Aligarh Development Authrority-ADA has published Tender For Construction Of Park And Parking Sector-9 At Transport Nagar Yojna Aligarh. Submission Date for this Tender is 25-11-2023. Shed Construction Tenders in aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 21-Nov-2023 | Corrigendum date | Date | 25-11-2023 |
Sl. No. | Item Description |
1 | Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table no, 300-2 Carted earth 8 km. As per MORTH Specification 305/SI No 3.18 |
2 | Construction ofGranular Sub Base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to acheive the desired density, complete As per MORTH Specification 401/SI No 4.1 |
3 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work. in Foundation and floors.SI No. 275(a) UPPWD SOR 2022 |
4 | Cement Concrete Pavement (C.C Road) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) (1:1.5:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1500. Page 72 |
5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
6 | 40 mm thick brick tile work 115 mm deep with 1:3 mortar in expansion joints of C.C road slab as per direction of E/I. including cost of all material, labour and T&P required for proper completion of work. CSI No 17.11 |
7 | Finishing the surface of C.C Road slab with the help of power trowel after dewatering of road slab and finishing with pre blended cementitious floor hardener (Product Dr. Fixit Piditop 333) as per the specification provided by the department rate including all labour, material and T&P etc. required for proper completion of work as per direction of E/I CSI No 17.19 |
8 | EXCAVATION infoundation inordinary Soil ( Loam, clay or sand ) including lift upto 1.5m and lead upto 30mand including filling wateringand rammingof excavated earth into the trenches or into the space between the building and thesides offoundation trenches or into the plinth and removal& disposal of surplus earthas directed by the Engineer-In-Charge upto a distanceof 30 m.from foundation trenches by hydraulic excavator/manual means. For building/drain work only |
9 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work. in Foundation and floors.SI No. 275(a) UPPWD SOR 2022 |
10 | Providing & Laying in positionspecified grade of reinforced cement concrete, with 1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) including the cost of centering, shuttering, finishing and excluding reinforcement . All work upto plinth level SI No 5.1.2 (a) UPPWD SOR 2022 |
11 | Brick work with common burnt clay F.P.S (non modular) bricks of class Mdesignation -100 class brickwork 1:4 Cement and Coarse sand for Foundation UPPWD SOR 2022SI no 6.1.1 page 30 |
12 | R C C work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Including the cost of centering, shuttering, finishing and excluding reinforcement 1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) upto plinth level SI No 5.2.2 (a) UPPWD SOR 2022 |
13 | R C C work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Including the cost of centering, shuttering, finishing and excluding reinforcement .1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size)above plinth level upto fifth floor level SI No 5.2.2 (a) UPPWD SOR 2022 |
14 | R C C work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Including the cost of centering, shuttering, finishing and excluding reinforcement .1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size)above plinth level upto fifth floor level SI No 5.2.2 (a) UPPWD SOR 2022 |
15 | Brick work with common burnt clay F.P.S (non modular) bricks of class designation -100 cement mortar (1:4 Cement and Coarse sand) in Super structure.above plinth level upto fifth floor level. UPPWD SOR 2022SI no 6.4.1 page 30 |
16 | 12mm thick cement plasteron brick work with cement mortar of mix (upto 10m height from ground level) in 1:4 (1 cement:4 Coarse sand) UPPWD SOR 2022 SI no 584 (ii)page 55 |
17 | 15mm thick cement plasteron rough side of single or halfbrick wall with cement mortar of mix (upto 10m height from ground level) in 1:4 (1 cement:4 Coarse sand) UPPWD SOR 2022 2 New (ii)page 55 |
18 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
19 | Finishing walls with acrylic smooth exteriorpaint (Apex) of required shade: New work (2 or more coat applied @ 1.67litre per 10 sqm over and including priming coat of exterior primer applied @ 2.20kg per 10 sqm) UPPWD SOR 2022 SI No 21new Page 63 |
20 | Mild Steel iron grill, balcony & staircase railing of a approved quality and drawing including supply of all materials, fabrication, labour, T&P in all respect as per direction of Engineer-In-Charge for proper completion of work at site.SI No.16 New UPPWD SOR-2022 |
21 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade of two or more coats on old work including priming coat with ready mix red oxide zinc chromate primer of approved brand and manufacture on galvanized iron/ steelwork including cost of all materials, labour T&P etc. complete required for proper completion of the work. SI no (2New+3New)(33+80)=113 Page 61 |