}

Tender For Arc For Servicing And Maintenance Of Fire Fighting Equipment And System At Nrpl Bijwasan, najafgarh-Delhi

Indian Oil Corporation Limited-IOCL has published Tender For Arc For Servicing And Maintenance Of Fire Fighting Equipment And System At Nrpl Bijwasan. Submission Date for this Tender is 05-12-2023. Fire Extinguishers Tenders in najafgarh Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

40738423
Tender For Arc For Servicing And Maintenance Of Fire Fighting Equipment And System At Nrpl Bijwasan
Open Tender
Indian
Delhi
najafgarh
05-12-2023

Tender Details

Arc For Servicing And Maintenance Of Fire Fighting Equipment And System At Nrpl Bijwasan

Key Value

Document Fees
Refer document
EMD
INR 9300.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: ARC for Servicing & maintenance of Fire Fighting equipment & system at NRPL Bijwasan
Sl. No. Item Description
1ARC for Fire Fighting equipment maintena
2Checking, Inspection, Servicing and Maintenance of Fire Fighting System, equipments hydrants, extinguishers of all type (DCP/CO2/Cle an Agent), Water monitor up to the mark as per OISD/ISI Standards to provide & best functioning of the equipments always in best hea lthy condition inclusive of periodically cleaning, checking /inspection/oiling/ greasing of assemblies such as coupling, nozzles, va lves, hydrants, extinguishers, hose pipes, water monitor, compounds drums, nozzles foam bunch, hose boxes, sand buckets etc, updatin gthe data & identificationtags,recording the status of checking in history register etc. as directed by the engineers in charg ewith all labors, carriages, materials etc. complete inclusive of all taxes. (inspection and servicing of the equipment/Fire Fight ingfacilitiesis to be doneperiodically as mentionedagainst each):-
3Fire Hydrants (double headed) - Monthly Basis
4Fire Extinguishers of all types & capacities - Monthly Basis
5"Hose Boxes - Monthly Basis "
6Valves of Fire line of all sizes including Contractor supplied grease of suitable quality - Monthly Basis
7"Foam /Water Monitors - Monthly Basis "
8Sand buckets with stands with all bucket - Monthly Basis
9Taking delivery and refilling the extinguishers of various sizes /capabilities including supply of dry chemical powder, CO2 gas etc updating the data& identification tags, recording the status of checking in history register etc as per ISI standard and replaci ng the same as directed by Engineer-in-Charge (The rates are inclusive of all taxes other than GST). (The CO2 cylinder may to be tak en out and delivered back within 10 days after re-filling /repairing.However Fire extinguishers CO2 are to be supplied /Kept tempo rary in place of each fire extinguisher for which taking out for re-filling /repairing is required).
10"Dry Chemical Powder "
11"0.2 kg DCP Cartridge "
12"2 kg CO2 Cylinder "
133.2 kg CO2 Cylinder
14"4.5 kg CO2 Cylinder "
15"6.8 kg CO2 Cylinder "
162 Kg Clean Agent Cyliner
17Supply and replacing the spares /assembles etc of the Fire Fighting equipments system for all sizes / Capacities as per ISI standardand approved make with all labours, materials, carriages, inclusive of all taxes etc. complete
18"Hydrants Sheet Washer/Rubber including fitting at site. "
19"Hydrants coupling washer "
20"Rubber washer for Extinguisher "
21"CO2 Safety valves 155kgf/cm2 "
22"CO2 Safety pins "
23"ISI marked Discharge Pipe with horn for 6.5 Kg and 6.8Kg CO2 Exitinguishers "
24Rubber Gasket OF DCP Main Cap
25"Hose Plunger Set & Nut. "
26"Hose Spring & nut "
27"DCP main Cap (gun metal) CP "
28"DCP Plunger Pin with Spring "
29"DCP Plunger top "
30"Squeezing grip (Plastic) nozzle "
31"Replacement of fire hose box glass (front) "
32DCP cylinder discharge pipe of sufficient length for 10 Kg capacity Fire Extinguisher
33DCP cylinder discharge pipe of sufficient length for 75 Kg capacity Fire Extinguisher
34Supply and painting with two coats synthetic enamel paint ( Asian/Burger) fire paint including scrapping, cleaning, applying one coa t of red oxide primer cost of all labours, materials, carriage, taxes, letter/number writing, identification marks etc. complete in all respect.
35"Brush painting of fire hose boxes ( Inside and out side) including stand with two coat of Paint including letter/number writing ( C olour to be specified by EIC). "
36"Spray/Brush painting of fire bucket stand with its bucket (4-6 Bucket)including letter/number writing. "
37"Spray painiting of Fire extinguishers of all sizes including letter/number writing. "
38Spray/brush painting of Foam/water monitors/Double hydrant valves along with its stand post including letter/number writing.
39Fire Siren including letter/number writing
40OTHERS
41"Surface preparation of fire water line & process piping, equipment and valves: Area includes complete fire water line & process pip ing,handrails/supports.The scope of work of the contractor includes supplyof paint, tools & tackcles, laburs, all equipments etc. Surfacepreparation using hand tool cleaning including removal of oil, grease and other contaminants by solvent cleaning followed by removal of defective paint, loose mill scale, loose rust, loose paint, weld flux,slag from the metallic surfaces, by handchipping, h and brushing, handscrappers / chisels, steel wools, final cleaning with High pressure (10000 PSI ) low TDS fresh soft water jetclean ing and drying with compressed air as per the specifications and directions of SiteEngineer. Prepared surface shall conform to WJ-4 asper NACE no.5/SSPCSP-12 standards."
42"""Painting of Fire water line & process piping: Supply and application of paint on firewater line, foam line, process piping and HV LR platforms, including supports/handrails.The scope of work of the contractor includes supply of paint,tools & tackles,labours,all equipments etc.Painting system shall be as follows: FIRST COAT: surface tolerant epoxy primer (greater than 80% solid by vol.)mi nimum 100 micron per coat x 1 coats 2nd coat: acrylic isocyanate aliphatic Polyurethane coat (55% min. solid by vol.) with coat 50 m icrons DFT (min) byspray application (Gloss retention minimum 80 % under 1000 hours of QUVA.Colour will be as per SIC/EIC instructio ns. "
43Supply and fitting of plastic blank cap (as per IS 5290 , red colour with GI chain) suitable for 63 mm hydrant outlet as per directi on of EIC.
44"PPE maintenance / up-keeping / cleaning on Monthly Basis of various items like helmets, Breathing apparatus, Water jel blanket, Asb estos blanket,hand gloves (rubber / asbestos),first-aid box,stretcher,resuscicator,safety belt,ear-muffs, fire proximity suits, safe ty torch,safety goggles including the cost of labour, material and taxes etc. complete as per instruction of Engineer-in-Charge "
45"Cleaning & stacking properly the foam containers,updating stock,date of expiry,date of manufacturing on board and in register,placi ng foam containers at the foam monitors and water hydrants. "
46Air filling in cylinders of Breathing Apparatus inclusive of all taxes
47Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 2 to 4.5 Kg/Cm2)
48Hydraulic testing of Clean Agent Cylinders inclusive of all taxes ( 2 to 4.5 Kg/Cm2)
49Hydraulic testing of CO2 Cylinders inclusive of all taxes ( 6.8Kg/Cm2)
50Hydraulic testing of DCP Cylinders of all sizesinclusive of all taxes
51Hydraulic testing of Breathing Appratus Set
52Supply and fixing of wind socks on the position including all labour, tolls and tackels as per direction of Engineer-in-Charge inclu sive of all taxes.
53Supply & pasting of slips on the extinguishers showing how to use the extinguishers & date wise maintenance records of Fire Extingus her. The good quality of adehsive to be used on slips for sticking on the extinguishers inclusive of all taxes as per direction of E ngineer-in-Charge.
54Patch work welding on the Firefighting/Foam Line in case of leakage including all manpower & materials with tools and tackels with m aterials required as per satisfaction of the Engieer-In-Charge upto 14" size inclusive of all taxes.
55Supply and fixing of small hammers with chains for Hose Boxes asper direction of Engineer-in-Charge inclusive of all taxes.etc
56Supply of 200 gm CO2 cartridges
57"Comprehensive maintenance of Remote HVLRs-Quarterly Basis: Testing, inspection, servicing and maintenance of Remote operated High Volume Long Range Monitors (HVLRMs) on quarterly basis includ ing supply of all required tools, tackles, material, consumable item, man power etc required for making the RHVLR in healthy & worki ng condition. Maintenance of the updown, left right, and fog jet motors including necessay spares, Oiling & greasing through grease nippleprovid ed on bearing, worm wheel and worm shaft, cleaning of housing and equipment, functioning of remote control panel, ensuring proper ti ghtning of flanges, clearing the debris around the nozzle, cleaning of the monitor etc as per approved procedure including tools & t ackles, report submission complete as per direction of Site Engineer / EIC. Water resistant low friction synthetic grease, grease gu n and all other consumable etc shall be arranged by vendor."
58"MAINTENANCE OF FOAM TROLLEY OF CAPACITY-Monthly Basis: For 5 KL FOAM TROLLEY - Oiling & greasing through grease nipple provided on bearing, worm wheel and worm shaft, suspension plate, cl eaning, performance checking including air charging of tyres of foam filled trolley, strainer inspection, reporting foam level in fo am trolleys by taking measurement from dip hatch checking proper functionality, movement of trolley by tractor (arranged by vendor i n all respect driver tractor fuel manpower etc , grease etc) & carrying out road test for complete plant areaon monthly basis comp lete in all respect and submitting report. "
59"MAINTENANCE OF MEFG system-Monthly Basis: Assistance in performance checking of MEFG with water/AFFF on monthly basis including cleaning & moppingof inline inductor, tank, MEFG, tank strainer including tools & tackles , report submission complete as per direction of Site Engineer / EIC."
60Cleaning/ De-chocking of nozzles ofwater curtain system at Control Building by opening nozzle, dechocking & refitting the same as per direction of site engineer/ EIC complete in all respect including labour , tools tackles, consumable etc-Monthly Basis
61Supply & changing of level pipes (hollow) of Acrylic/glass in foam tank of foam pourer, foam trolley unitetc. inclsive of all tool s & tackles, consumable, transportation etc dia and height may vary from 8 mm to 12 mm and 1 to 2 m subsequently. Rates per unit
62"Assistance in hydrotesting offire fighting delivery hose on half-yearly basis (Type A and B ) by making arrangement of hydraulic pump, blind, shifting from plant area, building, drying etc as per approved procedure including tools & tackles, report submission c omplete as per direction of Site Engineer / EIC. Delivery hose of dia 63 mm"
63Servicing of solenoid valve of deluge valve of foam flooding system on quarterly basis.
64"Statutory testing as per Environment Protection Act 1986: Once in a year Note: All the below tests have to be carried out by the laboratories recognized under the Environment (Protection) Act, 1986 empaneled by the Ministry of Environment, Forest and Climate Change (https://cpcb.nic.in/env-protection-act/), Government of India having certifi cate of competency valid for the respective year of testing. Bidder has to arrange such laboratories to carry out the testing."
65Drinking water testing including all parameters as per IS 10500:2012,All physical-chemical characteristics,Desirable Characteristics ,Trihalomethanes,Radioactive Materials,Bacteriological parameters,MicrobiologicalExamination& Pesticides as well as all the para meters required as per standard.
66Ambient air sampling,monitoring,analysis & providing test reportin total 12 parameter as per NAAQS- Nov 2009 )
67"Monitoring of Stack emission of all type of engine exhaustfor temperature, velocity, suspended particular matter (SPM), Sulphur d ioxide (SO2), Nitrogen dioxide (NO2) & Carbon monoxide (CO).All the tests required to be performed as per CPCB norms "
68"Noise Level Monitoring (Day & Night) at various places as instructed by EIC/site engineer "
69"Testing, Inspection and Certification of Compressed Air Vessels, and Lifting Tools & Tackles: Once in a year Note: All the below tests have to be carried out by the laboratories empaneled by the Delhi Government of India (https://labour.delh i.gov.in/home/Office-of-the-Labour-Commissioner) having certificate of competency valid for the respective year of testing. Bidder h as to arrange such laboratories to carry out the testing."
70"Inspection, load testing & certification of HOT crane (including chain pulley block of cranes) of 3 to 10 Ton capacity, painting ofdate of testing, serial no. & next due date on crane as per the stipulations of the the factories Act 1948 & amendments there on an d issuing certificate of testing / inspection for each crane including manpower, equipment, Dead weights / load required for testing , tools & tackles etc., as directed by Site Engineer / Engineer-in-Charge. Note: Dead weights / load shall be arranged by the bidder at test locations."
71"""Inspection, load testing & certification of chain pulley blocks, wire slings, ropes1 to 5 Ton capacity painting of date of test ing, serial no. & next due date on pulley blocks as per the stipulations of the factories Act 1948 & amendments there on and issuingcertificate of testing / inspection for each chain pulley block (Frequency- once in a year) including manpower, equipment, tools & tackles etc., as directed by Site Engineer / Engineer-in-Charge. Note: Dead weights / load shall be arranged by the bidder at test locations."
72Ultrasonic thickness testing of pressure vessels (Frequency- twice in a year), painting of date of testing, serial no. & next due da te on air vessel as per the stipulations the factories Act 1948 & amendments there on and issuing certificate of testing / inspectio n for each air vessels inclusive of all tools & tackles, labourers, testing equipment etc., to the satisfaction of the Engineer-in-C harge.
73Inspection, hydrostatic testing of air pressure vessels - safe working pressure equal to or less than 20 kg/ sq. cm and Inspection a nd Pressure testing of set points for safety Valve of Air Receivers, painting of date of testing, serial No. & next due date on air vessels as per the stipulations of the the factories Act 1948 & amendments there on and issuing certificate of testing / inspection for each air vessels inclusive of all tools & tackles, labourers, testing equipment etc., to the satisfaction of the Engineer-in-Cha rge
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail