Tender For Supply Of Equipment / Material, Design, Erection, Testing & Commissioning For Sop To M / S Sheheed Padam Singh Filling Station Byprov. 11 / 0.4Kv 63Kva S / Stn. A / W Ht Line & Ct / Pt Unit At Vill Tattal In Electrical Section Khajjian Under Esd Hpsebl Nurpur ( T.S No 84 / 2023-24 Sanctioned Amount Rs. 918870 / - ) ( On Turn Key Basis ) -11 Kv Ht Line 2 Prov. Aaac ( 7 / 3.81 80Mm² ) { Neutral Conductor Including 1% ( Sag, Jumpering And Wastage } 3 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) . 4 Prov. Muffs With Concerete Filling 5 Prov. Gi Wire 8 Swg. 6 Prov. Disc Insulator Set Cleave & Tounge Halicaly Formed Fitting 7 Prov. Pin Insulator With Gi Pin 8 Prov. X-Arm - Ms Channel Iron: 100X50x6, Length: 1500 Mm 9 Prov. Angle Iron ( 50X50x6 Mm ) , Length: 750 Mm X 2 No. For S / P Str. 10 Prov. & Fabrication Of Top Hamper Set - Ms Angle Iron: 50X50x6, 11 Prov.Stay Set Complete Ht I / C Egg.Pole Top Bracket [ Msci:100X50x6 Mm- 100 Mm ] 12 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 7.0 Kg Per Stay Set ) 13 Prov. Go Ab Switch Unit ( 11Kv, 400A, ) O / D Type 14 Prov. 11Kv Earthing Set Complete In All Respect. 15 Prov.Earth Cross Arms Of Angle Iron ( 50X50x6mm ) Length: 3000 Mm 16 Prov. Danger Plate ( 250X200x1.6 Mm ) 17 Prov. C.I. ( 75X40x6mm ) Length 2400Mm For Road / Khad Crossing. 18 Prov. 11Kv Do Fuse Complete In All Respect. 19 .Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 20 Prov. Barbed Wire 21 Prov. Aluminium Paint 22 Prov. X-Arm ( Horizontal ) - Ms Channel Iron: 100X50x6, Length: 2400 Mm 23 Erection Of 9 Mtr. St Pole Singlestructure I.E. Digging Of Pit, Fixing Of Insulator, X-Arms, K.B. Set, Top Clamp, Barbed Wire, Danger Plate, Drilling Of Holes And Filling Of Pit + Rammingcomplete In All Respect. 24 Erection Of Stay Set Ht I.E. Digging Of Pit, Fixing Of Stay Road, Filling Of Pit, Nozzeling & Tightning 25 Erection Of G.O. Switch 400 Amp. Comp. 26 Fixing Of Jumper 27 Sagging Of Conductor I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 28 Sagging Of Gi Wire I.E. Laying, Stringing And Sagging & Binding ( Single Wire Per Km ) . 29 Transportation Charges @10060 / - Per Km 30 Mannual Carriage Of Material 1 Km Ht Line Considering Average Distance From Road To Site Of Work ( 0.205 Km ) 31 63Kva Trsanformer 32 Prov. Distribution Transformer ( Ordinary ) , 11 / 0.4 Kv, 63 Kva . 33 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) . 34 Prov. Muffs With Concerete Filling 35 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Incomer Line 36 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length: ( 2800 Mm ) X1 Nos For LaS 37 Prov. X-Arm: [ Channel Iron ( 75X40x6 Mm ) , Length : ( 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 38 Prov. Transformer Bed, Belting & Knee Bracing 39 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Transformer Bed 40 Prov. X-Arm [ Channel Iron ( 100X50x6 Mm ) , Length : ( 460Mm ) X 2 Nos For Supporting Main Channel Of Transformer ] 41 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 42 Prov. Ms Angle Iron ( 35X35x5 Mm ) , Length : ( 460 ) X 2 Nos 43 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 950 Mm ) X 2 Nos For Bed Knee Bracing 44 Prov. Transformer Lt Distribution Box And Go Switch Fixing Assembly 45 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 46 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 450 Mm ) X 1 Nos 47 Prov. Go Switch Handle Supporting: [ Channel Iron ( 75X40x6 Mm ) , Length : 460 Mm 48 Prov. Go Ab Switch Unit ( 11Kv, 400A, 25 Ka ) Tripple Pole O / D Type 49 Prov. D.O Fuse Unit 50 Prov. Lighting Arrester, 9 Kv Station Class ( Porcelain Type ) 51 Prov. Discs Insulator Sets ( Comprising 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamps Etc. ) 52 Prov. Stay Set Complete 53 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) 54 Prov. Pipe Earthing Set 55 Prov. Lt Distribution Panel Box With Mccb ( 160A, 10Ka, 4P, 1No ) & Sfu ( 32A, 5No, Rewirable ) 56 Prov. Half Clamp ( M.S. Flat 50X6 Mm ) 57 Prov. Full Clamps ( M.S. Flat 50X6 Mm ) 58 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 59 Prov. Aluminium Thimble 60 Prov. Aluminium Thimble 61 Prov. Danger Plate 62 Prov. Barbed Wire 63 Prov. Lt Cable ( 3.5 Core ) 95 Mm² 64 Prov. Energy Meter 3-?, 4 Wire Ct Operated Static Tri-Vector Meter With Box ( Ct-100-200 / 5A ) 65 Prov. Aluminum Paint. 66 Prov. 6 / 1 / 3.35, 50Mm². 67 Prov. Transformer Fencing , Angle Iron , Gate Etc & Protection Plinth ( Civil Work As Per Hpsr ) . 68 Erection Of 63 Kva S / Stn. I.E. Digging Of Pit For Pole & Earthing Two No. Poles & 3 Nos. For Earthdrilling Of Holes In X-Arms, Preparation Of Plateform Str. Members C.I., A.L. I.E. X-Arms & K.B. Set, Errection Of D / P, Concreating Of Rcc Muff Errection Of Plateform, Errection Of X-Arms, D.O., L.A., Mccb, Switch Lt Box, Energy Meter, Errection Of Transformer, Earthing Connection To G.O. Switch, Transformer L.A. Etc., Errection Of Stay Set, Jumper, Pipe Earthing 3 Nos Set, L.T. Cable, Barbed Wire And Painting Complete In All Respect. 69 Transportation Charges @10060 / - 70 Prov. Transportation Charges & Mannual Carriage Of 63 Kva Pole Mounted Distribution S / Stn. 71 Ct / Pt Unit 72 Prov. 11Kv Ct / Pt Combination Type Unit Consisting Of Three CtS On Ryb Phases Three Phase 11Kv / 110 Volts Transformer Of Class 0.5 Accuracy And 50 Va Burdon Of CtS 50 / 5Amps. 73 Prov. 3Ø-3 Wire Ht Electronic Meter 100 / 5, Amps, Ofclass 0.5 Accuracy 74 Prov. M.S. C-Iron X-Arm 2800X100x50 Mm 2.4 Mtr. 75 Prov. G.I. Wire No. 8 Swg 76 Prov. 3½ Core 95 Mm² Pvc Cable 77 Prov. Meter Box Of M.S. Sheets 78 Prov. G.I. Pipe 1.5 Dia 2 Mtr. Long 79 Prov. 9 Core 4 Mm² Copper Cable For Connections 80 Erection Of11kv Ct / Pt Combination Type Unit Consisting Of Three CtS On Ryb Phases Three Phase 11Kv / 110 Volts Transformer Of Class 0.5 Accuracy And 50 Va Burdon Of CtS 50 / 5Amps. 81 Quantities Are Mentioned Above Are Tentative And Actual Quantity Shall Be Worked Out After Check Survey To Be Carried Out By The Successful Tender And Detailed Engineering And Finalization Of Tower Location Chart.Payment Shall Be Made As Per Approved Bill Of Material / Actual Quantities Measured At Site.