}

Tender For Supply Of Back Clamp And Stay Clamp Suitable For 8Mtr Psc Pole, pudukkottai-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Supply Of Back Clamp And Stay Clamp Suitable For 8Mtr Psc Pole. Submission Date for this Tender is 17-01-2024. Clamps Tenders in pudukkottai Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

41344650
Tender For Supply Of Back Clamp And Stay Clamp Suitable For 8Mtr Psc Pole
Open Tender
Indian
Tamil Nadu
pudukkottai
17-01-2024

Tender Details

Supply Of Back Clamp And Stay Clamp Suitable For 8Mtr Psc Pole , Supply Of Silicagel Blue , 0.6Kva Ups , Backclamp Suitable For 8.00Mtr 200Kg Psc Pole , Stay Clamp Suitable For 8.00Mtr 200Kg Psc Pole , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Lt Brass Bushing Rod 20 Mm , Lt Brass Bushing Rod 30 Mm , Ht Bushing Rod 12 Mm , Stay Pit , In Ordinary Soil [0.95 X 0.6 X 1.2M] , Semi Rocky Soil , Stay Pit In Heavy Rocky Soil Where Blasting/ Cheseling Reqiured [Specific Approval Should Be Obtained From Concerned Ee] , Erection Of Poles & Stays (Including Refilling Of Excavated Earth) , Erection Of 7.5M / 8.0M Poles [Rcc / Psc] , Erection Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Stay Set , Erection Stay Set Complete , Stay Erection Without Rod And Pit , Replacement Of Stay Rod Only. (Including Stay Pit Excavation & Refilling & Erection) , Replacement Of Guy Shackle Only In Existing Stay , Erection Of Line Materials , Fixing Of Lt 1 Ph X Arm , Fixing Of Lt/Ht Ti Fitting , Fixing Of Lt 3 Ph X Arm , Fixing Of 3[1/2] V` X Arm , Fixing Of4[1/2] V` X Arm , Fixing Of 5 V X Arm , Fixing Of Tapping Channel / Guarding X Arm , Providing Of Line Spacers In Lt Lines 1 Phase , Providing Of Line Spacers In Lt Lines 3 Phase , Erection Of Ab Switch With Pt Insulator & Jumpering Complete , Erection Of Centre Rotating Switch Ab Switch Complete , Fixing Of Ht Pin Insulator / Strain Disc , 11 Kv Pin Insulator With Pin , 11 Kvstrain Disc / Polymer Disc With Hardware , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pinstrain Disc/Polymer Discwith Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4.09 Mm , Above 7/4.09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Throughtubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials]. , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0.6X0.6X1.25M.With Coping , Sleeve Concreting For Pole 0.6 M X 0.6M X 0.3 M With Coping , Sleeve Concreting For Stay Set 0.3 M & 0.75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0.9 X0.9 X 1.83 Mtr , Transporting Of Pole To Pit Location 2 Nos. , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set (4 Sets) , Mass Concreting (Cement:Sand:Jelly Supplied By The Contractor) 2 Nos. , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Ofhg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangementdouble , Painting Of Stru. Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts(Excluding Cost Of Paint). , Painting Of Stru. Complete Excluding Dt [One Coat Alu Paint, Excluding Cost Of Paint) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint. , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint. , Dt Metering Arrangement (Without Materials) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Rcc / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 Ws.V. Lamp / Mercury Lamp/Led Yard Light Fittingincluding Wiring, Clamping Of Pipe, Serial Board Assembling Etc. , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works. , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. , Providing Of Holes. , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt[ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt[ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Ofcoconut Tree , Clearing Tree Branches Of Neem, Tamarind, Countrytree Etc., , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site. , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7.5 Mtr / 8.0 Mtr Rcc / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Rcc /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Rcc / Metal Poles , Transporting From Road Side To Workspot , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof[ Certified By Aee ] , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof , Transport Of Line Materials , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Upto 8 Kms , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km , Transport Of Equipements , Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimumup To 30 Km , .Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimum Above 30 Km For Every Addl .1 Km , Dismantling Works , Dismantling Of 7.5M / 8.0M Poles [Rcc / Psc] , Dismantling Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Dismantling Stay Set Complete , Dismantling Of Lt 1 Ph X Arm / Lt/Ht Ti Fitting , Dismantling Of Lt/Ht Ti Fitting , Dismantling Of Lt 3 Ph X Arm , Dismantlingof 3[1/2] V` X Arm , Dismantlingof Tapping Channel And Guarding X Arm , Dismantling Of 11 Kv Strain Disc/Polymer Disc With Hardware , Dismantling Of 22 Kv Pin Insulator With Pin , Dismantling Of 22 Kvstrain Disc With Hardware , Dismantling Of 33 Kv Pin Insulator With Pin , Dismantling Of 33 Kvstrain Disc With Hardware , Dismantlingof Lt Pin Insulator With Pin , Dismantlingof Lt Shackle With Hardware , Dismantling Of Aluminium Knob , Dismantling Of Conductor7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Dismantling Of Conductoracsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Dismantling Of Conductoracsr 7/4.09 Mm , Single Phase Meter &3 Phase Meter , Fixing Of Single Phase Meter , Fixing Of 3 Phase Meter , Dismantling Of Single Phase Meter , Dismantling Of 3 Phase Meter

