|
| 1 | 11/0.4 kV, 63KVA Sub Station |
| 2 | Distribution Transformer11/0.4 kV, 63KVA (New) |
| 3 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 4 | Muffs with concerete filling |
| 5 | X-Arm: [Channel Iron (100x50x6 mm), Length : (2800 mm X 2 Nos] for incomer line |
| 6 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s |
| 7 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] forsupporting DO fuse unit & GO switch |
| 8 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] forTransformer Bed |
| 9 | X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos forsupporting Main Channel of Transformer] |
| 10 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 11 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 12 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed KneeBracing |
| 13 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 14 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 15 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length :460 mm |
| 16 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 17 | D.O Fuse Unit |
| 18 | Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 19 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 20 | Stay set complete |
| 21 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 22 | Pipe Earthing Set |
| 23 | LT Distribution Panel Box with MCCB |
| 24 | Half Clamp (M.S. Flat 50X6 mm) |
| 25 | Full Clamps (M.S. Flat 50X6 mm) |
| 26 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm F or more(with flat and spring washers)] |
| 27 | Aluminium Thimble |
| 28 | Aluminium Thimble |
| 29 | Danger Plate |
| 30 | Barbed Wire |
| 31 | LT Cable (3.5 Core) 35 mm2 |
| 32 | LT switch capacitor 9KVAr for 63 KVA |
| 33 | Aluminium Paint |
| 34 | Energy Meter 3-Phase, 3/4-Wire (DLMS Compliant) CT type for 63KVA transformer duly checked/certified by M&T |
| 35 | Fencing work |
| 36 | LT Line |
| 37 | Prov.AAAC 7/3.15 mm sq. (50 mm sq.) {Includes 3 conductor lengths for 3 phase and additional 3% (sag,Jumpering wastage} |
| 38 | Steel Tubular Poles (8 mtr, ) |
| 39 | Muffs with concrete filling |
| 40 | Stay set complete |
| 41 | Stay wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 42 | Full Clamp for stay |
| 43 | MS Channel iron: 75x75x6mm2 Length (1.50mtr + 0.02mtr) |
| 44 | Shackle Insulator |
| 45 | D -Iron |
| 46 | Earth wire (GI 8SWG) for earthing |
| 47 | Earthing Set complete |
| 48 | Nut & Bolts |
| 49 | Earth Knob |
| 50 | Aluminium Paint |
| 51 | Spiral PVC Spacer |
| 52 | Erection charges |
| 53 | Transportation charges |
| 54 | GST on Erection & Transportation |
| 55 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Other materials like Stay set , stay wire, d-Iron, shackel,spacer etc. will be provided bythe HPSEBL Store. |