Annual Rate Contract For Supply Of Chemicals, Glassware, Plasticwares, And Crucible Etc , Sigma Aldrich ( Laboratory Chemical ) , Thermo Fisher ( Laboratory Chemical ) , Bio-Rad ( Laboratory Chemical ) , B.D. Biosciences ( Laboratory Chemical ) , Loba ( Laboratory Chemical ) , Cdh ( Laboratory Chemical ) , Srl ( Laboratory Chemical ) , Alpha-Aesar ( Laboratory Chemical ) , S.D. Fine ( Laboratory Chemical ) , Banglore Genei ( Laboratory Chemical ) , Medox ( Laboratory Chemical ) , Genex ( Laboratory Chemical ) , Across Organic ( Laboratory Chemical ) , Avra Synthesis ( Laboratory Chemical ) , Chemscene ( Laboratory Chemical ) , Chemsworth ( Laboratory Chemical ) , Thoms Baker ( Laboratory Chemical ) , Borosil ( Plasticware, Glasswares And Misc. ) , Corning ( Plasticware, Glasswares And Misc. ) , Dewsil ( Glasswares And Misc. ) , Perfit ( Glasswares And Misc. ) , Abds ( Glasswares And Misc. ) , Vwr ( Laboratory Chemical, Plasticware, Glasswares And Misc. ) , Jaisboo ( Glasswares And Misc. ) , Tarson ( Plasticware ) , Polylab ( Plasticware ) , Ant-Ceramics ( Crucibles / Boat ( Silica, Alumina, Quartz ) ) , 48F Joint Enclosure , 19 “ Rack, Wallmount 530 Mm Depth, 6U Height, Front Glass / Venteddoor ( Lockable ) And Side Panel Can Open , 19 “ Rack, Wallmount 530 Mm Depth, 9U Height, Front Glass / Vented Door ( Lockable ) , And Sidepanel Can Open , 19 “ Rack, Wallmount 530 Mm Depth, 9U Height, Front Glass / Vented Door ( Lockable ) , And Sidepanel Can Open , 19“ Rack, Floor Mounted, 19 Sever / Networking Rack Cabinet ( 600*800* ) , 24 U Height, Front Glass / Vented Door ( Lockable ) , 19“ Rack, Floor Mounted, 19 Sever / Networking Rack Cabinet ( 600*800* ) , 42 U Height, Front Glass / Vented Door ( Lockable ) , 25 Mm Pvc Conduit / Casing ( 100 Mtr ) , 32 Mm Pvc Conduit / Casing ( 100 Mtr ) , 40 Mm Hdpe Pipe ( 200 Mtr ) , 50 Mm Hdpe Pipe ( 200 Mtr ) , Supply Of 1Diameter Gi Pipe ( 100 Mtr ) , Sfp-Sm-1G , Sfp-Sm-10G , Sfp-Mm-1G , Sfp-Mm-10G , Route Survey & Documentation For Laying Of Utp & Fiber Cable Along With Detailed Cable Route Diagram, Rack Position, Cable Length From Each Node To Switch, Identification Of Switch Location With Labels & Route Marking As Per Standard And Approved Labelling Plan Etc On Per Node Basis , Laying Of Utp Cat6 Cable Inside Building / Premises , Fixing Of Pvc Conduit , Installation Of Jack Panel & End-To End Connectivity Of Utp Cat6 Cable On Jack Panel , Installation Of Information Outlet Points , Testing Of Laid Cable , In Building Laying Of Fiber In Duct / Conduit , Laying Of Fiber Outside Building Location Point To Point Connectivity ( Per Meter ) , Excavation And Resurfacing Of Soil , Excavation And Resurfacing Of Concrete- , Excavation Under Road Crossing-Trenchless , Installation / Fixing Of 1Diameter Gi Pipe Underground And On Surface , Laying & Installation Of Hdpe Pipe , Splicing Of Fiber Cable Including Pigtail , Cable Pulling Pit Made Of Reinforced Concrete And Brickwalls With Removable Covers , Performance Testing Of Laid Fiber Optic Cable For Continuity, Length &Db Loss As Per Eia / Tia455-60 Document For Fo Test Procedure 7 Documentation Of The Result , Pentascanning , Otdr Scanning And Report ( Per Connectivity Pair ) , Installation Of Rack- Upto 12 U , Fiber Chamber Installation , ( Complete Work , As Per Scop Of Work ( Annexure-Iii )