| 1 | BOQ ( Sch \"A\") B/R itemsTaking down cement or cement lime plaster of any description on brick or PCC blocks or stone wall or concrete surface etc including racking out joints, hacking for keys, scrubbing down with water etc all as specified and directed. |
| 2 | M&L for 15mm thick rendering in CM 1:6 on stone masonry surfaces or brick masonery/concrete surfaces other than fair faces of brick work, finishing the surfaces fair and even complete all as specified and directed. |
| 3 | M&L for preparation of newly plastered / Existing surface of external wall all as prescribed by manufacturer of paint and applying two coats of exterior anti fungal acrylic emulsion paint (walmista of Berger paint or equivalent in Asian paint, Nerolac etc having three years of performance warranty) over a coat of exterior water based primer of same make all as specified and prescribed by manufacture of paint complete all as specified and as directed.Note:- (i). The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacturer instruction before application of emulsion paint. The cost of all materials, T&P and labour required for preparation of surface are deemed to be included in the rates quoted.(ii). The work must be got executed through authorised applicator of manufacturer after concluding an MoU with manufacturer for company back guarantee by the contractor. The authorised applicator of manufacturer shall be got approved from GE before commencement of work.(iii). All the material to be incorporated in the work shall be brought by contractor to MES store yard which will be subsequently issued by department for incorporation in the work to ensure the quantity to be consumed all as per recommendation of manufacturer.(iv). After carrying out preparation of surface the same shall be got approved from GE before application of distemper for each building.(v). The colour / shade will be all as approved by GE. (vi) The cost of Scaffolding wherever required are deemed to be included in the Rate Quted by the Contractor. |
| 4 | Taking up or down 15mm dia steel tubing and connections by disconnecting fittings/tubing from existing tubing were required including cleaning for refixing or removal from site complete all as specified and directed. |
| 5 | Taking up or down 20mm dia steel tubing and connections by disconnecting fittings/tubing from existing tubing were required including cleaning for refixing or removal from site complete all as specified and directed. |
| 6 | M&L for 15mm bore GI tubing, medium grade, galvanised with and including all GI fittings and fixed complete to walls and ceiling or laid in floors complete all as specified and directed. |
| 7 | M&L for 20 mm bore GI tubing, medium grade, galvanised with and including all GI fittings and fixed complete to walls and ceiling or laid in floors complete all as specified and directed. |
| 8 | M&L for sunken floor treatment as described as under(i) to (vii) :-(i) Demolition of cement concrete of any description and in any position not otherwise specifically provided or in anytype of filling in sunken portion & cleaned the sunken portion incl vertical wall surface complete as directed.(ii) M&L for filling the sunken floor with PCC( 1:5:10) type E-2 using brick aggregate over the treated surface completeall as specified and directed. (iii) M& L for40mm thick (Min) PCC (1:2:4) type B-0 using 12.5 mm graded stone aggregate mixed with and including integral water proofing compound as per manufacturer instructions on bottom of sunken portion with proper slope towards spout. Vertical sides shall be plastered in CM (1:3) 15 mm thick mixed with and including water proofing compound as per manufacturer instructions. Plaster shall be extended over PCC coving when the same is green i.e. PCC& plaster be carried out at the same time completeall as specified and directed.(iv) After laying sewage/ plumbing pipes with fixtures in position2 coats of OMIPLAS EP-101 epoxy compound shall be applied completeall as specified and directed.(v) S&F Spouts of25mm dia GI pipe light grade projecting 450mm clear of face outer a wall with mosquito proof cap on inner face of pipe shall be provided to drain out seepage water ,including cutting holes and making good if needed as specified and directed.(vi) Testing of water tightness by pounding for 72 hours & rectify defects if any till total elimination of defects completeall as specified and directed.The sunken portion shall be tested for leakage / seepage / dampness by pounding with water for 72 hours. In case any defect is noticed the portion shall be grouted with cement slurry mixed with suitable chemical & tested again. The process of grouting and testing shall be repeated till leakage / seepage / dampness is eliminated. |
| 9 | Demolition of cement concrete (unreinforced)in ground floors and pavings not exceeding 15 cm thickness (below or above ground level) Complete all as specified and directed. |
| 10 | M&L for PCC 1:5:10 type E2 using 40mm graded stone aggregate as in sub baseof floor complete all as specified and directed. |
| 11 | S&F in repairs polymer white (polypropeylene Delrin and ABS) lowlevel flushing cistern 10 Ltrs capacity, valveless, syphonic action type complete with inlet, ball valve float valve, bends brackets, rawl plug, brass screws handle etccomplete all as specified and directed. |
| 12 | S & F PVC connections 15mmdia , 450mm long, , withPTMT nuts& washers at both ends complete all as specified and directed. |
| 13 | S& Fin repairs Vitreous china premium/ 1st quality wash down water closet EWC white/ ivory/off white (closed pattern incl all necessary accessories like rag bolts/ gel gasket etc. (excluding flushing cistern & flush pipe) complete in all respect all as specified and directed. |
| 14 | S & F Health faucet (ABS Body) mild steel chromium plated suitable for 15 mm dia pipe with 1.25 metre long flexible tube and ABS wall hook including making connections and fixed in positionin repairs complete in all respect complete all as specified and directed. |
| 15 | Taking down AC rain water pipes (any size or pattern) including all fittings heads shoes bends swan necks etc complete all as specified and directed. |
| 16 | S&F 110mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, fixed to walland in floors complete all as specified and directed. |
| 17 | S&F75 mm bore PVC (SWR) pipe single socketed in as length with rubber ring as in vent pipe complete all as specified and directed |
| 18 | S&F in repairsof 100 mm dia PVC (SWR)bend complete all as specified and directed. |
| 19 | S&F in repairsof 75 mm dia PVC (SWR) bendcomplete all as specified and directed. |
| 20 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. |
| 21 | M&Lfor coloured non skid ceramic tiles 7 to 8 mm thick ( square/ rectangular) area of each tiles exc. 0.11 sqm but n.exc. 0.18 sqm in floors etc set and jointed in neat cement slurry and pointed in white cement with colour pigment with and incl 15mm thick screed bed in CM 1:6 complete all as specified and directed. |
| 22 | M&L 300x450x7mm thick glazed ceramic digital tilescoloured incl ,design and pattern as approved fixed as in vertical surface etc, set and jointed in neat cement slurry and pointed with white cement with colour pigment to match with and incl 10mm thick screed bed in CM 1:4 complete all as specified and directed. |
| 23 | S&F in repairs 15mm dia bib tap long body CP, screwed for iron pipescomplete all as specified and directed |
| 24 | S&F in repairs angle cock 15 mm bore brasschromium plated, screwed both ends for pipes or for unions fixed in repairs including making good to match with existing surface complete all as specified and directed |
| 25 | S& F For 75 mm PVC (SWR) vent cowl complete all as specified and directed |
| 26 | M & L for providing plain cement concrete type C-1, 1:3:6 (using 20 mm graded stone aggregate) as in coping, bed block for embedding hold fasts, kneelers, apex stones, bed plates, water troughs and the like including weathering, slightly rounded or chamfered angles & throating as directed including necessary form work as required complete all as specified and directed. |