Key Value

Document Fees
Refer document
EMD
INR 25000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: SUPPLY OF BACK CLAMP & STAY CLAMP SUITABLE FOR 200KG PSC POLE
Sl. No. Item Description
1SUPPLY OF SILICAGEL BLUE
20.6KVA UPS
3BACKCLAMP SUITABLE FOR 8.00MTR 200KG PSC POLE
4STAY CLAMP SUITABLE FOR 8.00MTR 200KG PSC POLE
5Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr
6LT BRASS BUSHING ROD 20 MM
7LT BRASS BUSHING ROD 30 MM
8HT BUSHING ROD 12 MM
9Stay pit
10in ordinary soil [0.95 x 0.6 x 1.2m]
11semi rocky soil
12Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE]
13Erection of poles & stays (Including refilling of excavated earth)
14Erection of 7.5m / 8.0m poles [RCC / PSC]
15Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles
16Stay set
17Erection stay set complete
18Stay erection without rod and pit
19Replacement of stay rod only. (Including stay pit excavation & refilling & erection)
20Replacement of guy shackle only in existing stay
21Erection of LINE MATERIALS
22Fixing of LT 1 ph "X" Arm
23Fixing of LT/HT TI Fitting
24Fixing of LT 3 ph "X" Arm
25Fixing of 3[1/2]" " V` X " arm
26Fixing of4[1/2]" V` X " arm
27Fixing of 5" V X arm
28Fixing of tapping channel / guarding "X" arm
29Providing of line spacers in LT lines 1 phase
30Providing of line spacers in LT lines 3 phase
31Erection of AB Switch with PT insulator & Jumpering complete
32Erection of centre rotating Switch AB Switch complete
33FIXING OF HT PIN INSULATOR / STRAIN DISC
3411 KV Pin insulator with pin
3511 KVstrain disc / polymer disc with hardware
3622 KV Pin insulator with pin
3722 KV Strain disc / polymer disc with hardware
3833 KV Pin insulator with pin
3933 KV PinStrain disc/polymer discwith hardware
40Fixing of LT Pin insulator with pin
41LT Shakle with hardware
42Fixing of Aluminium knob
43Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run
44Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm
45ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm
46ACSR 7/4.09 mm
47Above 7/4.09 mm ACSR & DOG conductor
48Earthing wiring and connection including transporting of earth pipe and excavation of pit]
49Transformer structure earthing 10ft depth - 3 nos of pipe throughTubes
50DP earthing including all works [double side earthing]
51Erection of 4th Earth pipe including earthing
52Earthing of poles
53Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub.
54Replacement of detoriated earth pipe per location
55Concreting with Mixture 1:3:6 [including All materials].
56Mass Concreting for centre support for 2 feet including all materials
57Mass concreting for pole0.6x0.6x1.25M.with coping
58Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping
59Sleeve concreting for stay set 0.3 m & 0.75 long
60Erection of Distribution Transformer Structure Complete
61Excavation of structure pole Pits 0.9 X0.9 X 1.83 Mtr
62Transporting of pole to pit location 2 Nos.
63Erection of poles 2 Nos
64Excavation of stay pit 4 Nos
65Erection of stay set (4 sets)
66Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos.
67Erection of 22 KV AB Switch
68Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes
69Erection of Top Channel
70Bed Channel [2 nos channel] Erection
71Cross with stud for bed channel Erection
72Erection of belting angle / HG fuse angle
73Erection ofHG fuse Set
74Erection of HT LAS with jumpering and earthing
75Erection of LT LAS with jumbering and earthing
76Erection of Jumpering [HT Side]
77Transformer wiring in LT side including Jumpering Bus bar etc.
78Erection LT open type fuse unit arrangement single
79Erection LT open type fuse unit arrangementDouble
80Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint).
81Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint)
82Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem]
83Painting name of SS at seating channel including paint.
84Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint.
85DT metering arrangement (without materials)
86Erection of distribution Transformer /dismantling of DT
87Upto 100 KVA
88above 100 KVA and Upto 250 KVA
89500 KVA
90Colour washing of RCC / PSC poles
91Numbering of poles including cost of paint / loc [black background and yellow letters]
92Painting of SC details in the meter board / Agl boxes / Hut SCs including paint.
93SERVICE CONNECTION
94Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling
95Transporting of required materials from road side to work spot and erection of 250 WS.V. lamp / Mercury lamp/LED Yard Light Fittingincluding wiring, clamping of pipe, serial board assembling etc.
96Fixing of street light fitting with 2 CFL/ 4 CFL
97Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc.
98Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot
99Erection/dismantling of metering set 11 KV / 22 KV/33 KV
100Fabrication Works.
101Labour charges for alteration of back clamp / stay clamp to suitable for works.
102Providing of Holes.
103All size angles / channel upto 5/8"
104All size angles / channel above 5/8"
105Slot holes in flat / angles / channel upto 3/4"
106Slot holes in flat / angles / channel above 3/4"
107Fabrication of centre support only for DT structure
108Cutting of RS Joist / Angles / MS Channels
109Welding of RS Joist / Angles / MS Channels
110GENERAL
111Set right the leaning pole in both HT & LT[ pin point ] location
112Set right the leaning pole in both HT & LT[ cut point ] location
113Resagging of lines for all sizes cut point location
114Converting pin point into cut point HT lines
115Converting pin point into cut point LT lines
116Clearing tree branches ofcoconut tree
117Clearing tree branches of Neem, tamarind, countrytree etc.,
118Releasing and erection 1 ph SC wire [during conductor or support change]
119Releasing and erection 3 ph SC wire [during conductor or support change]
120Destruction of pole concerting at site.
121Retrieving grill from detoriated pole [grill separate from damaged pole]
122Re earthing of structure completely including earthpipe changing if any 3nos earth pipe
123Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe )
124Guarding Arrangement :-
125Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ]
126Flat guarding with 4 wire
127Split Netural Guarding
128LOADING AND UNLOADING :
129Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ]
130Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ]
131Unloading of PSC / RCC / Metal Poles
132TRANSPORTING FROM ROAD SIDE TO WORKSPOT
133Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km
134Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof[ certified by AEE ]
135Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km
136Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof
137TRANSPORT OF LINE MATERIALS
138Transport of line Materials [ minimum 1 MT ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading Upto 8 kms
139Transport of line Materials [ minimum 1 MT ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM
140TRANSPORT OF EQUIPEMENTS
141Transporting of Distribution Transformer/Metering set by using private vehicleload of one No.MinimumUp to 30 Km
142.Transporting of Distribution Transformer/Metering set by using private vehicleload of one No.Minimum above 30 Km for every addl .1 KM
143DISMANTLING WORKS
144Dismantling of 7.5m / 8.0m poles [RCC / PSC]
145Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles
146Dismantling stay set complete
147Dismantling of LT 1 ph "X" Arm / LT/HT TI Fitting
148Dismantling of LT/HT TI Fitting
149Dismantling of LT 3 ph "X" Arm
150Dismantlingof 3[1/2]" V` X " arm
151Dismantlingof Tapping channel and Guarding X Arm
152Dismantling of 11 KV strain disc/polymer disc with hardware
153Dismantling of 22 KV Pin insulator with pin
154Dismantling of 22 KVStrain disc with hardware
155Dismantling of 33 KV Pin insulator with pin
156Dismantling of 33 KVStrain disc with hardware
157Dismantlingof LT Pin insulator with pin
158Dismantlingof LT Shackle with hardware
159Dismantling of Aluminium knob
160Dismantling of Conductor7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm
161Dismantling of ConductorACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm
162Dismantling of ConductorACSR 7/4.09 mm
163SINGLE PHASE METER &3 PHASE METER
164Fixing of single phase meter
165Fixing of 3 phase meter
166Dismantling of single phase meter
167Dismantling of 3 phase meter
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail