Numaligarh Refinery Limited has published Tender For Floating Roof Rim Seal Fire Detection And Protection System. Submission Date for this Tender is 03-01-2024. Flame Detectors Tenders in numaligarh Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-Nov-2023 | COMMERCIAL ADDENDUM_01 | Terms and Conditions | 29-11-2023 |
2 | 28-Nov-2023 | CORRIGENDUM_01 | Date | 06-12-2023 |
3 | 06-Dec-2023 | CORRIGENDUM_02_COMMERCIAL | Date | 13-12-2023 |
4 | 08-Dec-2023 | COMMERCIAL ADDENDUM_02 | Other | 13-12-2023 |
5 | 13-Dec-2023 | CORRIGENDUM_03_COMMERCIAL | Date | 20-12-2023 |
6 | 20-Dec-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 27-12-2023 |
7 | 22-Dec-2023 | TQ_RESPONSE_01 | Other | 27-12-2023 |
8 | 26-Dec-2023 | TECHNICAL ADDENDUM_03 | Other | 03-01-2024 |
9 | 26-Dec-2023 | CORRIGENDUM_04_COMMERCIAL | Date | 03-01-2024 |
Sl. No. | Item Description |
1 | The scope of this requisition shall include, but not limited to design, engineering, manufacturing, assembly, fabrication, painting and coating, supply of materials,Supply of Start-up / Commissioning Spare parts,Supply of Complete set of special tools required for Installation, operation, and maintenance. shop testing, inspection & testing, packing for delivery, Installation, Erection, Commissioning & configuration, documentation, operating and maintenance manuals & transportation of Floating Roof Rim Seal Fire Detection & Protection Systemas per Material Requisition (MR) with reference TP-1ZZZA-SA-RFQ-0001_D4 |
2 | The scope of this requisition shall include, but not limited to design, engineering, manufacturing, assembly, fabrication, painting and coating, supply of materials,Supply of Start-up / Commissioning Spare parts,Supply of Complete set of special tools required for Installation, operation, and maintenance. shop testing, inspection & testing, packing for delivery, Installation, Erection, Commissioning & configuration, documentation, operating and maintenance manuals & transportation of Floating Roof Rim Seal Fire Detection & Protection Systemas per Material Requisition (MR) with reference TP-1ZZZA-SA-RFQ-0001_D4 |
3 | Training (Operation, configuration and maintenance) of the entire system toOwner personnelat NREP Sitefor 5 days for the entire System (For atleast 10 Personnel). |
4 | External Training:Training at OEM/ Vendor works (PLC,Heat Detection Unit etc.) (Operation, configuration and maintenance): for 3 days for 2 Batches (4 person per batch). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail