Tender For Construction Of Residential Quarters For Aai Staff, Cisf Barracks At Srinagar Airport., srinagar-Jammu And Kashmir

Airports Authority Of India has published Tender For Construction Of Residential Quarters For Aai Staff, Cisf Barracks At Srinagar Airport.. Submission Date for this Tender is 01-02-2024. Building Work Tenders in srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

41480981
Corrigendum : Tender For Construction Of Residential Quarters For Aai Staff, Cisf Barracks At Srinagar Airport.
Open Tender
Indian
Jammu And Kashmir
srinagar
01-02-2024

Tender Details

Tender For Construction Of Residential Quarters For Aai Staff, Cisf Barracks At Srinagar Airport.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 16-Jan-2024 Corrigendum - I and Query Reply Other 29-01-2024
2 25-Jan-2024 Corrigendum - II Date 01-02-2024

Key Value

Document Fees
INR 11800 /-
EMD
INR 20100000.0 /-
Tender Value
INR 176.05 Crore /-

BOQ Items

Name of Work: Construction of Residential Quarters for AAI Staff, CISF Barracks at Srinagar Airport.
Sl. No. Item Description
1ConstructionoftheProject/WorkontheSite as setforthinScheduleAandas specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document
2Demolishing of existing Structures/Buildings/Infra falling under Project site or any other structure falling in proposed work are including foundation/electrical item etc, by manually/ mechanical means, on as and where basis and taking away of dismantled/demolished material beyond AAI premises including disposal of un-servicable material and clearing of site as per direction of Engineer - in - charge. Note: The above structures shall be handed overby EIC in phases for demolition and subsequent disposal. The salvage material shall become the property of agency and item to be quoted & executed as a credit item.(Quoted rate shall be reflected in negative(credit) automatically in Amount column)
3Maintenance of the Constructed Project in accordance with the provisions of this Tender Document and in conformity with the requirements set forth in Schedule-N Performance, SCC for operation and AICMC and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document (quoted rate shall be firm and fixed for operations and AICMC)
4Operational and Service Charges including preventive maintenance, annual maintenance andmaintaining all horticulture works constructed under the project for 02 years.
51st Year (During DLP)
62nd Year(During DLP)
7Providing manpower for Operation & routine maintenanceof DG sets,Substation equipments, Internal & external electrical installation,Fire Fighting, Fire alarm System , WTP, STP ,RO,PAVA,Solar water heating and Solar power system, VRV / VRFsystems,Ventilation systems, Smoke extraction system, Building Management System (BMS) associated equipments and any other system/equipment specified in technical specification and DBR except Liftetc.as provided under the main contract, as per standard OEM recommendations , maintenance schedules & practices as per manpower schedule for three shift mentioned in special conditions of contract(MEP) for 07 years including Defect liability period of 02 Years (24x7x365 days) as specified in special SCC for Operation & AICMC
81st Year(During DLP)
92nd Year (During DLP)
103rd Year (After DLP)
114th Year (After DLP)
125th Year (After DLP)
136th Year (After DLP)
147th Year (After DLP)
15All inclusive Comprehensive Maintenance of all Lifts and associated equipments,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance, required material etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years.
163rd Year (After DLP)
174th Year (After DLP)
185th Year (After DLP)
196th Year (After DLP)
207th Year (After DLP)
21All inclusive Comprehensive Maintenance of substation equipments Tranformer, DG sets, UPS, Internal & External Electrical works associated equipments and any other system/equipment not covered in other BOQ item,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required materialetc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years.
223rd Year (After DLP)
234th Year (After DLP)
245th Year (After DLP)
256th Year (After DLP)
267th Year (After DLP)
27All inclusive Comprehensive Maintenance ofFire fightingsystem, Fire Alarm,Gas suppression SystemWater Treatment Plant (WTP) , STP, Water Supply system including hydro pneumatic system, Water treatment plant including pumps, RO system, Water drinking fountainand all other associated equipment etc associated equipments etc.,as provided under the main contract, as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required materialetc. as required as per good engineering practice, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years.
283rd Year (After DLP)
294th Year (After DLP)
305th Year (After DLP)
316th Year (After DLP)
327th Year (After DLP)
33All inclusive Comprehensive Maintenance of PAVA, CCTV, LAN package,associated equipments etc.,as provided under the main contract,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required materialetc. as required as per good engineering practice, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 years after Defect liability period of 02 Years.
343rd Year (After DLP)
354th Year (After DLP)
365th Year (After DLP)
376th Year (After DLP)
387th Year (After DLP)
39All inclusive Comprehensive Maintenance ofVRV / VRFsystems,Ventilation systems, Smoke extraction system, Building Management System (BMS) and all other associated equipment etc.,as provided under the main contract,as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance,required material etc. as required as per good engineering practice, instructions of Engineer-in-Charge and as per terms and conditions specified in special SCC for Operation & AICMC, for 05 Years after Defect liability period of 02 Years.
403rd Year (After DLP)
414th Year (After DLP)
425th Year (After DLP)
436th Year (After DLP)
447th Year (After DLP)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail