| 1 | Construction of Access Road. |
| 2 | Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum. in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department. |
| 3 | Filling foundation and plinth with sand and well watered & rammed etc. complete including cost of sand. |
| 4 | Cement concrete(1:2:4) with 12mm size hard broken granite chips (crusher broken) including all cost, conveyance, royalty etc. complete. |
| 5 | Providing & laying 60mm thick heavy duty factory made pre-cast inter locking cement concrete paver block of M-30 Grade made by Table Vibratory method of required strength of approved design & shape laid in requird colour & pattern over 50mm thick compacted bed of coarse snd to required level filling the joints with fine sand etc. complete as per the direction of Engineer-in-charge. |
| 6 | Construction of Toilet Complex/ Dress changing room . |
| 7 | Dismentaling and removing 2.5cm Thick artificial stone flooring including stacking the useful materials for reuse and removing the debries within 50m lead. |
| 8 | C.B Brick masonry in cement mortar (1:6) by using 9\" size C.B. Bricks including all cost, conveyance etc. complete as per the direction of Engineer-in-charge. |
| 9 | 16mm thickcement plaster(1:6) for brick or work stone masonry |
| 10 | Supplying,fitting,fixing fully glazed aluminium framed openable doors using 15 micron anodized OEL aluminium section 2082 as out section, 9139 as mulion section, 4124 as a shutter section frame with tappered clip of section 4125, aluminium angle, rubber beading, friction stay, handle etc. with 5mm black glass including all fitting cost of all materials , all taxes labour T&P etc. complete as per the direction of Engineer-in-charge. |
| 11 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint. |
| 12 | Supplying,fitting and fixing of vetrified tile of premium grade having thickness 8mm to 10mm conforming to IS 13756 of size 60mm*60mm plain (lvory)in floors with application of polymore modified cement water resistence adhesive bed of required thickness of 10mm and filling jpoints with epoxy grout of approved quality including cost of all materilas labour T&P taxes etc complete |
| 13 | Providing and fixing Ceramic tiles in dados,skirtings and risers of steps on 12mm thick cement plaster (1:3) joint with neat slury mixed with pigmant to match the shades of the tiles including rubbing and poloshing complete including cost of precast tiles as directed by the Engineering-in-charge. |
| 14 | Finishing walls with weather coat of approved shade on new work coat to give an even shade including cost of paint. |
| 15 | Construction of Watch Tower . |
| 16 | Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum. In volumr within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layernot exceeding 0.3m. In depth and as per specification apprived by the department. |
| 17 | Filling foundation and plinth with sand well watered & rammed etc complete including cost of sand. |
| 18 | Cement Concrete (1:3:6) by using 4cm. Size B.H.G metal cost conveyance etc. coplete |
| 19 | R.R stone mesonary with C.M (1:6) with all cost,convenyanace, etc. complete |
| 20 | C.B Brick masonary in cement mortar (1:6) by using 9\" C.B Bicks including all cost,conveyance etc. complete. |
| 21 | R.C.C. work of M 20 using 20mm and down graded hard granite (Crusher boken) chips incluing laying,hoisting,centring & shuttering with all cost,coveyance. Etc. complete. |
| 22 | Column Base |
| 23 | Lintel Bend |
| 24 | Plinth Bend |
| 25 | Roof slab |
| 26 | Beams & Columns |
| 27 | Stairs |
| 28 | Supplying,fitting & placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 29 | 12mm thick cement plaster (1:6) for brickwork. |
| 30 | 16mm thick cement plaster (1:6) for brick or work stone masonary. |
| 31 | Finishing walls with weather coat of approved shade on new work two coat over a coat oil bound cement primer to give an even shade including cost of paint and primer. |
| 32 | Distempering two coats to walls with distemper of approved shade on newwork to give an even shade over a coat of oil bound primer including cost of distemper and promer. |
| 33 | Supplying of MS Door, window and grills etc. complete as per the deisgn and as per dircted by Engineer-in-charge |
| 34 | Labour for Fitting & fixing of MS Door, window and grills etc. complete as per the deisgn and as per dircted by Engineer-in-charge |
| 35 | Painting two coat with any approved pain over a coat of primer including cost of paint & primer |
| 36 | Supplying,fitting and fixing of vetrified tile of premium grade having thickness 8mm to 10mm conforming to IS 13756 of size 600mmx600mm plain (lvory)in floors with application of polymore modified cement based water resistence adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materilas, labour T&P taxes etc complete required for the work as per direction of the Engineering-in-charge(for repair work only) |
| 37 | C.B Brick masonary in cement mortar (1:6) by using 9\" C.B Bicks including all cost,conveyance etc. complete. |
| 38 | R.C.C. work of M 20 using 20mm and down graded hard granite (Crusher boken) chips incluing laying,hoisting,centring & shuttering with all cost,coveyance. Etc. complete. |
| 39 | Lintel Bend |
| 40 | Roof slab |
| 41 | Beams & Columns |
| 42 | Stairs |
| 43 | Supplying,fitting & placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 44 | 12mm thick cement plaster (1:6) for brickwork. |
| 45 | 16mm thick cement plaster (1:6) for brick or work stone masonary. |
| 46 | Finishing walls with weather coat of approved shade on new work two coat over a coat oil bound cement primer to give an even shade including cost of paint and primer. |
| 47 | Distempering two coats to walls with distemper of approved shade on newwork to give an even shade over a coat of oil bound primer including cost of distemper and promer. |
| 48 | Supplying of MS Door, window and grills etc. complete as per the deisgn and as per dircted by Engineer-in-charge |
| 49 | Labour for Fitting & fixing of MS Door, window and grills etc. complete as per the deisgn and as per dircted by Engineer-in-charge |
| 50 | Painting two coat with any approved pain over a coat of primer including cost of paint & primer |
| 51 | Supplying,fitting and fixing of vetrified tile of premium grade having thickness 8mm to 10mm conforming to IS 13756 of size 600mmx600mm plain (lvory)in floors with application of polymore modified cement based water resistence adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materilas, labour T&P taxes etc complete required for the work as per direction of the Engineering-in-charge(for repair work only) |
| 52 | C.B Brick masonary in cement mortar (1:6) by using 9\" C.B Bicks including all cost,conveyance etc. complete. |
| 53 | R.C.C. work of M 20 using 20mm and down graded hard granite (Crusher boken) chips incluing laying,hoisting,centring & shuttering with all cost,coveyance. Etc. complete. |
| 54 | Roof slab |
| 55 | Beams & Columns |
| 56 | Supplying,fitting & placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 57 | 12mm thick cement plaster (1:6) for brickwork. |
| 58 | 16mm thick cement plaster (1:6) for brick or work stone masonary. |
| 59 | Finishing walls with weather coat of approved shade on new work two coat over a coat oil bound cement primer to give an even shade including cost of paint and primer. |
| 60 | Distempering two coats to walls with distemper of approved shade on newwork to give an even shade over a coat of oil bound primer including cost of distemper and promer. |
| 61 | Supplying of MS Door, window and grills etc. complete as per the deisgn and as per dircted by Engineer-in-charge |
| 62 | Labour for Fitting & fixing of MS Door, window and grills etc. complete as per the deisgn and as per dircted by Engineer-in-charge |
| 63 | Painting two coat with any approved pain over a coat of primer including cost of paint & primer |
| 64 | Supplying,fitting and fixing of vetrified tile of premium grade having thickness 8mm to 10mm conforming to IS 13756 of size 600mmx600mm plain (lvory)in floors with application of polymore modified cement based water resistence adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materilas, labour T&P taxes etc complete required for the work as per direction of the Engineering-in-charge(for repair work only) |
| 65 | Construction of Resting Shed . |
| 66 | Earth work in stony earth and gravels mixed with stone and boulder not exceeding 0.014 cum. In volumr within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m. In depth and as per specification apprived by the department. |
| 67 | Filling foundation and plinth with sand & well watered & rammed etc complete including cost of sand. |
| 68 | Cement Concrete (1:3:6) by using 4cm. Size B.H.G metal cost conveyance etc. coplete |
| 69 | R.R stone mesonary with C.M (1:6) with all cost,convenyanace, etc. complete |
| 70 | C.B Brick masonary in cement mortar (1:6) by using 9\" C.B Bicks including all cost,conveyance etc. complete. |
| 71 | R.C.C. work of M 20 using 20mm and down graded hard granite Crusher boken chips incluing laying,hoisting,centring & shuttering with all cost,coveyance. Etc. complete. |
| 72 | Column Base |
| 73 | Lintel |
| 74 | Plinth Bend |
| 75 | Roof Slab |
| 76 | Beams & Columns |
| 77 | Supplying,fitting & placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 78 | 12mm thick cement plaster (1:6) for brickwork. |
| 79 | 16mm thick cement plaster (1:6) for brick or work stone masonary. |
| 80 | Finishing walls with weather coat of approved shade on new work two coat over a coat oil bound cement primer to give an even shade including cost of paint and primer. |
| 81 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade over a coat of oil bound primer including cost of distemper and promer. |
| 82 | Cement concrete (1:2:4) with 12mm size hard broken granite chips (Crusher broken) including all cost |
| 83 | 2.5 cm thick Artificial stone flooring with cement concrete (1:2:4) including punning using 12mm size crusher broken granite chips as per direction of Engineering-in-charge |
| 84 | Construction of Entrance Gate . |
| 85 | Earth work in stony earth and gravels mixed with stone and boulder not exceeding 0.014 cum. In volumr within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m. In depth and as per specification apprived by the department. |
| 86 | Filling foundation and plinth with sand & well watered & rammed etc complete including cost of sand. |
| 87 | Cement Concrete (1:3:6) by using 40 mm and downgraded hard broken hg metal including cost conveyance etc. coplete |
| 88 | R.C.C. work of M 20 using 20mm and down graded hard granite Crusher boken chips incluing laying,hoisting,centring & shuttering with all cost,coveyance. Etc. complete. |
| 89 | Column Base |
| 90 | Columns & Beam |
| 91 | Supplying,fitting & placking uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 92 | Providing and fixing Granite tiles in dados,skirtings and risers of steps on 12mm thick cement plaster (1:3) joint with neat slury mixed with pigmant to match the shades of the tiles including rubbing and poloshing complete including cost of precast tiles as directed by the Engineering-in-charge. |
| 93 | Construction of Drinking Water facility . |
| 94 | Earth work in stony earth and gravels mixed with stone and boulder not exceeding 0.014 cum. In volumr within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m. In depth and as per specification apprived by the department. |
| 95 | Filling foundation and plinth with sand & well watered & rammed etc complete including cost of sand. |
| 96 | Cement Concrete (1:3:6) by using 4cm. Size B.H.G metal cost conveyance etc. coplete |
| 97 | C.B Brick masonary in cement mortar (1:6) by using 9\" C.B Bicks including all cost,conveyance etc. complete. |
| 98 | R.C.C. work of M 20 using 20mm and down grade black granite (Crusher boken) stone chips incluing laying,hoisting. |
| 99 | Rigid smooth centring & shuttering for R.C.C works including false works and dismentaling then after casting |
| 100 | Supplying,fitting & placking uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 101 | Cemnt concrete (1:2:4) with 12mm. Size hard broken granite chips (crusher broken) including all cost,conveyance,royality etc. complete |
| 102 | Providing and fixing Vertified tile in dados,skirtings and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles sa directed by the Engineering-in-charge. |
| 103 | Construction of Food Kiosks . |
| 104 | Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum. in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department. |
| 105 | Filling foundation and plinth with sand and well watered & rammed etc. complete including cost of sand. |
| 106 | Cement Concrete (1:3:6) by using 4cm. Size B.H.G metal including cost, conveyance etc.Complete. |
| 107 | R.R stone masonry with C.M. (1:6) with all cost, conveyance,etc. complete. |
| 108 | C.B Brick masonary in cement mortar(1:6) by using 9\" size C.B Bricks including all cost, conveyance etc. complete. |
| 109 | RCC work of M20 grade with 20mm and down grade black hard granite(cusher broken) stone chips including hoisting and laying. |
| 110 | Column Base |
| 111 | Lintel Bend |
| 112 | Plinth Bend |
| 113 | Beams & Columns |
| 114 | Supplying,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 115 | 12mm thick cement plaster(1:6) for brick work |
| 116 | 16mm thick cement plaster (1:6) for brick or work stone masonry |
| 117 | Finishing walls with weather coat of approved shade on new work two coat over acoat oil bound cement primer to give an even shade including cost of paint and primer |
| 118 | Distempering two coats to walls with distemper of approved shade on newto given an even shade including cost of distemper and primer |
| 119 | 2.5 cm thick artificial stone flooring with cement concrete (1:2:4) including punning using 12mm size crusher broken granite chips as per direction of Engineer-in-charge |
| 120 | Supplying,fitting,fixing of vertifed tile of premium grade having thickness 8mm to 10mm conforming to IS 13756 of size 60cm x 60cm plain (Ivory) in floors with application of polymer modified cement based water resistance adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materials, labour,T&P,taxes etc complete required further work as per direction of the Engineering-in-charge (For repair work only) |
| 121 | Providing and fixing Granite tiles in dados, skirtings and risers of steps on 12mm thick cement plaster (1:3) joint with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge |
| 122 | Providing & laying 60mm thick heavy duty factory made pre-cast inter locking cement concrete paver block of M-30 Grade made by Table Vibratory method of required strength of approved design & shape laid in requird colour & pattern over 50mm thick compacted bed of coarse snd to required level filling the joints with fine sand etc. complete as per the direction of Engineer-in-charge. |
| 123 | Supplying,fitting & fixing of GI square pipe 2\"x2\" purlin including all cost with fabication with charges etc complete |
| 124 | Supplying,fitting & fixing of2\"x2\"GI square pipe trussess including all cost with fabication with charges trussess |
| 125 | Supplying,fitting & fixing ofJew Tin including all cost etc complete |
| 126 | Construction of Illumination . |
| 127 | Installation of 3 nos. of High mass lights. |
| 128 | Installation ofof Mini mass lights. |
| 129 | Note: The bidders have to quote their rate for the aforesaid items including cost of all materials, conveyance, taxes of all materials, cess, royalty as applicable, incidental charges and T&P etc. so as to complete the item as per specifications, drawings and direction of Engineer-in-Charge. |