Mormugao Port Trust-MPT has published Tender For Providing 4 Nos. Ip Based Outdoor Cctv Cameras, 5 Nos. Telephone Units, 3 Nos. Air Conditioning Units, Supply And Laying Of Power Cables, Shifting Of High Mast And Dg Set At Toll Plaza And Administrative Block At New Mpa Gate No.9. Submission Date for this Tender is 07-12-2023. CCTV System Tenders in headland Goa. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PART-I: Providing 4 nos. IP based outdoor CCTV cameras |
2 | Supply, Installation, testing and commissioning of IP based bullet 4MP outdoor type Camera as per technical specification at Scope of Work. |
3 | Supply |
4 | Installation, testing and commissioning |
5 | Supply, Installation, testing and commissioning of Network Video Recorder of minimum 8 Channel along with 4TB Hard disk for recording and storage as per technical specification at Scope of Work. |
6 | Supply |
7 | Installation, testing and commissioning |
8 | Supply, Installation, Testing and commissioning of 32” Display monitor as per technical specification at Scope of Work |
9 | Supply |
10 | Installation, testing and commissioning |
11 | Supply, installation , Testing & Commissioning of 8 Port 10/100/1000 Giga port switchas per technical specification at Scope of Work |
12 | Supply |
13 | Installation, testing and commissioning |
14 | Supply, Installation, testing and commissioning of Wireless Transmitters and Receivers (AP) with complete accessories, antennas, Power supply units, fitting arrangements, etc as per technical specifications at Scope of Work |
15 | Supply |
16 | Installation, testing and commissioning |
17 | Supply, Installation, testing and commissioning of 6 meter lattice Tower with Self climbing ladder as per technical specification at Scope of Work |
18 | Supply |
19 | Erection and commissioning |
20 | Supply, Installation, Testing & Commissioning of1 KVA online UPS as per technical specification at Scope of Work |
21 | Supply |
22 | Installation, testing and commissioning |
23 | Supply of CAT 6 Indoor Cable as per Technical specification at Scope of Work |
24 | Supply and Laying of Suitable size casing capping for CAT-6 cable, power cable as per technical specification |
25 | Supply |
26 | Laying along the wall/ceiling etc |
27 | Supply andInstallation of Rack |
28 | Supply |
29 | Installation |
30 | Accessories like screw, clamp, bends, PVC power cable, Switch Socket,RJ45 etc. |
31 | Configuration of all equipment, supervision and documentation |
32 | PART-II : Providing TELEPHONE Lines as per Scope of Work |
33 | Supply, Installation testing, commissioning and handing over of Telephones. |
34 | Supply |
35 | Installation, testing and commissioning |
36 | Supply, laying, commissioning and handing over of 100 pair telephone cable including supply and laying of bricks along the length of cable. |
37 | Supply |
38 | Laying in existing trench by opening the RCC covers and closing back |
39 | Laying in Road/Ramp crossing (Excavation &pipes will be provided by Port) |
40 | Laying in the existing trench and backfilling the trench. |
41 | Laying by clamping along the existing wall. |
42 | Supply, laying, commissioning and handing over of 50 pair telephone cable including supply and laying of bricks along the length of cable. |
43 | Supply |
44 | Laying in existing trench and back filling the trench. |
45 | Supply, Installation, testing, commissioning and handing over of 24 Port extension card for remote shelf. |
46 | Supply |
47 | Installation, Testing and Commissioning |
48 | Supply Installation, testing, commissioning and handing over of outdoor PVC Junction Boxes |
49 | Supply |
50 | Installation |
51 | Supply Installation, testing, commissioning and handing over of 100 pair Crones as per standard design. |
52 | Supply |
53 | Installation |
54 | Supply Installation, testing, commissioning and handing over of 50 pair Crones as per standard design. |
55 | Supply |
56 | Installation |
57 | Supply, laying, testing, commissioning and handing over of 5 pair telephone cable. |
58 | Supply |
59 | Installation |
60 | Supply and Laying of Suitable size casing cappingfor laying 5 pair cable |
61 | Supply |
62 | Laying along the wall / ceiling etc. |
63 | Supply of single line Rosette Boxes |
64 | Accessories like screw, clamp, bends, PVC power cable, Switch Socket,RJ45 etc. |
65 | PART-III: Providing Air-Conditioners as per Scope of Work |
66 | Supply, installation, testing and commissioning of 1.5 TR Split invertor air-conditioner 5 star rated, single phase. including all accessories, voltage stabilizer and as per Scope & technical specification. |
67 | Supply |
68 | Installation, testing and commissioning |
69 | PART-IV : Providing Power Cable as per Scope of Work |
70 | Excavation of trench in hard soil 1.0 meter deep and 0.6 meter width in hard soil and Back filling of trench. |
71 | Supply of 4 corex120 sq.mm LT, 1.1 KV grade aluminium XLPE armoured cable. |
72 | Supply of 4 corex35 sq.mm LT, 1.1 KV grade aluminium XLPE armoured cable. |
73 | Laying of LT cable of size 4 core x 120 sq.mm |
74 | In RCC trench |
75 | In excavated trench |
76 | Through GI pipes at road crossing |
77 | Clamping on wall with GI sadles |
78 | Laying 2 runs of LT cable of size 4 core x 35sq.mm in trench provide by the Port. |
79 | Providing GI pipe earthing as per scope of work |
80 | End Termination of LT 4 core x 120 sq.mm cables by providing suitable glands and lug. |
81 | End Termination of LT 4 core x 35 sq.mm cables by providing suitable glands and lug. |
82 | PART-V : Shifting of High Masts as per Scope of Work |
83 | Design and casting of suitable foundation for the High mast confirming to SBC results. The foundation Height of the High mast shall be 500mm above the existing nearby ground level |
84 | Design & construction of Protection Guard/Fencing surrounding the high mast with suitable size MS channel and MS angles as per the Technical specifications |
85 | Installation and commissioning of the existing high mast control panel by terminating the required cables such as Incomer, lighting and motor. Work also including supply and fixing of required materials such as glands lugs etc. complete in all respect. |
86 | Providing RCC/Stone masonry foundation complete in all respect including plastering for the High Mast control Panel and the dimension .The gap between the pillars is 350 mm for cable connection to the control panel. The foundation starts 300mm below the groundafter making 100mm stone soling and height of the foundation 750mm above the ground level and curing etc. and the panel should be stand on the well groutedStainless steel bolts. The work shall be complete in all respect. |
87 | Fixing of 16 no LED flood light luminaries Fittings , junction box with complete wiring workon existing high mast lantern carriage (Fittings and Junction boxes will be provided by the Port) |
88 | Erection, testing and commissioning of 30 mtrs high mast complete in all respectwith the help of suitable equipment’s |
89 | Supply of 5 core 4 sq mm copper trailing cable . The cable shall be EPR insulated and PCP sheathed to get flexibility and endurance with Rodent proof coating |
90 | PART-VI : Shifting & Re-Installing of DG Sets |
91 | Dismantling ,Shifting\ transportation and re-installation of Diesel Generator (DG) set along with chimney and other accessories includingCivil \electrical related works from existing place (shed at near gate no. 9)to location near T3 shedand successful recommissioning of DGset as per the Scope of work. |