materials: For Executing Of The Above Mentioned Job, Contractor Has To Procure, Supply All Items And Fitted In Its Place. Contractor Has To Quote Lumpsum Cost For Required Components / Items / Spares / Material Mentioned At Sl.No.9 For Above Scope Of Work. The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For This Line Item For Satisfactory Completion Of The Specified Sow. Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Sl. No. 10 Against Third Party / Oem Invoice. => Limited

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 18-Jan-2024 DUE DATE EXTENSION Date 22-01-2024
2 22-Jan-2024 DUE DATE EXTENSION 2 Date 25-01-2024
3 25-Jan-2024 DUE DATE EXTENSION 3 Date 01-02-2024
4 01-Feb-2024 DUE DATE EXTENSION 4 Date 05-02-2024
5 05-Feb-2024 DUE DATE EXTENSION 5 Date 09-02-2024

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name / Description:Calibration of Electrical items on ORV SINDHU SADHANA
Sl. No. Item Description
1All Cold Room Temperature Digital Control Meter in Galley to be calibrated Scope of the work involves calibration, trial & testing
2All Cold Room Temperature Digital Control Meter in Galley. Renew if found defective (Procure, Supply and fitment). MAKE: ARTECH TEMPERATURE CONTROLLER.
3Scientific Cold store temperature control to be calibrated. Scope of the work involves calibration, trial & testing
4Scientific Cold store temperature control. Renew if found defective (Procure, Supply and fitment).
5HOT WATER BOILERMake : Euro BoilerGARIONI NAVAL, Model : NPR 407, Burner Type : RIELLO,Model : RL 50 Boiler to be cleaned, Burner motor to be overhauled with new bearing, solenoid, Ignition transformer, Electrode, Comb. Controller & Air gate valve to be checked for its proper operation. If any of the above is found defective, same need to be renewed with new spare. Boiler should be made operational along with safeties.
6Components / Items / Spares / Materials: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Components / Items / Spares / Material mentioned at Sl.No.5 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item"" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 6 against third party/OEM invoice.
7Heat Recovery System Temperature Controllermake: CLORIUS, model: ER2000 Scope of the work involves calibration, trial & testing
8Heat Recovery System Temperature Controllermake: CLORIUS, model: ER2000 Renew if found defective (Procure, Supply and fitment).
9Installation of BUZZER SYSTEM Scope of work involves installation & testing of 2 way buzzer with light system & cable (Marine grade) from winch control room to i) CTD area (approx. 50m.) ii) Aft A-frame (approx. 100m.)
10Components / Items / Spares / Materials: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Components / Items / Spares / Material mentioned at Sl.No.9 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item"" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 10 against third party/OEM invoice.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail