Airports Authority Of India has published Tender For Construction Of Residential Quarters For Aai Staff, Cisf Barracks At Srinagar Airport.. Submission Date for this Tender is 01-02-2024. Building Work Tenders in srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Jan-2024 | Corrigendum - I and Query Reply | Other | 29-01-2024 |
2 | 25-Jan-2024 | Corrigendum - II | Date | 01-02-2024 |
Sl. No. | Item Description |
1 | ConstructionoftheProject/WorkontheSite as setforthinScheduleAandas specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document |
2 | Demolishing of existing Structures/Buildings/Infra falling under Project site or any other structure falling in proposed work are including foundation/electrical item etc, by manually/ mechanical means, on as and where basis and taking away of dismantled/demolished material beyond AAI premises including disposal of un-servicable material and clearing of site as per direction of Engineer - in - charge. Note: The above structures shall be handed overby EIC in phases for demolition and subsequent disposal. The salvage material shall become the property of agency and item to be quoted & executed as a credit item.(Quoted rate shall be reflected in negative(credit) automatically in Amount column) |
3 | Maintenance of the Constructed Project in accordance with the provisions of this Tender Document and in conformity with the requirements set forth in Schedule-N Performance, SCC for operation and AICMC and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document (quoted rate shall be firm and fixed for operations and AICMC) |
4 | Operational and Service Charges including preventive maintenance, annual maintenance andmaintaining all horticulture works constructed under the project for 02 years. |
5 | 1st Year (During DLP) |
6 | 2nd Year(During DLP) |
7 | Providing manpower for Operation & routine maintenanceof DG sets,Substation equipments, Internal & external electrical installation,Fire Fighting, Fire alarm System , WTP, STP ,RO,PAVA,Solar water heating and Solar power system, VRV / VRFsystems,Ventilation systems, Smoke extraction system, Building Management System (BMS) associated equipments and any other system/equipment specified in technical specification and DBR except Liftetc.as provided under the main contract, as per standard OEM recommendations , maintenance schedules & practices as per manpower schedule for three shift mentioned in special conditions of contract(MEP) for 07 years including Defect liability period of 02 Years (24x7x365 days) as specified in special SCC for Operation & AICMC |
8 | 1st Year(During DLP) |
9 | 2nd Year (During DLP) |
10 | 3rd Year (After DLP) |
11 | 4th Year (After DLP) |
12 | 5th Year (After DLP) |
13 | 6th Year (After DLP) |
14 | 7th Year (After DLP) |
15 | All inclusive Comprehensive Maintenance of all Lifts and associated equipments,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance, required material etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years. |
16 | 3rd Year (After DLP) |
17 | 4th Year (After DLP) |
18 | 5th Year (After DLP) |
19 | 6th Year (After DLP) |
20 | 7th Year (After DLP) |
21 | All inclusive Comprehensive Maintenance of substation equipments Tranformer, DG sets, UPS, Internal & External Electrical works associated equipments and any other system/equipment not covered in other BOQ item,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required materialetc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years. |
22 | 3rd Year (After DLP) |
23 | 4th Year (After DLP) |
24 | 5th Year (After DLP) |
25 | 6th Year (After DLP) |
26 | 7th Year (After DLP) |
27 | All inclusive Comprehensive Maintenance ofFire fightingsystem, Fire Alarm,Gas suppression SystemWater Treatment Plant (WTP) , STP, Water Supply system including hydro pneumatic system, Water treatment plant including pumps, RO system, Water drinking fountainand all other associated equipment etc associated equipments etc.,as provided under the main contract, as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required materialetc. as required as per good engineering practice, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years. |
28 | 3rd Year (After DLP) |
29 | 4th Year (After DLP) |
30 | 5th Year (After DLP) |
31 | 6th Year (After DLP) |
32 | 7th Year (After DLP) |
33 | All inclusive Comprehensive Maintenance of PAVA, CCTV, LAN package,associated equipments etc.,as provided under the main contract,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required materialetc. as required as per good engineering practice, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years. |
34 | 3rd Year (After DLP) |
35 | 4th Year (After DLP) |
36 | 5th Year (After DLP) |
37 | 6th Year (After DLP) |
38 | 7th Year (After DLP) |
39 | All inclusive Comprehensive Maintenance ofVRV / VRFsystems,Ventilation systems, Smoke extraction system, Building Management System (BMS) and all other associated equipment etc.,as provided under the main contract,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required material etc. as required as per good engineering practice, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 Years after Defect liability period of 02 Years. |
40 | 3rd Year (After DLP) |
41 | 4th Year (After DLP) |
42 | 5th Year (After DLP) |
43 | 6th Year (After DLP) |
44 | 7th Year (After DLP) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail