| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterie or sandstone) including removing spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches leveling, dressing and ramming the bottom hailing out water as required complete.Depth of excavation not exceeding 1500 mm |
| 2 | Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm. as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand.(Payment to be made on measurement of finished quantity) |
| 3 | Cement concrete with graded stone ballast (40mm Size excluding shuttering). In gr. Floor. Pakur veriety. (6:3:1) proportion. |
| 4 | Ordinary Cement Concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, If any, in ground floor. as per relevant IS codes. |
| 5 | (With Pakur/ Chandil Variety). |
| 6 | Ordinary Cement Concrete(mix 1:1.5:3) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS Codes. |
| 7 | Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth |
| 8 | Supplying and laying Polythene Sheet (150 gm / sq.m) over damp proof course or below flooring or roofterracing or in foundation or in foundation trenches. |
| 9 | Hire & labour charges for shuttering with centering and necessary staging up to 4 mtr. using approved stoutprops and thick hard wood planks of approved thickness with required bracing for concreteslabs, beams, columns, lintels curved or straight including fitting & fixing and strikingout after completion of work ( up toroof of ground floor).25 mm to 30 mm thick with staging in foundation. |
| 10 | 25 mm to 30 mm thick without staging in foundation. |
| 11 | Reinforcement for reinforced concretework in all sorts of structure including distribution bars, stirrups, binders etc. including supply ofrods, initial straightening and removal of loose rust, cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter section, complete as per drawing and direction. |
| 12 | For works in foundation, basement and up to roof of ground floor.-tor steel/mild steel.SAIL/TATA |
| 13 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out jointsor Chipping, roughening of concrete surface including throating, nosing and drip course , scaffolding/staging where necessary. Ground floor. [Including cost of chipping over concrete surface]. With 1:4 cement mortar. 15 mm thick plaster. |
| 14 | Neat cement punning about 1.5mm. thick in wall dado, window sills, floor, drains etc. ( Cement 0.152 Cum per 100 Sqm.) |
| 15 | Earth work in filling in foundation trenches or plinth with good earth, In layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on basis of measurement of finished quantity of work). |
| 16 | (a) With earth obtained from excavation of foundation. |
| 17 | (c)Dismantling R.C. floor, roof,beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. |
| 18 | In ground floor including roof. |
| 19 | Dismantling all types of masonry excepting cement concrete plain of reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. |
| 20 | a) In ground floor including roof. |
| 21 | Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal /Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer-In-Charge. |
| 22 | G.I.works in brackets made from flats, angles, tees etc. to sizes specially bent, twisted, forged, making holes drilled and fitted to rafter to trusses with necessary bolts, nuts, washers, or screws etc. (length of straight not less than 230 mm.) |