}

Tender For Manning And Operation Including Repair Maintenance Of Ac Plants At Htl Whjbc Pms Igloo Dbm Mtp Plants And Repair Maintenance Of Duct Tower Ac Including Fire Alarm System Under Ge Sb Karwar, vasco-Goa

Military Engineer Services-MES has published Tender For Manning And Operation Including Repair Maintenance Of Ac Plants At Htl Whjbc Pms Igloo Dbm Mtp Plants And Repair Maintenance Of Duct Tower Ac Including Fire Alarm System Under Ge Sb Karwar. Submission Date for this Tender is 04-12-2023. Alarm Systems Tenders in vasco Goa. Bidders can get complete Tender details and download the document.




Tender Notice

40426655
Corrigendum : Tender For Manning And Operation Including Repair Maintenance Of Ac Plants At Htl Whjbc Pms Igloo Dbm Mtp Plants And Repair Maintenance Of Duct Tower Ac Including Fire Alarm System Under Ge Sb Karwar
Open Tender
Indian
Goa
vasco
04-12-2023

Tender Details

Manning And Operation Including Repair Maintenance Of Ac Plants At Htl Whjbc Pms Igloo Dbm Mtp Plants And Repair Maintenance Of Duct Tower Ac Including Fire Alarm System Under Ge Sb Karwar

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 09-Nov-2023 CORRIGENDUM NO 1 BOQ 27-11-2023
2 27-Nov-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 04-12-2023

Key Value

Document Fees
INR 1000 /-
EMD
INR 223000.0 /-
Tender Value
INR 1.48 Crore /-

BOQ Items

NAME OF WORK: MANNING AND OPERATION INCLUDING REPAIR & MAINTENANCE OF AC PLANTS AT HTL, WHJBC, PMS, IGLOO, DBM, MTP PLANTS AND REPAIR & MAINTENANCE OF DUCT/TOWER AC’S INCLUDING FIRE ALARM SYSTEM UNDER GE (SB) KARWAR.
Sl. No. Item Description
1SCH "A" PART-I (MAINTENANCE OF AC PLANTS)
2M&L dismantling electric motor of any make, 3 phase 415V of following capacity, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding as per manufacturer design including varnishing & drying and re-assemblingthe motor, connecting with proper alignment and testing complete including transporting to workshop for rewinding complete all as specified and as directed.
3(a) 15 HP
4(b) 10 HP
5(c)7.5 HP
6(d)5 HP
7(e) 1 to 3 HP
8M & L for Servicing of water pump split casing type set by removing & dismantlingpump andconnected pipes & electric connections etc and replacing of unserviceable parts with new gland packing set Gun metal bushes, bearing, water seal packing complete cleaning of impeller greasing etc reassembling and refixing in original position complete with packing and necessary nut & belt etc including testing for smooth functioning etc of following capacity all as specified and as directed.
9(a) 15 hp
10(b) 7.5 hp
11(c ) 5 hp
12Supply & Fix in repairs scroll compressor 13 TR from the unit after disconnecting electrical wiring & piping connection nuts & bolts etc supply & install of new scroll compressor13 TR capacity and connecting pipe line for existing piping brazing & electric connection etc. at IGLOO,DBM,PMS complete all as specified and asdirected.
13All as per item No. 3 but for 5.5 TR
14M & L for disconnecting condenser for descaling & Plugging them & providing of 15 mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be usedfor descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7 flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulatingdiluted acid solution as specified above & PH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified and as directed for the following :
15(a) 3x 120 TRat MTP
16(b) 3x26 TRat IGLOO
17(c) 3x30 TR at PMS
18(d) 2x30 TRat WHJBC
19(e) 3x39 TR at DBM
20Pumping down the plant to preserve the existing refrigerant gas & leak testing of 26/30/39TR chiller package unit by charging of Nitrogen gas in to entire plant & monitoring for 24 Hrs to find the leakages, rectificationof leak by brazing and replacement of necessary gasket packing as wherever required including copper tubes of suitable size vacumizing of the plant by vaccum pump and keeping 24 hrs for testing including rectification of leakages if any finally recharging of existing refrigerant gas to the plant & topping up of refrigerant if required to maintain the standard pressure complete testing of the plant for smooth functioning at IGLOO , DBM ,PMS , WHJBCcomplete all as specified and as directed
21All as per Item No.6 but for 11 TR chiller unitof Package AC plant at HTLcomplete all as specified and as directed.
22Supply & charge refrigerant (R - 22) gas as per requirementcomplete all as specified and as directed
23Topping up / Replacement of compressor oil with new compressor oil complete all as specified and as directed
24Supply & Fix in repair for the following Itemscomplete all as specified and as directed.
25(a)Water Flow Switchcomplete all as directed .
26(b) Moisture liquid indicators.
27(c) Single phase preventor for compressor /Motor for SM 101 GIC
28(d)Strip type 3 KW Heaters
29(e)Strip type 2.0 KW Heaters
30(f) Pressure gauge 0-300 PSI .
31(g)Pressure gauge 0-150 PSI
32(h) Crank case heater 250 W suitable for 39/30/26 TR CHW plant
33(j) Filter drier core for 120/39/30/26 TR Central AC Plant
34(k) LP/HP cut out switch for 39/30/26 TR Central AC Plant
35(l )V belt for Cooling tower . Make : Fenner/Dunlop
36(m)Float Valve for 25 mm
37(n)Cooling tower fins of size 4"x6"
38(o) AHU belt
39M&L for applying one coat of synthetic enamel paint as per colour code with spray machine on surfaces of 3X120/3x30/3x26/3x39 TRcentral AC plant comprising compressor motor, Pump, water pipe lines etc by filling cavities if any with filler including preparation of surfaces & indication markings at PMS/WHJBC/IGLOO/DBM/MTPcomplete all as specified and as directed
40Taking down motor, blower fan assembly from cooling Tower, removing unserviceable fins , & providing new PVC fins of size 4"x6" ,after cleaning of Louvers, drift eleminators fill surface by moderate pressure water nozzle to remove all surface impurities incl removal of rust/scale, scrapping down the hard water deposited from bottom tray with chemical andpreparing the surfacesand painting with one coat of anticorrosive paint to match with existing colour, servicing of fan and motor assembly including removal of dust, oil, scale of motor body and replacing of unserviceable nozzle,bearings ,painting with anti corrosive paint, draining and filling of bearing housing with new SAE 20 grade mineral oil, greasing of bearing with IOCL mobilux etc ,& reassembling complete of following cooling towerscomplete all as specified and as directed
41(a) FRP Cooling tower capacity 450 USGPMAT MTP
42(b) 101 USGPM at IGLOO
43(c) 141 USGPM at DBM
44(d) 75 USGPM at PMS/WHJBC
45Note: (a)Defective parts of plants will be replaced and measured under respective item of this schedule. (b) Fins, bearing , float valve reqd for replacement will be measured under under respective item of this schedule.
46Removing old unserviceable insulation of chilled water pipe line and cleaning the surface & applying one coat of TPRA coat & M & L for wrapping on MS Chilled water pipe line with 50/40 mm thick fiber glass wool moulded to shape the thermal insulation in selection of 50 mm crown wrapped with chicken mesh wire netting 20 SWG and 20mm mesh & aluminium cladding with 24 SWG aluminum sheet on 150/100 mm dia MS chilled water pipe linecomplete all as specified and as directed
47Supply & fixing in repairNitrile insulation layers of size 25 mm thickness sticking on the chiller surface by using approved adhesive and ceiling joint by weather proof tape after removing unserviceable nitrile insulation from the chiller & cleaning complete all as specified and as directed.
48Supply and fixing in repair fine filters5 Microns as per exisiting make complete all as specified and as directed.
49Supply and fixing in repair pre filters 10 Micronas per exisiting make complete all as specified and as directed.
50Supply & Fix in repairs MS pipe heavy grade 80 mm dia including removing of unserviceable MS pipe medium grade of 80 mm diacomplete all as specified and as directed
51(b) Supply & Fix in repairs MS pipe heavy grade 100 mm dia including removing of unserviceable MS pipe medium grade of 100 mm diacomplete all as specified and as directed
52(c) Supply & Fix in repairs MS pipe heavy grade 40 mm dia including removing of unserviceable MS pipe medium grade of 40 mm diacomplete all as specified and as directed
53(d) Supply & Fix in repairs MS pipe heavy grade 50 mm dia including removing of unserviceable MS pipe medium grade of 50 mm diacomplete all as specified and as directed
54(e)Supply & Fix in repairs butter fly valve 50 mm dia including removing of unserviceable butter fly valve of size 40/50 mm dia complete all as specified and as directed
55(f)Supply & Fix in repairs butter fly valve 100 mm dia including removing of unserviceable butter fly valve of size 100 mm dia complete all as specified and as directed
56M&L dismantling electric motor of any make, 3 phase 415V of 120 TR capacity, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding as per manufacturer design including varnishing & drying and re-assemblingthe motor, connecting with proper alignment and testing complete including transporting to workshop for rewindingcomplete all as specified and as directed
57Labour only for overhauling Compressor 120 TR of make "YOKE" , reassambling with new spares, reinstalling, relighting, testing on load to recover the existing gas, flushing the system and leakage testing , presure testing & gas charging etc complete all as specified and as directed.
58Note :- (a) Spares require will be measured and paid seperately. (b)Labour for fixing the spares is included in the rate quoted for above item.
59Supply only following spares required for Compressorcomplete all as specified and as directed
60(a) Suction retaining plate
61(b) Suction Reed
62(c ) DV assembly
63(d) Suction spring
64(e) Unloader Spring
65(f) Gasket set Non absestor
66(g) Connecting rod
67(h) Piston
68(j) Piston lock ring
69(k) Piston ring set
70(l) Piston pin
71(m) Cylinder liner
72(n) Main bearing
73(o) Main thrust ring
74(p) Unloader pin lock
75(q) Oil pressure regulating valve
76(r ) Oil pump assembly
77(s) Oil filter
78(t) Liner Aluminium sims
79M & L Expansion valve of AC plant capacity 26/30/39/120 TR including taking down unserviceable valve complete all as specified and as directed.
80All as per Item No.26 but for7.5 TR
81PART-II :ROUTINE MAINTDUCT/ TOWER AC INCL COLD & COOL ROOM
82M&L for rectification of defects and making functional duct / floor mounted AC and cold room/cool room of any capacity incl rectification of minor defects such as tripping of MCBs, replacement of MCBs wherever necessary, rectifying loose electrical connections, making fresh connections in electric panel / connector / contactor/capacitor/relay etc, making functional of defective plug / cap etc, arresting condensate water leakage, checking function of compressor of any capacity etc complete all as specified and as directed. Note :- (i)Unit rate quoted shall include for maintaining proper record and obtain the signature of concerned user unit. (ii)Unit rate quoted shall include for sundry items / materials as required. (iii)MCB TPN 32/40 Amps will be measured and paid separately. (iv) Spare parts required will be measured and paid separately.
83M&L for periodical maintainance of duct AC of 5 Ton capacity including cleaning of overhead ceiling supported indoor unit complete, duct system, blower, outdoor unit, wiring system, cool air vent, checking function of fire damper, cleaing including, oiling / greasing of movable parts of indoor unit such as motor bearing etc, fresh electrical connections, checking insulation of wiring etc complete, all as specified and as directed.
84All as per item No 29 above but 7.5 Ton duct AC.
85All as per item No 29 above butfor 3 Ton Tower AC
86Labour only for leak testing including all allied works such as vaccumising the complete system, soap leak test, nitrogen gas pressure test, replacement of copper filters, capillary, copper tubing of suitable size and required length, flux, flare nut, dead plug, dead cap, brazing etc including necessary welding work, testing and commissioning upto satisfactory performance for the following :-
87(a)Refrigeration circuit of floor mounted Tower AC of capacity 3 Ton .
88(b) Refrigeration circuit of Duct AC of capacity 5 Ton .
89(c) 3 Nos of Refrigeration circuit of 2.5 Ton each for Duct AC of capacity 7.5 Ton. Note :- Qty of gas will be measured and paid separately.
90S&F in repairs reciprocationg compressor 3 phase 415 V, 2.5 Ton capacity Model No CR 36 K 6TF 6101- 01 No ofexisting make suitable for duct AC factory tested including taking out old compressor, pumping down refrigerant, bracing and flaring, topping up of refrigerant (labour only) connecting, testing and commissioning the compressorcomplete all as specified and as directed
91All as per item No 33 but for3 Ton capacity for floor mounted AC and Tower AC complete all as specified and as directed.
92All as per item No 33 but 5 Ton capacity for duct AC AG5560.complete all as specified and as directed.
93S&F in repairs propeller typefan / blower motor, single end shaft, single phase, 240 volts, 1/4 HP metallic body/PVC body for outdoor unit of duct / floor mounted AC suitable for Blue Star make all as specified and directed.complete all as specified and as directed
94All as per item No 36 but 1/2 HP for 5 TR duct ACcomplete all as specified and as directed
95S&F in repairsfan / blower centifugal type motor, double end shaft, single phase, 240 volts, 3/4 HP metalic body for indoor unit of duct AC suitable for Blue Star makecomplete all as specified and as directed
96S&F in repairs fan blade assembly for outdoor unit suitable for Blue Star make following capacitiescomplete all as specified and as directed
97(a) 3.0 TR Capacity of floor mounted AC /tower AC
98(b)5 TR capacity of duct AC
99(c)7.5 TR capacity of duct AC
100M&L for taking down unserviceable fan blower motor of 1/4 HP capacity from outdoor unit of duct / floor mounted AC and rewinding motor, varnishing, drying etc, replacement of bush, assembly etc suitable for Blue Star make and fixing it back complete all as specified and as directed.
101M&L for taking down unserviceable fan blower motor of 1/2 HP capacity from outdoor unit of duct / floor mounted AC and rewinding motor, varnishing, drying etc, replacement of bush, assembly etc suitable for Blue Star make and fixing it back complet all as specified and as directed.
102M&L for taking down unserviceable fan blower motor of 3/4 HP capacity from outdoor unit of duct / tower AC by removing ceiling boards, disconnecting electrical connection, rewinding motor varnishing, drying etc, replacement of bush, assembly etc suitable for Blue Star make and fixing it back complet all as specified and as directed.
103S&F in repairs 12 way wiring connector terminal for duct AC / tower ACcomplete all as specified and as directed
104S&F in repairs PVC air filter for floor mounted AC 3 Ton capacity complete all as specified and as directed
105S&F in repairs pendent control assembly with cord and PC circuit Model 050D suitable for Blue Star make duct AC of 5/ 7.5 Ton capacitycomplete all as specified and as directed
106S&F in repairs overload relay for 5 Ton compressor of Duct AC complete all as specified and as directed
107S&F in repair overload relay for 2.5/3 Ton compressor of Duct AC complete all as specified and as directed
108S&F in repairs flexible cord, 3 core, copper conductor 2.5 Sqmm complete all as specified and as directed
109S&F in repairs single phase preventer cum controller for operation of floor mounted AC of 3 Ton capacity complete all as specified and as directed
110S&F in repairs including brazing of copper tube size 5/8 suitable for duct / floor mounted Acscomplete all as specified and as directed.
111S&F in repair including brazing of copper tube size 3/8 suitable for duct / floor mounted Acscomplete all as specified and as directed
112S&F in repair copper tube insulation with heatlon or Superlon insulation material complete all as specified and as directed
113Supply only 3 phase contactor 3 TF 3101-08, 400 V suitable for duct AC / floor mounted ACcomplete all as specified and as directed
114Supply & fix in repairs capacitor of 10-36mfd, plastic bodycomplete all as specified and as directed
115Taking out carefullly oldOld unserviceable cooling coil condensorof7.5 TR duct AC ( outdoor unit) and supply and fixing new cooling coil condensor of outdoor unit of 7.5 TR duct AC and make functional including testingcomplete all as specified and as directed
116Supply and fixing in repair MCB TPN 32to 40 Ampscomplete all as specified and as directed
117Supply and fixing in repairremote control unit for 5 TR, 7.5 TR duct AC and 3TR floor mounted AC,complete all as specified and as directed
118PART-III :ROUTINE MAINT OF FIRE ALARM SYSTEM
119Supply & Fix in repair Manual Call Point (MCP) complete all as specified and as directed
120Supply & Fix in repair Glass break MCPcomplete all as specified and as directed
121Supply & Fix in repair Addresable thermal detector with flash scan complete all as specified and as directed
122Supply & Fix in repair Addresable Relay module with flash scan provides two form-C dry contacts that switch together complete all as specified and as directed
123Supply & Fix in repair Addresable control module with flash scan configured for one class A or Class B NAC complete all as specified and as directed
124Supply & Fix in repair Addresable mini monitor module with flash scan supervises either a class A or class B circuit of N.D. dry-contact input devices complete all as specified and as directed
125Supply & Fix in repair Hooter cum strobe system sensor complete all as specified and as directed
126Supply & Fix in repair UV detector complete all as specified and as directed
127Supply & Fix in repairs Adressable duct detector complete all as specified and as directed
128Supply & Fixing in repair of Network Announciator Panel complete all as specified and as directed
129Supply & Fixing in repair of OFC Network card complete all as specified and as directed
130Labour only for Non Comprehensive Routine maintenance checkup of Fire alarm system"s error and alarms, necessary inspection of the Fire alarm system and take necessary corrected actions,resolve any issues regarding the system and take corrective actions for the problems , check connectivity and communication at all terminations,check all power sources and outlets used in the system complete for 12 Nos panels of Fire alarm system by authorised service engineer of OEM and furnish the report complete all as specified and as directed
131Supply & Fix in repairs lead acid typebattery of 12 Volts 7 AH capacity complete all as specified and as directed
132PART-IV :MANNING AND OPERATION
133Manning & operation of central AC plantwith package chillercondensingunit complete of 3Nos. 26 Ton (Make:-BLUE STAR , Model No. LCWS2-026at IGLOO completewith cooling tower, AHU & other accessories each for 24 hrs3 shifts around the clock run daily
134a) Water cooled package chiller unit model LCWS2-026 -03Nos.
135b) Chillerwater pump motorModel ND-112 Mcapacity 5 hp, Make - Crompton Greaves -03Nos
136c) Chillerwater pump set Model 2U1 capacity 83 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos
137d) Condeser water pump set Model 2U1 capacity 83 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos
138e) Condeser water pump motorModel ND-112Mcapacity 5 hp, Make - Crompton Greaves -03Nos
139f) Air handlingunit model ESHW06-220 of capacity 22277 cmhwith blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -02 No. Make - Blue Star
140g) FRP Cooling tower capacity 101 USGPM , Model No SM2/6C/1.5 with CT fan-03No. Make Mihir Engr Ltd
141h) Electrical control panel cubical typefloor mountedwith maintswitch MCB"s voltmeter, Ammeter, StarterCondenseretc. complete-01Set.
142j) Controldevicessuch asexpansive valve thermostatsolenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.
143k) Digittype thermometer-01 Set
144l) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.
145m) Condenser piping MS 100/80/50mm dia with valves pressure gaugetemperature gauge complete -1Set.
146Manning & operation of central AC plantwith package chillercondensingunit complete of 3Nos. 39 Ton (Make:-BLUE STAR , Model No. LCWS3-039 at DBM completewith cooling tower, AHU & other accessories each for 24 hrs3 shifts around the clock run daily
147a) Water cooled package chiller unit model LCWS3-039 -03Nos.
148b) Chillerwater pump motorModel ND-112 Mcapacity 5 HP, Make - Crompton Greaves -03Nos
149c) Chillerwater pump set Model 2U1 capacity 141 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos
150d) Condeser water pump set Model BWC 50/80 capacity 141 USGPM at 25 Mtr head , Make Becon Weir Ltd -03Nos
151e) Condeser water pump motorModel ND-132Scapacity 7.5 HP , Make - Crompton Greaves -03Nos
152f) Air handlingunit model ESHW06-270 of capacity 29549 cmhwith blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -02 No. Make - Blue Star
153g) FRP Cooling tower capacity 141 USGPM ,Model No SM2/7.5C/2with CT fan-03No. Make Mihir Engr Ltd-03 Nos
154h) Electrical control panel cubical typefloor mountedwith maintswitch MCB"s voltmeter, Ammeter, StarterCondenseretc. complete-01Set.
155j) Controldevicessuch asexpansive valve thermostatsolenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.
156k) Digittype thermometer-01 Set
157l) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.
158m) Condenser piping MS 100/80/50mm dia with valves pressure gaugetemperature gauge complete -1Set.
159Manning &operation of central AC plant DX typecondensingunit complete of 3Nos. 30Ton (Make:-BLUE STAR , Model No. WCUS2-030at PMS building, MTP completewith cooling tower AHU & other accessories each for 24 hrs3 shifts around the clock run daily
160a) Water cooled DX unit model WCUS2-030-03Nos.
161b) Condeser water pump set Model 2U1 capacity 75 USGPM at 25 Mtr head , Make -Becon Weir Ltd -03Nos
162c) Condeser water pump motorModel ND-112 Mcapacity 5 HP, Make - Crompton Greaves -03Nos
163d) Air handlingunit with blower motor, heater bank, cooling coil, electric control panel complete installed in AHU room -01 No. Make - Blue StarModel ESHX6-160 of 19440 cmh
164e) FRP Cooling tower capacity 75 USGPM ,Model No SM1/9B/1.5with CT fan-03No. Make Mihir Engr Ltd-03 Nos
165f) Electrical control panel cubical typefloor mountedwith maintswitch MCB"s voltmeter, Ammeter, StarterCondenseretc. complete-01Set.
166g) Controldevicessuch asexpansive valve thermostatsolenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.
167h) Digittype thermometer-01 Set
168j) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.
169k) Condenser piping MS 100/80/50mm dia with valves pressure gaugetemperature gauge complete -1Set.
170Manning &operation of central AC plant DX typecondensingunit complete of 2 Nos. 30Ton (Make:-BLUE STAR , Model No. WCUS2-030at WHJBC building,completewith cooling tower AHU & other accessories each for 24 hrs3 shifts around the clock run daily
171a) Water cooled DX unit model WCUS2-030-02 Nos.
172b) Condeser water pump set Model 2U1 capacity 75 USGPM at 25 Mtr head , Make -Becon Weir Ltd -02 Nos
173c) Condeser water pump motorModel ND-112 Mcapacity 5 HP, Make - Crompton Greaves -02 Nos
174d) Air handlingunit with blower motor, heater bank, cooling coil, electric control panel complete installed in AHU room -01 No. Make - Blue StarModel ESHX4-120 of 14076 cmh
175e) FRP Cooling tower capacity 75 USGPM ,Model No SM1/9B/1.5with CT fan-03No. Make Mihir Engr Ltd-03 Nos
176f) Electrical control panel cubical typefloor mountedwith maintswitch MCB"s voltmeter, Ammeter, StarterCondenseretc. complete-01Set.
177g) Controldevicessuch asexpansive valve thermostatsolenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.
178h) Digittype thermometer-01 Set
179j) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.
180k) Condenser piping MS 100/80/50mm dia with valves pressure gaugetemperature gauge complete -1Set.
181Manning & Opeartionof Central AC Plantwith package chiller condensing unit complete of 02 Nos working & 01 No Stand by,Each 120 Ton Capacity (Make :-BLUE STAR, Model No. LCWR 1-120 at MTP storages AC Plant complete with cooling tower, AHU & other accessories in 3 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipments as mentioned below:-
182(a)Water cooled package chiller unit model LCWR 1-120 - 03 Nos
183(b) Chiller water pump motor model ND-160 M capacity 15 HP,Make- Crompton Greaves - 03 Nos
184(c) Chiller water pump set Model BWC 80/100 capacity 360 USGPM at 30 Mtr head,Make-Beacon Weir -03 Nos
185(d) Condenser water pump set Model BWC 80/100 capacity450 USGPM at 25 Mtr head,Make-Beacon Weir-03 Nos
186(e) Condenser water pump motor Model ND-160 L capacity 15 HP,Make- Crompton Greaves - 03 Nos
187(f) Air handling unit model ESHW4-350 of capacity 36396 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete-04 Nos. Make- Blue Star
188(g) FRP Cooling tower capacity 450 USGPM, Model AQ 3870 with CT fan-03 Nos Make- Paharpur
189(h)Electrical control panel cubical type floor mounted with maint switch MCBs volmeter, Ammeter, Starter Condenser etc. complete-01 set
190(j)Control devices such as expansive valve thermostat solenoid valve HP/LP/CP cut outs with panel board installed gauges-01 set.
191(k)Digit type thermometer - 01 set
192(l)Air supply duct with grill diffusers, dampers and heater etc complete - 04 sets
193(m)Condenser piping MS 100/80/50 mm dia with valves pressure gauge, temperature gauge complete-01 set.
194Note for item No.71-75 above (a) Contractor has to employ following staff for manning & operation of the AC plants at each shifts of 8 hours
195(i) One No operator having minimum ITI qualification in Ref Mech/Electrician trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of AC plants in each shift of 8 hrs (Total 3 shifts )( for item No. 71-75)
196(b) Contractor will maintain proper records of all kinds of daily, weekly , monthly, quarterly, half yearly, yearly or whatsoever maintenance is carried out during contract period in a binded book/register and will obtain the signature of Engineer-in-Charge
197(c) The operator/helper will ensure general cleanliness and upkeep of the installation on daily basis.
198(d) The routine maintenance/checks shall be strictly carried out by the operator all as per the list of routine maintenance activities with periodicity as per appendix "A" to PS hereinafter attached.
199(e) The unit rate quoted shall deemed include for maintenance for earthpits, cutting & removing of vegitation and upkeep of the surrounding area, all around the bldg upto 6m from the plinth protection all as directed by Engr-in-Charge. In case of failure, a penalty of Rs 2000/- per month will be levied and recovered from dues. (f) The contractor shall provide 02 uniforms to each operator & helper and design of uniform shall be got approved.In case of failure, a penalty of Rs 2000/- per uniform will be levied and recovered from dues. (g) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation at twice the cost of a day’s Manning & Operation derived from pro rata rate ofSch ‘A’ quoted rates.
200(h) The Contractor shall pay the wages to the operators/helpers (as applicable) through e-payment i.e Adhaar linked bank accounts (credit to their bank account). Engineer-in-charge shall ensure that e-payment made to operator/helpers and their wages shall not be less than minimum wages fixed by state Govt or Central Govt whichever is more. Monthly e-banking statement shall be furnished by the contractor to the Engineer-in-charge and the same shall be kept in record duly verified. (j) It is the responsibility of contractor to deposit the employees provident fund (EPF) to the concerned authority as per the prevaling scales as laid down by Ministry of labour for all operator/helper (as appliable) and necessary proof to this regard shall be submitted to the Engineer-in-charge for verification & record.The quoted rates shall be deemend to be included of above provisions.In case contractor fails to produce the proof of EPF, the same shall be recovered from his dues as per the prevailing scale plus 15 percent profit. (k) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department.
201(l) Defective parts of plants will be replaced and measured under respective item of this schedule.
202(m)Power supply for operating the installations will be made availiable by department free of cost.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail