}

Tender For Construction Of Division Office Building Of Drainage Division, Berhampur., berhampur-Odisha

Drainage Division has published Tender For Construction Of Division Office Building Of Drainage Division, Berhampur.. Submission Date for this Tender is 04-01-2024. Building Work Tenders in berhampur Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

41214914
Tender For Construction Of Division Office Building Of Drainage Division, Berhampur.
Open Tender
Indian
Odisha
berhampur
04-01-2024

Tender Details

Construction Of Division Office Building Of Drainage Division, Berhampur. Earthwork, Cement Concrete, Reinforced Cement Concrete And Brick, Tiles And Other Building Items

Key Value

Document Fees
INR 10000 /-
EMD
INR 108791.0 /-
Tender Value
INR 1.08 Crore /-

BOQ Items

Name of Work: Construction of Division office Building of Drainage Division, Berhampur.
Sl. No. Item Description
1Earth work inexcavation in all type ofsoilsin foundation of columns, walls, basement, plinth protection, etc.,in all kinds of soils, dressing and levelling the bed and sides, ramming the bed to proper level and breaking the clouds to maximum 5 cm to 7 cm and laying the excavated material away from the work site with all leads,lifts and delifts including all labour, T&P, cess, etc. complete in all respects as directed by theEngineer-in-charge.
2Filling in foundation and plinth with sand well watered and rammed to proper level including cost, conveyance, royalty of sand, cess, T&P etc. complete in all respect as directed by the Engineer-in-charge.
3Cement concrete M-15 grade with crusher broken coarse aggregate of size 40mm & downgraded of approved quality form approved quarry, mixing by concrete mixer and placing manually in proper position, with all leads, lifts and delifts, compacting with vibrators including cost, conveyance, royalty, loading and unloading of all materials,curing, cess, T&P, etc. complete as perdirection ofthe Engineer-in-charge.
4Cement concrete M-20 grade with crusher brokenhard granite coarse aggregate of size 20mm and downgradedof approved quality from approved quarry, mixing by concrete mixer and placing manually in proper position, with all leads, lifts and delifts, compacting with vibrators including cost, conveyance, royalty, loading and unloading of all materials, curing, cess, T&P, etc. complete as perdirection ofthe Engineer-in-charge.
5For Ground Floor
6For 1st Floor
7For 2nd Floor
8For Staircase Room (3rd Floor)
9K.B. brick masonry with 23x11x8cm size KB bricks having crushing strength not less than 75kg/cm2 and dimensional tolerances ±8% in cement mortar (1:6) in foundation and plinth and superstructureincluding cost, conveyance, royalty, loading and unloading of all materials, curing, cess, T&P, etc. complete as perdirection ofthe Engineer-in-charge.
10For Ground Floor
11For 1st Floor
12For 2nd Floor
13For Staircase Room (3rd Floor)
1412 mm thick cement plaster with cement mortar (1:6)to brick work including cost, carriage & royalty of all materials, necessary scaffolding, curing, labour, cess, T&P etc. complete as per direction of the Engineer-in charge.
15For Ground Floor
16For 1st Floor
17For 2nd Floor
18For Staircase Room (3rd Floor)
1916 mm thick cement plaster with cement mortar (1:6) to brick work including cost, carriage & royalty of all materials, necessary scaffolding, curing, labour, cess, T&P, etc. complete as per direction of the Engineer-in charge.
20For Ground Floor
21For 1st Floor
22For 2nd Floor
23For Staircase Room (3rd Floor)
24Providing and laying of 60 mm thick cement concrete interlocking paver blocks of M-30 grade c.c. and of approved make, variety colour and size made by block making machine with strong vibratory compaction of approved design and shape laid in required colour and pattern over 50 mm thick compacted bed of coarse sand, filling the joints with fine sand, etc all complete including cost, conveyance, royalty of all materials, all labour, T&P, cess, etc. complete in all respect as per direction of the Engineer - in - charge.
25Supplying, fitting and fixing vetrified tiles of size 600mm x 600mm of approved make in floors with application of polymer modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality with all leads, lifts delifts including cost, conveyance, royalty of all materials, curing, all labour, cess, T&P,etc. complete as per direction of the Engineer in charge.
26For Ground Floor
27For 1st Floor
28For 2nd Floor
29Fixing tiles in floors, treads of steps and landing on 25 mmthick bed of cement mortar 1 : 1(1 cement : 1 sand) and filling the joints with white cement mixed with pigment to match the shades of the tile including cost, conveyance, royalties of all materials, all labour, hire and running charges of all machineries,labour cess, T&P, sundries, rubbing and polishing, etc. complete as per specification and direction of Engineer-in-Charges.
30For Ground Floor
31For 1st Floor
32For 2nd Floor
33Fixing tiles in dados, skirting and risers of steps on 12 mm thick bed of cement plaster 1 : 3(1 cement : 3 sand) and filling the joints with white cement mixed with pigment to match the shades of the tile including cost, conveyance, royalties of all materials, all labour, hire and running charges of all machineries, labour cess, T&P, sundries, rubbing and polishing, etc. complete as per specification and direction of Engineer-in-Charges.
34For Ground Floor
35For 1st Floor
36For 2nd Floor
37Priming 1 coat (to plastered surface)with any approved primer including cost ,conveyance of primer, labour, cess, scaffolding, T&P required,etc. complete as per direction of the Engineer-in charge.
38For Ground Floor
39For 1st Floor
40For 2nd Floor
41For Staircase Room (3rd Floor)
42Finishing surface of walls with cement based wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging charges with cost of all materials, labour,cess, T&P, etc. complete as per direction of the Engineer-in charge.
43For Ground Floor
44For 1st Floor
45For 2nd Floor
46For Staircase Room (3rd Floor)
47Wall painting 2 coat with plastic emulsion paint of approved quality and shade on new work to give an even shade including cost of all materials, labour,T&P, cess, scaffolding and staging charges, etc. complete as per direction of the Engineer-in charge. (Inside Plastic Emulsion) Paint.
48For Ground Floor
49For 1st Floor
50For 2nd Floor
51For Staircase Room (3rd Floor)
52Distempering two coats to outer surface of walls with distemper of approved quality and shade on new work to give an even shade including cost of all materials, labour, cess, T&P, scaffolding and staging charges, etc. complete as per direction of the Engineer-in charge.
53For Ground Floor
54For 1st Floor
55For 2nd Floor
56For Staircase Room (3rd Floor)
57Supplying, straightening, cutting, bending & binding and tying the grills of HYSD bars of approved quality and placing in position including cost, conveyance of HYSD bars and binding wire 18 to 20 gauge, loading, unloading, cess, T&P, etc. complete as per direction of Engineer-in-Charge.
58For Ground Floor
59For 1st Floor
60For 2nd Floor
61For Staircase Room (3rd Floor)
62Rigid & smooth centering and shuttering for R.C.C. work of R.C.C. floor and roof slab, landings, balconies, projecting sun shades and chajjas upto 4.30mheight including false work and dismantling them after casting including cost, conveyance of all materials, cess, labour, T&P, etc. complete as per direction of the Engineer –in –Charge.
63For Ground Floor
64For 1st Floor
65For 2nd Floor
66For Staircase Room (3rd Floor)
67Rigid & smooth centering and shuttering for R.C.C. foundation and plinth band, footings, bases of columns mass concrete pre-cast slab etc. including false work and dismantling them after casting including cost, conveyance of all materials, cess, labour, T&P, etc. complete as per direction of the Engineer –in –Charge.
68Rigid & smooth centering and shuttering for R.C.C. work of R.C.C. beams,columns,,girder and bressmer, etc. including false work and dismantling them after casting including cost. Conveyance of all materials, cess, labour, T&P etc. complete as per direction of the Engineer –in –Charge.
69For Ground Floor
70For 1st Floor
71For 2nd Floor
72For Staircase Room (3rd Floor)
73Rigid smooth centering and shuttering for RCC stairs excluding landing but including railing,etc. including false work and dismantling them after casting including cost, conveyance of all materials, cess, labour, T&P etc. complete as per direction of the Engineer –in –Charge.
74For Ground Floor
75For 1st Floor
76For 2nd Floor
77Rigid & smooth centering and shuttering for R.C.C. Lintels including false work and dismantling them after casting including cost, conveyance of all materials, cess, labour, T&P etc. complete as per direction of the Engineer –in –Charge.
78For Ground Floor
79For 1st Floor
80For 2nd Floor
81For Staircase Room (3rd Floor)
82Providing, fitting & fixing of Aluminum door with OEL anodized Aluminum door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and 6mm plain glass in top portion with 12mm thick prelaminated board in bottom portion fixed on door frame by means of tapered clip No.4660 and frame to be completed by means of jointing angle No.1855 including cost of materials, labour, T & P including cost of glass, Door Closer, 6 Lever mortice luck, Automatic door closer including cost of materials, conveyance, all labour, T&P, cess, etc. complete as directed by the Engineer-in Charge.
83Supplying, fitting, fixing ofwindow ( sliding type) made of aluminium section 9778 as window frame section no-4095, 4096 and 9777, 3994 as shutter frame with 5mm thick black glass as pannelled fitted with rubber beading including locking arrangement including all fitting including cost of materials, conveyance, labour, cess, T&P excluding cost of glass etc. complete as directed by the Engineer-in Charge.
84Providing, fitting& fixing of false ceiling with aluminium anodized T section No.3215 with 2’-0” center to center , L section No.1705 upto 15 micron on 4 walls to be fixed by means of steel screw & PVC plug and the aluminium grid 2’-0” x 2’0” suspended from ceiling etc complete including cost, conveyance, cess and labour etc. complete in all respect as per direction of the Engineer-in-Charge.
852.5cm thick grading cement concrete (1:2:2) on roof slab with 6mm size black hard granite chips of approved quality from approved quarry, placing in position, with all leads, lifts and delifts, compacting properly including cost, conveyance, royalty, loading and unloading of all materials, curing, cess, T&P, etc. complete as perdirection ofthe Engineer-in-charge.
86Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmX32mmX2mm @0.90m C/C and stainless steel square pipe bracing of size 32mmX32mmX2mm in 3 rows in stair case as per approved design and specification, buffing, polishing including all fitting, cost of all materials, conveyance, labour, cess and T&P, etc. complete as per direction of the Engineer-in-charge.
87Providing and fixing of Fixed Ventilators of approved make to be fabricated from roll formed sections made of pre-painted steel (base steel as per IS-513 of 0.6 mm thick “D” quality, galvanized as per IS-277 with zinc of 120 Gm/Sq.mtr) with paint specification being with primer of 5-7 microns and finished paint with polyster paint (Black /Pearl white/ Chocolate Brown) of 12-16 microns alongwith the alkyd backer at the back of 5-7 microns and the sizes of outer frame being of 46x52 mm and with all vertical and horizontal mullions are of 46x70 mm and fixed beadings are of 18x25 mm. Accessories / gaskets are to be used as per the manufacturer’s supply and specification like handle being made of high grade aluminium powder coated and with nylon receiver and gasket will be made of EPDM. All corner brackets are to be made of CRCA with zinc phosphating. The mullion caps and louvered-clips should be of glass filled nylon. The sections are to be cut to length ,mitre joined with corner bracket and frames are fixed to the concrete/masonry walls by means of self expanding screws and glass to be used of 5 mm reflective with cost, conveyance of all materials, cost of all labour, cess, T&P, etc. complete as per the direction of the Engineer-in-charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail