}

Tender For Repair / Maintenance Of Certain Package Type Ac Plant And Water Supply Pump House At Cod Agra And Mh Agra Age E/M(W) Of Ge (West) Agra, agra-Uttar Pradesh

Military Engineer Services-MES has published Tender For Repair / Maintenance Of Certain Package Type Ac Plant And Water Supply Pump House At Cod Agra And Mh Agra Age E/M(W) Of Ge (West) Agra. Submission Date for this Tender is 29-11-2023. HVAC Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

40452935
Corrigendum : Tender For Repair / Maintenance Of Certain Package Type Ac Plant And Water Supply Pump House At Cod Agra And Mh Agra Age E/M(W) Of Ge (West) Agra
Open Tender
Indian
Uttar Pradesh
agra
29-11-2023

Tender Details

Tender For Repair / Maintenance Of Certain Package Type Ac Plant And Water Supply Pump House At Cod Agra And Mh Agra Age E/M(W) Of Ge (West) Agra

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 22-Nov-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 29-11-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 70000.0 /-
Tender Value
INR 35 Lakhs /-

BOQ Items

Name of Work: REPAIR / MAINT OF CERTAIN PACKAGE TYPE AC PLANT AND WATER SUPPLY PUMP HOUSE AT COD AGRA AND MH AGRA AGE E/M (W) OF GE (WEST) AGRA
Sl. No. Item Description
1Labour only for servicing / repairing of package type central AC plant unit ( out door and Indoor unit, AHU) where required in ACs or as directed by Engr-in-Charge Or concern JE at site of CODto attend and rectfy the defects by settings of controls or by repair/ renewal work to air conditioning plant unit/ system etc as per standard engineering practice,along with all necessary tools etc and keeping proper record of maintenance record in register supplied by the contractor) .. Notes:- (i) Spare parts required for repair/ rectification of defects shall be mesured and paid saperatly under respactive itemshere in after. (ii) Contractor will ensureproper functioning ofAll AC plants at all workig days times.
2Note (Contd....) :- (iii) Repair work ofplant shall be carried out by well experienced technitions/ mechanic who has experienced/ working certificate form OEM with proper tools and safety measures. (iv) All petty small parts required for repair i.e. nuts, bolts, washers screws, saddles, grease, oil/ lubricants etc shall be provided by the contractor without any extra cost to the government. (vi) Location and place of complaints shall be as per requirement of maintenance work ofbldg in different areas of COD and MH under GE (W) Agra as directed by Engineer in charge/ JE concerned.(vii) Contractor shall be responsible to provide conveyence and required T&P for attend the complaints. (viii) Contractor shall be responsible for arrenging security passes from the concern department through there guidlines/ procesure.
3Labour only for servicing / repairing of water supply/ fire fightingsystem / installations where required or as directed by Engr-in-Charge Or concern JE at site of CODto attend and rectify the defects by settings of controls or by repair/ renewal work to water supply installations/ fire fighting systemetc as per standard engineering practice,along with all necessary tools etc and keeping proper record of maintenance record in register supplied by the contractor) .. Notes:- (i) Spare parts required for repair/ rectification of defects shall be mesured and paid saperatly under respactive itemshere in after or issued by deptt free for fixing only.. (ii) Contractor will ensureproper functioning ofAll installations at all workig days times.
4Note (Contd....) :- (iii) Repair work ofplant shall be carried out by well experienced technitions/ mechanic who has experienced/ working certificate form OEM with proper tools and safety measures. (iv) All petty small parts required for repair i.e. nuts, bolts, washers screws, saddles, grease, oil/ lubricants etc shall be provided by the contractor without any extra cost to the government. (vi) Location and place of complaints shall be as per requirement of maintenance work ofbldg in different areas of COD under GE (W) Agra as directed by Engineer in charge/ JE concerned.(vi) Contractor shall be responsible to provide conveyence and required T&P for attend the complaints. (vii) Contractor shall be responsible for arrenging security passes from the concern department through there guidlines/ procesure.
5Cleaning all filters of AHUs (Indoor units) alongwith its out door unit condensing coil of COD Adm Bldg, EDW,P-3 shed, medical store and medical ward, cleaning the filters with the help of blower & water pressure pump, suitable cleaning materials and washing with clean water to remove the complete dust particles and refixing the same to its original position including checking of tightness of all the nuts & bolts of out door units and combing of bend fins of out door units complete all as specified and directed. Note: All filters and outdoor units shall be cleaned fortnightly basis upto completion of the work.
6Checking/ detecting and arresting/rectifiying of the leakage by putting nitrogen gas pressure to entire system and rectifying the leakage where found by welding/ brazing/ soldering with copper electrode rod and holding nitrogen pressure in entire system for minimum 08 Hrs in package type AC units , Model No. DPUASC 220X,having compressor"s capacity 1x11.0 TR and material & labour for repairing the leakage if detected, vaccum & checking for vaccum pressure holding stand for 24 hrs and charging the refrigerant gas (M-22) as required and top up of compressor oil if required complete all as specified and directed. Note:- Refrigerant gas (M-22) and compressor oil shall be measured and paid saperatly under respactive item herein after.
7Checking/ detecting and arresting/rectifiying of the leakage by putting nitrogen gas pressure to entire system and rectifying the leakage where found by welding/ brazing/ soldering with copper electrode rod and holding nitrogen pressure in entire system for minimum 08 Hrs in package type AC units, Model No. DPUASC 875, having compressor"s capacity 1x8.75 TR and material & labour for repairing the leakage if detected, vaccum and charging the refrigerant gas (M-22) as required and top up of compressor oil if required complete all as specified and directed. Note:- Refrigerant gas (M-22) and compressor oil shall be measured and paid saperatly under respactive item herein after.
8Checking/ detecting and arresting/rectifiying of the leakage by putting nitrogen gas pressure to entire system and rectifying the leakage where found by welding/ brazing/ soldering with copper electrode rod and holding nitrogen pressure in entire system for minimum 08 Hrs in package type AC units,Model No. DPUASC 550, having compressor"s capacity 1x5.50 TR and material & labour for repairing the leakage if detected, vaccum and charging the refrigerant gas (M-22) as required and top up of compressor oil if required complete all as specified and directed. Note:- Refrigerant gas (M-22) and compressor oil shall be measured and paid saperatly under respactive item herein after.
9supply & fix in renewal the new sealed compressor of package type ACs of capacity 11.0 TR with and including anti vibration pad complete and repairing the leakage if detected after fixing/ fitting the compressor, vaccum and charging the refrigerant gas (R-22) as required and top up of compressor oil if required and testing on completion complete all as specified and directed. Notes:- (i)Refrigerant gas (R-22) and compressor oil shall be measured and paid saperatly under respactive item after for filling/topping up only. (ii) Contractor shall submit the manufacturer test certificate of compressor alongwith purchase vouchers to Engr-in-Charge for their verification and kept on record.
10supply & fix in renewal the new sealed compressor of package type ACs of capacity 8.75 TR with and including anti vibration pad complete and repairing the leakage if detected after fixing/ fitting the compressor, vaccum and charging the refrigerant gas (R-22) as required and top up of compressor oil if required and testing on completion complete all as specified and directed. Notes:- (i)Refrigerant gas (R-22) and compressor oil shall be measured and paid saperatly under respactive item after for filling/topping up only (ii) Contractor shall submit the manufacturer test certificate of compressor alongwith purchase vouchers to Engr-in-Charge for their verification and kept on record.
11supply & fix in renewal the new sealed compressor of package type ACs of capacity 5.50 TR with and including anti vibration pad complete and repairing the leakage if detected after fixing/ fitting the compressor, vaccum and charging the refrigerant gas (R-22) as required and top up of compressor oil if required and testing on completion complete all as specified and directed. Notes:- (i)Refrigerant gas (R-22) and compressor oil shall be measured and paid saperatly under respactive item after for filling/topping up only (ii) Contractor shall submit the manufacturer test certificate of compressor alongwith purchase vouchers to Engr-in-Charge for their verification and kept on record.
12supply & fix in renewal, thermostatic expansion valves suitable for 1x11 TR package type AC unit, working temp 110 centigrade and maximum operating pressure 68 PSI complete all as specified and directed.
13supply & fix in renewal,, thermostatic expansion valves suitable for 1x8.75 TR package type AC unit, working temp 110 centigrade and maximum operating pressure 68 PSI complete all as specified and directed.
14supply & fix in renewal, thermostatic expansion valves suitable for 1x5.50 TR package type AC unit, working temp 110 centigrade and maximum operating pressure 68 PSI complete all as specified and directed.
15supply & fix in renewal, moisture and liquid indicator suitable for 2x11 TR package type AC plants complete all as specified and directed.
16Supply & fix in renewal, eliminator filter drier complete all as specified and directed.
17Dismenteling & taking out existing defective/ burnt parts of AC electric blower motor of any description & in any position of capacity 5.0 HP for rewinding from approved workshop including transporting the same to workshop & back after rewinding the same motor with and including super enamelled copper winding wire of superior quality of existing size/ gauge & No of turns and insulation of the same with & including insulating materials such as leatherised fibre glass, illuminous paper, cotton tape, glass sleeving, insulating varnish etc as per manufacturers instructions including cutting and taking out existing burnt/ short circuited winding wires including renewal of existing bushes, bearings & starting condenser with new bushes, bearings & starting condenser complete and re-assembling and refixing of the same motor at its original position after repair, making all necessary connections, commissioning and testing on completion complete all as specified and directed.
18Dismenteling & taking out existing defective/ burnt parts of AC electriccondensor (Outdoor unit) fan motor of any description & in any position of capacity 375W for rewinding from approved workshop including transporting the same to workshop & back after rewinding the same motor with and including super enamelled copper winding wire of superior quality of existing size/ gauge & No of turns and insulation of the same with & including insulating materials such as leatherised fibre glass, illuminous paper, cotton tape, glass sleeving, insulating varnish etc as per manufacturers instructions including cutting and taking out existing burnt/ short circuited winding wires including renewal of existing bushes, bearings & starting condenser with new bushes, bearings & starting condenser complete and re-assembling and refixing of the same motor at its original position after repair, making all necessary connections, commissioning and testing on completion complete all as specified and directed.
19Supply & chargingnon freezing compressor oil of existing make in sealed containers of standard size complete all as specified and directed.
20supply & fix in renewal, fan belt of blower units of existing size complete all as specified and directed.
21supply & fix in renewal, fan blade (three blade) of existing size & model of condensor units of capacity 11.0 TR complete all as specified and directed.
22supply & fix in renewal, fan blade (four blade) of existing size & model of condensor units of capacity 8.75 TR complete all as specified and directed.
23supply & fix in renewal, fan blade (four blade) of existing size & model of condensor units of capacity 5.50 TR complete all as specified and directed.
24supply & fix in renewal, contactor suitable for blower motor of capacity 7.5HP complete all as specified and directed.
25supply & fix in renewal, power contactor suitable for compressor motor of capacity 15.0HP complete all as specified and directed.
26supply & fix in renewal, auxiliary contact suitable for mounting on contactor complete all as specified and directed.
27supply & fix in renewal, HRC catridge fuse 20A, (IS9224) complete all as specified and directed.
28supply & fix in renewal, glass fuses ofrated 6 Amps complete all as specified and directed.
29supply & fix in renewal, PMN MPD type microprocessor based controller card(sensor, display card, MPD & relay card) having range 11 to 35 Amps suitable for 2X11 TR package type AC units complete all as specified and directed.
30supply & fix in renewal, PMN MPD type microprocessor based controller card(sensor, display card, MPD & relay card) having range 7 to 22 Amps suitable for 1X8.75 TR package type AC units complete all as specified and directed.
31supply & fix in renewal, PMN MPD type microprocessor based controller card(sensor, display card, MPD & relay card) having range 7 to 22 Amps suitable for 2X5.50 TR package type AC units complete all as specified and directed.
32supply & fix in renewal, timer having range 1-10 Amps, 230 volts complete all as specified and directed.
33Supply & fix in renewal, connector three phase, 4-pole, 100 Amps rated complete all as specified and directed.
34supply & fix in renewal, connector single phase, 10 Amps rated complete all as specified and directed.
35supply & fix in renewal, heating element, 3KW, 240 volts, ISI marked suitable AHU chamber complete all as specified and directed.
36supply & fix in renewal, aucostic jali of existing/ approved pattern as in patchwork in AHU room of AC plants complete all as specified and directed.
37supply & fix in renewal, adjustable thermal & adjustable magnetic setting type MCCB three pole with enclosure, 415 volts, 50 Hz, 250 Amps with breaking capacity 25 kA complete all as specified & directed.
38supply & fix in renewal, adjustable thermal & adjustable magnetic setting type MCCB three pole with enclosure, 415 volts, 50 Hz, 200 Amps with breaking capacity 25 kA complete all as specified & directed.
39supply & fix in renewal, adjustable thermal & adjustable magnetic setting type MCCB three pole with enclosure, 415 volts, 50 Hz, 100 Amps with breaking capacity 16 kA complete all as specified & directed.
40supply & fix in renewal, adjustable thermal & fixed magnetic setting type MCCB three pole with enclosure, 415 volts, 50 Hz, 63 Amps with breaking capacity 16 kA complete all as specified & directed.
41supply & fix in renewal, control fuse with base of capacity 2 to 20 Amps complete all as specified and directed.
42supply & fix in renewal,, earth fault relay with CBCT, 230 volts AC, coil of capacity 0-100 Amps complete all as specified and directed.
43supply & fix in renewal, earth fault relay with CBCT, 230 volts AC, coil of capacity 0-40 Amps complete all as specified and directed.
44supply & fix in renewal, contactor 3 pole with AC coil of capacity 25 Amps complete all as specified and directed.
45supply & fix in renewal, indication lamp LED type, 22.5mm dia, 230 volts complete all as specified and directed.
46supply & fix in renewal, MCB TP, "C" series, 63 Amps, 415 volts, 50Hz, 10kA complete all as specified & directed.
47supply & fix in renewal, MCB TP, "C" series, 40 Amps, 415 volts, 50Hz, 10kA complete all as specified & directed.
48Supply & Charging refrigrant gas M-22 in cylinders of required capacity including transportation, loading/ unloading and collection of empty cylinders from MES store yard of AGE E/M and returned the same cylinder or other cylinder duly filled and testing of cylindeers including test certificate by authorised agencies complete all as specified and directed.
49M&L for fixing new evaporative/cooling coil in renewal of existing in door unit including jointing all liquid and gas lines duly sholdering, breazing ,copper welding all as per manufacturer of capacity 22 TR capacity complete all as specified and directed.
50supply & fix in renewal, heavy duty copper tubing suitable for package type AC unit gas piping of size 9/8" with insulating material and fixing supports/ saddles etc as required at site to match existing line complete all as specified and directed.
51supply & fix in renewal, heavy duty copper tubing suitable for package type AC unit gas piping of size 7/8" with insulating material and fixing supports/ saddles etc as required at site to match existing line complete all as specified and directed.
52supply & fix in renewal, pin type HP/LPpin type cut out switch suitable for and including fixing by copper welding on discharge/ suction line of 11 to 5.5 TR capacity package type AC plant unit complete all as specified and directed.
53supply & fix in renewal, suction/discharge line control valve of size 9/8" to 7/8"suitable for and including fixing by copper welding on discharge/ suction line of 11 to 5.5 TR capacity package type AC plant unit complete all as specified and directed.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail