}

Tender For Madurai District Construction Of 100000 Litre Capacity 12M Stagging Height To Checkkanoorani Village And A.Kokkulam Panchayatvillage And Panchayat Thirumangalam Block Mvs 2022-2023, thirumangalam-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Madurai District Construction Of 100000 Litre Capacity 12M Stagging Height To Checkkanoorani Village And A.Kokkulam Panchayatvillage And Panchayat Thirumangalam Block Mvs 2022-2023. Submission Date for this Tender is 08-11-2023. Bolts Tenders in thirumangalam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40519383
Tender For Madurai District Construction Of 100000 Litre Capacity 12M Stagging Height To Checkkanoorani Village And A.Kokkulam Panchayatvillage And Panchayat Thirumangalam Block Mvs 2022-2023
Tender
Indian
Tamil Nadu
Thirumangalam
08-11-2023

Tender Details

Madurai District Construction Of 100000 Litre Capacity 12M Stagging Height To Checkkanoorani Village And A.Kokkulam Panchayatvillage And Panchayat Thirumangalam Block Mvs 2022-2023 , Name Of Work:Madurai District Construction Of 100000Litre Capacity 12M Stagging Height To Checkkanoorani Village And A.Kokkulam Panchayatvillage And Panchayatthirumangalamblock Mvs 2022-2023 , Earth Work Excavation For Foundation And Depositing On Bank For Refilling Within An Initial Lead Of 10.00 M And An Initial Lift Of 2.00 In Hard Stiff Clay. Stiff Black Cotton Soil, Hard Red Earth, Sales, Murrams, Gravel, Stoney Earth, Earth Mixed With Sma , Earth Work Excavation For Foundation And Depositing On Bank For Refilling Within An Initial Lead Of 10.00 M And An Initial Lift Of 2.00 In Hard Stiff Clay. Stiff Black Cotton Soil, Hard Red Earth, Sales, Murrams, Gravel, Stoney Earth, Earth Mixed With Sma , Supplying And Filling With Good River Sand From Approved Quarry Layers Not More Than 15 Cmincluding Cost And Conveyance Of All Materials And All Labour Charges For Filling, Watering & Consolidation Etc., Complete As Per Standard Specification 24 &25 Nbc , Plain Cement Concrete 1:4:8 Mix, (One Part Of Cement, Four Part Of Sand Andeight Part Of Aggregate) Mix Using 40Mm Iss Hbg Metal From Approved Quarry Including Cost And Conveyance Of All Materials And All Labour Charges For Mixing, Laying, Compacting An , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Rcc Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Supply And Erection Of Steel Centering, Shuttering For Soffits And Sides Including Necessary Support Strutting For All Rcc Works Using Ms Sheets Of Suitable Size Of Bg 10 Stiffened With Ms Angle Of Size 25X25x3mm For Boarding Laid Over Silver Oak Joists O , Steel Centering For 0 To 3.30 M (Plane Surface) , Steel Centering Plane Surface 3.30 M To 4.30M , Steel Centering Plane Surface 6.30 M To 7.30M , Steel Centering Plane Surface 11.30 M To 12.30M , Steel Centering Square Column 0 M To 3.30M , Steel Centering Square Column 3.30 M To 4.30M , Steel Centering Square Column 4.30 M To 5.30M , Steel Centering Square Column 5.30 M To 6.30M , Steel Centering Square Column 6.30 M To 7.30M , Steel Centering Square Column 7.30 M To 8.30M , Steel Centering Square Column 8.30 M To 9.30M , Steel Centering Square Column 9.30 M To 10.30M , Steel Centering Square Column 10.30 M To 11.30M , Steel Centering Square Column 11.30 M To 12.30M , Steel Centering Square Column 12.30 M To 13.30M , Steel Centering Square Column 13.30 M To 14.30M , Steel Centering Square Column 14.30 M To 15.30M , Steel Centering Up To I Ll Curved Surface 0 M To 3.30M , Steel Centering Round Column 0 M To 3.30M , Steel Centering Round Column 3.30 M To 4.30M , Steel Centering Round Column 4.30 M To 5.30M , Steel Centering Round Column 5.30 M To 6.30M , Steel Centering Round Column 6.30 M To 7.30M , Steel Centering Round Column 7.30 M To 8.30M , Steel Centering Round Column 8.30 M To 9.30M , Steel Centering Round Column 9.30 M To 10.30M , Steel Centering Round Column 10.30 M To 11.30M , Steel Centering Round Column 11.30 M To 12.30M , Steel Centering Round Column 12.30 M To 13.30M , Steel Centering Round Column 13.30 M To 14.30M , Steel Centering Round Column 14.30 M To 15.30M , Steel Centering Round Column 15.30 M To 16.30M , Steel Centering Round Column 16.30 M To 17.30M , Steel Centering Round Column 17.30 M To 18.30M , Supply And Fabrication Of Steel Using Tmt Rodsfor All Reinforced Cement Concreteworks Including Cost And Conveyance Of All Materials And All Labour Charges For Cutting, Bending And Placing The Rod In Position And Tying Up The Rods With Binding Wire An , Painting Two Coats With Emulsion Paint Of Approved Colour And Quality Including Cost Andconveyance Of All Materials And Labour Chargesand Other Incidental Charges To Site Etc., Complete.As Per Standard Specification , Refilling The Foundation With Excavated Soil (Other Than Sand) Including Cost And Conveyance Of All Materials And Labour Charges To Siteand Other Incidental Charges Etc., Complete As Per Standard Specification , Providing And Fixing Ofrcc Hand Rails In Position Of Approved Design For One Metre Heightincluding Cost And Conveyance Of All Materials And Labour Charges To Site Etc., Complete , Supply Of Followingheavy Duty G.I. Pipe And Specialsconforming To Is 1239/Part I/90 Of Approved Make Including Cost Andconveyance Of All Materials And Labour Chargesand Other Incidental Charges To Site Etc., Complete.As Per Standard Specificatio , 1) 80Mm Gi Pipe (Heavy Duty) , 2) 80Mm Gi Coupling (Heavy Duty) , 3) 80 Mm Gi Elbow (Heavy Duty) , 4) 80 Mm Gm Gate Valve (Heavy Duty) , 5) 80 Mm Gi Union (Heavy Duty) , 6) 80 Mm Gi H Nipple (Heavy Duty) , 7) 100 Mm Gi Pipe (Heavy Duty) , 8) 100 Mm Gi Coupling (Heavy Duty) , 9) 100Mm Gi Elbow (Heavy Duty) , 10) 100 Mm Gm Gate Valve (Heavy Duty) , 11) 100 Mm Gi Union (Heavy Duty) , 12) 100 Mm Gi H Nipple (Heavy Duty) , Fabrication, Supply, Delivery And Fixing Of Outside Ms Ladder Of 45Cm Clear Widemade Out Of 50 Mm X 50Mm X 6Mm Ms Angle For Both Sides And For Steps At 30Cm C/C Welded Jointed Etc ., For I Staging From Gl To 1St Level Brace (Weight4.5Kg/M) Iind And Iiird Staging Upto Floor Slab And Ivth Staging From Floor Slabto Roof Top. Supply, Delivery And Fixing Of 32 Mm Gi Pipes Medium For Hand Railsfrom I Stage To Ivth Stage. Rcc M30 Grade Mix For Landing Slab 5 Nos. Atground Level- 1No. And Above Ground Level - 4Nos. Supply And Fixing Of 32Mmgi Pipe Medium For Hand Rails For The Landing Slab. Supplying And Fixing Of Msbase Plate Of 100Mm X 100Mm X 6Mm Thick For Fixing Anchore Fastener Bolt For Fixing Of Hand Rails At Landing Slab And Ms Ladder Providing Lockingarrangements With Two Coats Of Approved Enamel Paint Over One Coat Of Redoxide Paint As Per Approved Type Design And As Directed By Twad Board Officers. , Supply And Delivery Of The Followingpvc/ Gi Pipes And Specials , 50 Mm Gi Pipe , 50Mm Gi Coupling , 50Mm Gi Elbow , 50Mm Gi Bend , 50Mm Gi Union , 50 Mm Gm Gate Valve , 50Mm Gi Hex Nipple , 20Mm Gi Pipe , 20Mm Gi Coupling , 20Mm Gi Elbow , 63Mm Dia Pvc Pipe , 63Mm Dia Pvc Tee , 63Mm Dia Pvc Elbow , 63Mm Dia Pvc Mta , Supply Of Followingheavy Duty G.I. Pipe And Specialsconforming To Is 1239/Part I/90 Of Approved Make Including Cost Andconveyance Of All Materials And Labour Chargesand Other Incidental Charges To Site Etc., Complete.As Per Standard Specificatio , 50 Mm Gi Pipe , 20 Mm Gi Pipe , Earth Work Excavation And Depositing On Bank With Initial Lead And Lift In Hard Gravelly Soil As Per Ss20 A For Surface Dressing Etc Complete (For Pvc Pipe Line) , Refilling Excavated Earth Including All Labour Charges Etc., , Labourcharges For Laying Of Gi Pipe In All Labour Charges Etc,. , Labourcharges For Laying Of Pvc Pipe In All Labour Charges Etc,. , Provision Forname Bord Chages & Photo Charges , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package}

Key Value

Document Fees
Refer document
EMD
INR 40000.0 /-
Tender Value
INR 40 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail